Daikin AllWorld Eco-Rich UEHU25-M07-15-30-V Quick Start Manual

Daikin AllWorld Eco-Rich UEHU25-M07-15-30-V Quick Start Manual

Pressure settings procedures for hybrid hydraulic unit

Quick Links

ITEMS NEEDED TO SET ECO-RICH:
1. Screwdriver
2. Wrench
The following steps must be completed before any settings and adjustments
can be made to your Eco-Rich U-EHU25-M07-15-30-V:
1. Connect 3 phase power (200 VAC ~ 230 VAC)
2. Fill oil reservoir to correct oil level. (Oil Weight ISO32 ~ ISO 68)
3. Remove transport stabilizing bolts, located next to the motor isolators.
4. Connect pressure and return lines.
5. Connect alarm wires from machine (most machines do not require this step).
6. Turn power on to machine and hydraulic unit.
7. Make sure machine is in a standby state and is not actuating any valves or cylinders.
Pressure Settings Procedures
For Eco-Rich Hybrid Hydraulic Unit
Model: UEHU25-M07-15-30-V
All World Machinery Supply
Phone (815) 943-9111 ~ Fax (815) 943-5370
MPa
loading

Summary of Contents for Daikin AllWorld Eco-Rich UEHU25-M07-15-30-V

  • Page 1 Pressure Settings Procedures For Eco-Rich Hybrid Hydraulic Unit Model: UEHU25-M07-15-30-V ITEMS NEEDED TO SET ECO-RICH: 1. Screwdriver 2. Wrench The following steps must be completed before any settings and adjustments can be made to your Eco-Rich U-EHU25-M07-15-30-V: 1. Connect 3 phase power (200 VAC ~ 230 VAC) 2.
  • Page 2 FIG 1: Top View Assembly MODE DOWN RETURN Initial Procedures Break locknut “A” free, using a crescent wrench. Turn the over pressure adjustment valve “B” clockwise until the adjuster bottoms out, making sure that locknut “A” is not preventing you from bottoming out the over pressure valve.