Preparation
PREPARE THE OPENING
Installation over a Wall Oven:
30"
25-1/4"
17-1/2"
45-1/4"
Min.
• If you are replacing an electric double oven
with the combined installation of
an Advantium 240V and a single oven, use the
dimensions shown. The middle rail separating
the two openings may need to be larger than
the 2" minimum shown.
Installation Preparation
WITHOUT
(CONT.)
23-1/2"
Construct
Solid Bottom
Min. 3/8"
Plywood
Supported by
2x4 or 2x2
Runners all
Four Sides
2" Min.
(3" recommended)
Per Oven
Requirement
an Accessory Storage Drawer
PREPARE THE OPENING
Installation over a Wall Oven and
Warming Drawer:
30"
17-1/2"
45-1/4"
Min.
Per warming drawer requirement
NOTE: Additional clearances between the
cutouts may be required. Check to be sure
the oven supports above the Warming Drawer
location do not obstruct the required interior
depth and height. See Warming Drawer
installation instructions for details.
CAUTION
mounting surface must be capable of supporting
the cabinet load, in addition to the added weight
of the oven and drawer, plus additional oven
loads.
PRECAUCIÓN
personal, la superficie de montaje deberá
poder soportar la carga del gabinete, además
del peso agregado al horno y al cajón, junto
con las cargas adicionales en el horno.
7
(CONT.)
Construct
Solid Bottom
23-1/2"
Min. 3/8"
Plywood
Supported
by
2x4 or 2x2
25-1/4"
Runners all
Four Sides
2" Min.
(3" recommended)
Per Oven
Requirement
2" Min.
For personal safety, the
Para su seguridad