Installation; Unpack And Inspect - GE M60 Instruction Manual

Motor protection system
Hide thumbs Also See for M60:
Table of Contents
M60 Motor Protection System
Chapter 3: Installation

Installation

This chapter outlines installation of hardware and software. You unpack, check, mount, and wire the unit, then install the
software and configure settings.

3.1 Unpack and inspect

Use this procedure to unpack and inspect the unit.
1.
Open the relay package and check that the following items have been delivered:
M60
Mounting screws
GE EnerVista™ DVD (software and documentation)
M60 Instruction Manual (soft copy on DVD; printed copy if ordered)
UR Series Communications Guide (soft copy on DVD; printed copy if Instruction Manual ordered)
Certificate of Calibration
Test Report
EC Declaration of Conformity
2.
Inspect the unit for physical damage.
3.
View the rear nameplate and verify that the correct model has been delivered. The model number is at the top right.
4.
For any issues, contact GE Digital Energy as outlined in the For Further Assistance section in chapter 1.
5.
Check that you have the latest copy of the M60 Instruction Manual and the UR Series Communications Guide, for the
applicable firmware version, at
The Instruction Manual outlines how to install, configure, and use the unit. The Communications Guide is for advanced use
with communication protocols. The warranty is included at the end of this instruction manual and on the GE Digital Energy
website.
M60 MOTOR PROTECTION SYSTEM – INSTRUCTION MANUAL
http://gedigitalenergy.com/multilin/manuals/index.htm
3-1
Table of Contents
loading

Table of Contents