Quick Links

VERTICAL BLINDS
GETTING STARTED
A few simple tools are required:
Steel Tape Measure
Power Drill and
Flathead & Phillips
Drill Bits
Included in your order is all the hardware necessary for a
normal installation. Depending on the mounting surface,
fasteners other than the screws provided may be required.
Wall board and plaster require the use of anchors such as
expansion or toggle bolts. Bricks, tile and stone need special
plugs and drill bits. Wood should always be pre-drilled to
avoid splitting.
Professional installation is also available in most areas,
call 800-800-3329.
STANDARD HARDWARE
Screws
Tension Bracket
With Screws
1
| Vertical Blinds
Pencil
Level
(for outside mount)
Awl (or tool for starting
Screwdriver
a screw hole)
Inside Mount
L-Bracket
Headrail Clip
OPTIONAL HARDWARE
Corner End Cap
Plastic Corner
Corner Pieces
Valance Corner
For Vinyl Blinds
Fabric Vane Chain
Vane Weight
Valence Return
Outside Mount
(Closed)
Valance Clip
Fabric
loading

Summary of Contents for 3 Day Blinds VERTICAL BLINDS

  • Page 1 Wood should always be pre-drilled to avoid splitting. Fabric Vane Chain Fabric Professional installation is also available in most areas, Vane Weight call 800-800-3329. STANDARD HARDWARE Screws Inside Mount L-Bracket Headrail Clip Tension Bracket With Screws | Vertical Blinds...
  • Page 2 Valance is ready to be installed corner. • Repeat the above process for the other end of the valance. (Excess material may need to be trimmed from returns. Simply use scissors.) | Vertical Blinds...
  • Page 3 FOR CENTER OPEN BLIND WIDTH 41 " - 118" Place 2 Mounting Clip/Brackets on each end at 1 " and 3 " from the end. The remaining Mounting Clip/Bracket(s) should be evenly spaced throughout the headrail. | Vertical Blinds...
  • Page 4: Installation

    Make sure that the mounting clip is positioned straight and in line with the “tail” closest to the window. • Repeat this procedure for any additional mounting clips. | Vertical Blinds...
  • Page 5: Outside Mount

    • Mount the bracket using two of the screws provided and repeat this procedure for any remaining brackets making sure all brackets are installed level and in line. • Go to “Outside Mount Valance Installation”. | Vertical Blinds...
  • Page 6: Ceiling Mount

    • Mount the bracket using the fasteners purchased. • Repeat this procedure for any remaining brackets making sure that all brackets are installed straight and in line. | Vertical Blinds...
  • Page 7 “latch” supplied Cord Tensioners and onto or stick to one another. Simply use a dryer sheet or a hardware should be used. damp cloth and mild detergent to wipe down the vanes and remove the static. | Vertical Blinds...
  • Page 8: Mounting Options

    Option C Inside Mount with Bracket Outside Mount • Attach the bracket to the mounting bracket to the Cord Tensioner. The screw hole in the Cord Tensioner fits into the nub on the bracket. Outside Mount (3 Screws) | Vertical Blinds...
  • Page 9 Cord Tensioner. CAUTION: Do not put the screw hole all the way to the bottom of the slot as this may cause the cord to become too tight and increase cord wear. | Vertical Blinds...
  • Page 10 Fasteners provided with the tension device may not be appropriate for all mounting surfaces. Use appropriate anchors for the mounting surface conditions. ANSI/WMCA A100.1-2012 5.2.4 800-800-3329 | 3dayblinds.com Part #PM-036 © 3 Day Blinds Corporation 9/14. | Vertical Blinds...