[ II Restrictions ]
(4) Wiring method
1) Indoor/outdoor transmission line
Same as [5] 2.
Only use shielded cables.
Shielded cable connection
Same as [5] 2.
2) Transmission line for centralized control
Daisy-chain terminals A and B on the system controller, ter-
minals M1 and M2 on the terminal block for transmission line
for centralized control (TB7) on the outdoor units (OC) in dif-
ferent refrigerant circuits and on the outdoor units (OC and
OS) in the same refrigerant circuit. (Note b)
If a power supply unit is not connected to the transmission
line for centralized control, replace the power jumper con-
nector on the control board from CN41 to CN40 on only one
of the outdoor units.
If a system controller is connected, set the central control
switch (SW2-1) on the control board of all outdoor units to
"ON."
a) The outdoor units in the same refrigerant circuit are automat-
ically designated as OC and OS in the order of capacity from
large to small (if two or more units have the same capacity,
in the order of address from small to large).
b) If TB7's on the outdoor units in the same refrigerant circuit
are not daisy-chained, connect the transmission line for the
central control system to TB7 of the OC. (Note a).To main-
tain the central control even during an OC failure or a power
failure, connect TB7 on OC and OS together. (If there is a
(5) Address setting method
Proce-
Unit or controller
dures
1
Indoor
Main unit
unit
Sub unit
2
LOSSNAY
3
MA
Main
remote con-
remote
troller
controller
Sub
remote con-
troller
4
Outdoor unit (Note)
5
Auxiliary
BCcon-
troller (Sub)
outdoor
unit
BC control-
ler (Main)
The outdoor units in the same refrigerant circuit are automatically designated as OC and OS.
They are designated as OC and OS in the descending order of capacity (ascending order of address if the capacities are the same).
HWE09130
Ad-
dress
Setting method
setting
range
ŒAssign the smallest address to the main unit
IC
01 to
in the group.
50
ŒIn a system with a sub BC controller, make
the settings for the indoor units in the fol-
lowing order.
(i) Indoor unit to be connected to the main BC
controller
(ii) Indoor unit to be connected to sub BC
controller 1
(iii) Indoor unit to be connected to sub BC
controller 2
Make the settings for the indoor units in the
way that the formula "(i) < (ii) < (iii)" is true.
Assign sequential numbers starting with the
address of the main unit in the same group
+1. (Main unit address +1, main unit address
+2, main unit address +3, etc.)
LC
01 to
Assign an arbitrary but unique address to
each of these units after assigning an address
50
to all indoor units.
MA
No set-
tings re-
quired.
MA
Settings to be made with the Sub/
Sub
remote
Main switch
controller
ŒAssign sequential address to the outdoor
OC
51 to 100
units in the same refrigerant circuit.
OS
ŒThe outdoor units are automatically desig-
nated as OC and OS.(Note)
BS
51 to 100
Assign an address that equals the sum of the
smallest address of the indoor units that are
connected to the sub BC controller and 50.
BC
OC (or OS if it exists) +1
- 35 -
35
problem with the outdoor unit whose power jumper was
moved from CN41 to CN40, central control is not possible,
even if TB7's are daisy-chained.)
ŒOnly use shielded cables.
Shielded cable connection
Daisy-chain the S terminal of the terminal block (TB7) on the
system controller, OC, and OS with the shield of the shield-
ed cable. Short-circuit the earth terminal (
minal on the terminal block (TB7) on the outdoor unit whose
power jumper connector is mated with CN40.
3) MA remote controller wiring
Same as [5] 1.
When 2 remote controllers are connected to the system
Same as [5] 1.
Group operation of indoor units
Same as [5] 1.
4) LOSSNAY connection
Connect terminals M1 and M2 on the terminal block (TB5)
on the indoor unit (IC) to the appropriate terminals on the
terminal block for indoor-outdoor transmission line (TB5) on
LOSSNAY (LC). (Non-polarized two-wire)
ŒIndoor units must be interlocked with the LOSSNAY unit us-
ing the system controller. (Refer to the operation manual for
the system controller for the setting method.) Interlock set-
ting from the remote controller is required if the ON/OFF re-
mote controller alone or the LM adapter alone is connected.
5) Switch setting
Address setting is required as follows.
ŒPort number setting is
required
ŒTo perform a group op-
eration of indoor units
that feature different
functions, designate
the indoor unit in the
group with the greatest
number of functions as
the main unit.
None of these addresses may
overlap any of the indoor unit
addresses.
-
Make the same indoor unit
group settings with the system
controller as the ones that
were made with the MA remote
controller.
ŒTo set the address to 100,
set the rotary switches to 50.
ŒIf the addresses that is as-
signed to the main BC con-
troller overlaps any of the
addresses that are assigned
to the outdoor units or to the
sub BC controller, use a dif-
ferent, unused address with-
in the setting range.
ŒThe use of a sub BC control-
ler requires the connection
of a main BC controller.
) and the S ter-
Fac-
tory
Notes
set-
ting
00
00
Main
00
GB
Table of Contents
loading

Table of Contents