Removal Of Pcb - Daikin CTXU25G2V1B Service Manual

Inverter multi system with humidifying
Hide thumbs Also See for CTXU25G2V1B:
Table of Contents
SiBE12-908
2.9

Removal of PCB

Procedure
Step
1.
Removal of the control
PCB
Remove the screw of
1
the electrical box cover.
2
Detach the insulation
sheet.
Removal Procedure
Warning
Be sure to wait 10 minutes or more after turning off all power supplies
before disassembling work.
Procedure
Electrical box (cover)
(R9955)
(R9956)
Insulation sheet
Earth terminal
(R9957)
Outdoor Unit
Points
Preparation
Remove the panels, plates,
and electrical box according
to the removal procedure.
The control PCB is adopted
upside-down.
The lead-free solder (PbF) is
used on PCB. When
exchange, use exclusive
solder and soldering gun.
The trimmed part goes front.
The terminal board is united
with thermal fuse.
236

Hide quick links:

Table of Contents
loading

This manual is also suitable for:

Ctxu35g2v1b2mxu40gv1bCtxu42g2v1b2mxu50gv1bCtxu50g2v1b

Table of Contents