Installation procedure
4.Cutting and Flaring work of piping
Pipe cutting is carried out with a pipe cutter and burs must be removed.
After inserting the flare nut, flaring work is carried out.
A
Pipe diameter
Liquid side
6.35mm(1/4")
Gas side
9.52mm(3/8")
Correct
5.On drainage
Please install the drain hose so as to be downward slope without fail.
Please don't do the drainage as shown below.
It becomes
The end is
high midway.
immersed in
water
Please pour water in the drain pan of the indoor unit, and confirm that drainage is carried out serely
to outdoor.
In case that the attached drain hose is in a room, please apply heat insulation to it without fail.
Flare tooling die
Size A (mm)
0.8~1.5
1.0~1.5
Lean
Damage of flare
It waves.
Incorrect
Crack
It gap with the
ground ts too
small.
17
Partial
Too outside
Less than 5cm
There is the bad
smell from a
ditch.