Summary of Contents for Stuart Turner Mainsboost Plus
Page 1
Please leave this instruction booklet with the home owner as it contains important guarantee, maintenance and safety information Read this manual carefully before commencing installation. This manual covers all Mainsboost Plus vessels for vertical and horizontal units. Mainsboost Plus CE compliant product...
Page 2
Mainsboost Plus consists of three key assemblies, the Mainsboost vessel, charger MJ3 pump and upstream line-in kit. APPLICATION Mainsboost Plus is designed to offer stored clean, potable cold water under pressure for all domestic or small commercial applications where mains water is insufficient to offer consistent and reliable water services.
CHECKLIST IMPORTANT: Your Mainsboost Plus water performance system will be delivered in a minimum of three boxes on one pallet. Please check the contents within 24 hours of receipt and if any component is damaged, please contact Stuart Turner Ltd immediately.
Page 5
CHECKLIST Mainsboost Plus (Horizontal) (available in MBP 200SH and MBP 250SH vessels only) Mainsboost Plus horizontal is supplied with the pump assembly pre-assembled onto the cylinder. Package 1 Upstream line-in kit Fig. 4 5 (Hoses supplied loose shown as such)
‘Mainsboost’ ‘Mainsboost Plus™’ and ‘Mainsboost Charger’ are registered Trademarks of Stuart Turner Ltd. The use of this system is patent protected and the Mainsboost Plus vessel cannot be mixed with other accumulator systems without prior approval from Stuart Turner Ltd.
2.13 The minimum allowable water temperature is 4 C. Pipework - General 2.14 Secure pipework: Ensure pipework to and from the Mainsboost Plus is independently supported & clipped to prevent forces being transferred to inlet and outlet branches of pump. Flexible hoses supplied must be used.
3 LOCATION - GENERAL 3.11 Access: For emergencies and maintenance the Mainsboost Plus must be easily accessible. 3.12 Protection: The system must be located in a dry position, and protected from freezing. Avoid environments which have a high ambient temperature, high humidity or excessive condensation and salt damage, etc.
4.13 Downstream The term ‘Downstream’ refers to the system configuration from the outlet tapping on the Mainsboost Plus Pump, along the distribution header (if configured in this way) and into the distribution pipework and outlets. This includes hot and cold services where both are present (see Fig. 8).
5 CONFIGURATION 5.11 Mainsboost Plus is a very flexible solution, offering a patent protected packaged system to suit any type or size of building no matter how large or small the demand is. The following illustrations depict just some of the most typical installations.
Page 11
Note: If a water softener is to be fitted it must be located between the upstream line-in kit and pump/vessel. If high pressure is also required to the drinking tap fit a Stuart Water Conditioner, available from Stuart Turner, rather than a water softener.
6 INSTALLATION Step 1: Remove the Mainsboost vessel from its packaging and check to ensure it is not damaged. Carefully turn the vessel on its side using the discarded packaging to protect it. WARNING: depending on cylinder size this may require two people to complete safely.
Page 13
Note: Do not forget if a water softener is to be installed this has to be included in this pipe run, and additional space must be allocated for this. Do not fit smaller pipework than the upstream line-in kit accepts as this will impair performance.
Page 14
Step 2: The vessel assembly should then be positioned and checked to ensure there is sufficient space to install the upstream line-in kit between the stopcock and pressure vessel inlet. Refer to the chart below as a guide. Pipe Minimum pipe length required to install the Size upstream line-in kit (mm) (A) 22 mm...
7 ELECTRICAL 7.11 Regulations: The electrical installation must be carried out in accordance with the current local regulations by a qualified person. 7.12 Safety: In the interests of electrical safety a 30 mA residual current device (R.C.D. not supplied) should be installed in the supply circuit. This may be part of a consumer unit or a separate unit.
Page 18
7.21 If the supply cord is to be changed or damaged, it must be replaced by a special cord available from Stuart Turner or one of its approved repairers. Cont ... - 18 -...
8 COMMISSIONING 8.11 System check: Ensure that the electrical supply to the pump is switched off before opening the mains water supply stopcock and checking for leaks. 8.12 Check vessel pre-charge pressure: It is important to have the correct pre-charge pressure in the vessel for your site conditions to optimise performance.
Page 20
8.15 Control module: The control module has been factory pre-set to the following conditions. Settings as per factory preset: Set point SP: 3 bar Diff pressure DIFF: 0.5 bar Low pressure LPR: 0.2 bar High pressure HPR: 4.5 bar Pump run timer PRT: 180 Pump number NPM: 2 (do not tamper)
Page 21
8.16 On completion of the installation, follow the commissioning process below. Leave pump power switched off. Leave all outlet valves closed. Turn on stopcock and open inlet ballvalve, both pressure gauges on inlet and PRV will start to show movement as the mains pressure fills the system. Check for leaks on all joints made.
*Note: The maximum pressure that can be applied to the system under any installation conditions. ** Note: At typical working pressure Stuart Turner reserve the right to amend the specification in line with its policy of continuous development of its products. - 22 -...
Page 23
9.11 Noise: The equivalent continuous A-weighted sound pressure level at a distance of 1 metre from the pump does not exceed 70 dB(A). 9.12 For applications where noise levels are a primary consideration, a sound attenuation cover is available as an optional extra which reduces sound levels by up to 15 dB(A) or the Mainsboost Charger™...
Remote alarm option A remote alarm option is available, the Charger unit would need to be ordered in advance pre-wired for this option. Please consult Stuart Turner. Attempting to change the Charger MJ wiring will invalidate the guarantee. 10.12 Alarm fault codes...
We are confident this product will give you many years of trouble free service as all our products are manufactured to the very highest standard. The Mainsboost Plus system consists of three key assemblies, the pump and upstream line-in kit are covered by the three year guarantee and the Mainsboost vessel has a five year guarantee.