Table of Contents
Installation instructions
iNSTALL CEiLiNG
BRACKET
The ceiling
b*acket
nmst
be installed
when the duct
cover is used to span 24" or more
height
above
the
hood.
The bracket
will hold
the decorative
duct cover
in place
at the top.
Note:
The ceiling
bracket
is not required
when
using
only the 12" section
of the duct coves:
* Install
the 2 small screws
into the sides of the duct
bracket.
P,emove
the screws.
Pre-tapping
the holes
will insm'e
ease of final installation.
* Match
center
notch
on the bracket
to the centerline
on the wall and flush
against
the ceiling.
* Mark
the 2 screw hole
locations.
* Drill 1/8"
pilot holes
in marked
bracket
location.
'_ If pilot holes
do not enter
stt(ds,
enlarge
the holes
to
3/8"
and install
wall fastener
anchors.
* Secure
the bracket
to the rear wall with wood
screws
and washers.
Use wall anchors
if needed.
Note: Bracket has 2 sets of holes. Uselarger holes for wall
fasteners or wood screws with washers. Use smaller holes for
wood screws with washers.
Install
Ceiling Bracket
When Duct
Cover is
Used to Span
24" or More
See Step 9
to Install
Duct Cover
[6] CONNECT
DUCTWORK
• Push
duct
over the end
of the transition
tmtil it
reaches
the stop tabs.
• Install
ductwork,
making
connections
in direction
of
airflow
as illustrated.
• Secm'ejoints
in ductwork
with sheetmetal
screws.
• Wrap all duct joints
with duct tape
fin" an airtight
seal.
• Llse duct tape
to seal the flange
connection.
HouseDuctwork
Duct Tape
Over Seam
and Screw
Duct Tape
_,
Only for Proper
Operation
of Damper
low
.......
_Screw
_
Ductwork
_U
Duct
Stops
on
DuctTape
OverFlange
CAUTION:
sheet.,etal
scre*_s at the transition
to ductx_ork
connection.
Doing
so will pre_ ent proper
damper
operations.
Seal com_ection
*dth tape only.
16
Table of Contents
loading

Table of Contents