Installation Preparation; Tools And Materials Required; Remove The Packaging - GE ZVC36LSS Installation Instructions Manual

30", 36", 48" custom hood insert
Table of Contents
Installation Preparation
TOOLS AND MATERIALS REQUIRED
(NOT SUPPLIED)
Aluminized
duct tape
Silicone
Pencil and tape measure
S
_
Safety glasses
"_
_
_;:_
_
Gloves
Knife
L J
1
Step ladder
Plumb line
Flashlight
_
1/4" pivoting
soo et
Needle-nose pliers
__
1" conduit (for remote
mounting only)
3/8" socket/
nut driver
Electric drill and
appropriate bits
Wire nuts
8" ducting and
caps as needed
Phillips and flat blade
Wire cutter/stripper
Strain relief
screwdrivers
REMOVE THE PACKAGING
CAUTION:
Wear gloves to protect
against sharp edges.
ATTENTION :
Portez des gants pour
_viter les blessures caus_es par les tranchants.
CAUTION:
LIFTTHE INSERT SLEEVE
OUT OF THE BOX BY GRASPING THE SIDES.
ATTENTION : SOULEVEZ
LE
HANCHON
INTERIEUR DE LA BOITE EN SAISISSANT
SES COTES.
1. Open hood carton.
2. Remove the liner, foam and cardboard.
3. Remove the tape securing the filters to the insert
sleeve, lift the tabs and remove the filters.
J
4. Unscrew the S nuts securing the damper vent
plate assemblg, and remove it from the insert
sleeve. Set the S nuts and the damper vent plate
assemblg
aside, as SOUwill be re-installing
it later
in the installation
process.
5. Remove the screws attaching
the insert sleeve to
the mounting
board. Discard the screws.
6. Grasp the insert sleeve bg the outside edges, and
lift straight up and out of the carton.
NOTE: Do not lift the insert sleeve bg the blower
motor,
7, Remove and properlg discard the plastic wrapping,
8, Remove the parts box and other packaging,
10
Table of Contents
loading

This manual is also suitable for:

Monogram zvc48lssMonogram zvc30lssMonogram zvc36lss

Table of Contents