Siemens SATURN IIE EPABX Installation Test Procedures

Epabx

Quick Links

Siemens Practices
Installation Series
Issued by Office Systems Group
5500 Broken Sound Boulevard N.W., Boca Raton, Florida 33431
Siemcns Information Systems, Inc.
Issue 1, May 1986
(305) 994-8100
Telex: 515052
l
-
-
-
-
-
-
Printed in U.S.A.
-
-
-
Table of Contents
loading

Summary of Contents for Siemens SATURN IIE EPABX

  • Page 1 A30808-X5130-8120-1-8928 Siemens Practices Issue 1, May 1986 ’ Installation Series Issued by Office Systems Group (305) 994-8100 Telex: 515052 5500 Broken Sound Boulevard N.W., Boca Raton, Florida 33431 --___________- - ..- - Printed in U.S.A. Siemcns Information Systems, Inc.
  • Page 2: Table Of Contents

    ........6.03 Single -Line Telephone Cross-Connections Siemens SATURN IIE Practices ....SLAi6 6 - 3 Siemens Customer Support Services.
  • Page 3: Purpose

    The practices, issue lnstalbtion test procedures on the SATL’RN I/E EPABX numbers and dates for the SATURN IIE EPABX are lists3 in the must be performed only by Siemer;s cetiified personnel. P r a c t i c e s D o c u m e n t a t i o n I n d e x A.30808~X5130-AlgO-...
  • Page 4: Tmba

    SATURN IIE EPABX Installation Test Procedures Table 1.00 Mnemonics Used in This Practice (Continued) D E F I N I T I O N [\fiNEMDNIC R A U P Remote Access Unit/Ports RGEN Ring Generator Subscriber Line Module Analog - 16 lines...
  • Page 5: Test Equipment Required

    SATURN IIE EPABX A30808-X5130-B120-l-8928 Installation Test Procedures Issue 1, May 1986 2 . 0 1 General. This section describes the test equipment re- d. -Transmission Measuring Set. A transmission measur- quired to perform the installation test procedures, handling ing set (TMS) used to measure the transmission qual-...
  • Page 6 A30808-X5130-8120-l-8928 Issue 1, May 1986 Table 2.00 PC3 and Power Supply Remcval Guidelines I’AODIJLE SERVEC” SPECIAL UNIT S T A T E INSTRUCTKWIS CIOP Notes 1 and 2 CONF Notes 1 and 2 DTMF 0 0 s Note 3 FDDO, FDDl None LTUC Note 4...
  • Page 7: Tmba

    Check that the cabinet ac power cord is not connected to an electrical outlet. Check that the -48Vdc power supply is strapped for SATURN IIE EPABX Installation 11OVac or 22OVac. Procedures Practice (Section 4.00) Check that all circuit breakers on the Power System Unit SATURN IIE EPABX Installation (PSU) are in the OFF position and fuses inserted.
  • Page 8: Issue 1, May

    SATURN IIE EPABX A30808-X5130-B120-l-5928 ,xtallation Test Procedures Issue 1, May 1986 Figure 2.00 Signal Cable Distribution for the SATURN IIE System (Basic Cabinet)
  • Page 9 SATURN IIE EPABX A30808-X5130-B120-l-8928 Installation Test Procedures issue 1, May 1986 EXPANSION CABINET W 2 2 W 2 3 I --- --- i;wi! LiTJ-. - - i-L--i-- _-__ -r----- * BASIC CA&NET A5040-2.313186 Figure 2.01 Signal Cable Distribution for the SATURN IIE System (Expansion Cabinet)
  • Page 10 SATURN IIE EPABX A30808-X5130-8120-1-8928 tnstallation Test Procedures Issue 1, May 1986 LTUSO LINE TRUNK UNIT SHELF r JP BASS a - - - - BASIC SHELF 05039.1..wmG Figure 2.02 Power/Ground Distribution for the SATURN IIE System (Basic Cabinet)
  • Page 11 A30808-X5130-B120-l-8920 Issue 1, May 1986 EXPANSION CABINET REF. L --M--e--\ - -,-, - - - - - - - - - - - BASIC‘CABINET REF. A5U38-1-4:3:86 Figure 2.03 Power/Ground Distribution for the SATURN IIE System (Expansion Cabinet) 2-7 (2-8 blank)
  • Page 12: System Ground Test

    SATURN IIE EPABX A30808-X5130-B120-l-8928 Installation Test Procedures issue 1. May 1986 3 . 0 1 General. The SATURN HE System must be connected extremely ca-ej’Ll when performing t~s%i~g/l’roubiesh~oting t o a n e a r t h g r o u n d ( i . e . , m e t a l l i c c o l d w a t e r p i p e o r m a s t e r g r o u n d procedures with the equipment panel(s) removed.
  • Page 13: System Ground Test Connections

    SATURN IIE EPABX A30808-X5130-B120-l-8928 Installation Test Procedures Issue 1, May 1986 BASIC Cabinet G N D F u s e B o x Facility L U G Power co (ES) llOVAC~$GOi-fZ Neulral G r o u n d hlatn Cabmel...
  • Page 14: Shelf Ground Continuity Test Connections

    SATURN IIE EPABX A30808-X5130-8120-1-8928 Installation Test Procedures Issue 1, May 1986 Busbar Grounded at Busbar/ B a c k p l a n e - Attaching S c r e w s Fuse Box Facility G N D No. E5 ’...
  • Page 15 I -_ A30808-X5130-BlZO-l-8928 SATURN IIE EPABX installation Test Procedures Issue 1, May 1986 SECTION 4.00 POWER-UP TESTS General. The SATURN IIE System makes use of dis- 4 . 0 1 WARNING tributed power in the equipment cabinet. Several power sup- plies are used in the system.
  • Page 16: Basic Backplane

    SATURN IlE EPABX A30808-X5130-8120-1-8928 Installation Test Procedures issue 1, May 1986 Test (Continued) Table 4.00 Power-Up/Output Voltage PROCEDURE VEfiIFICATION IF VERIFICATION IS NOT OBTAINED The red LED designated BATTERY If the red LED remains extinguished, c) On the PSU, place the circuit breaker designated BASIC PS TEST.should be steadily lit.
  • Page 17 A3G808-X5130-B120-1-B928 SATURN IIE EPABX Installation Test Procedures Issue 1, May 1986 lbb!c 4.00 Power-Up/Output Voltage Test (Continued) FROCEDUEE V E R I F I C A T I O N IF VERIFICATION S T E P IS NOT OBTAINED f) Connect positive lead of digital Voltage measured should read + If reading is not 0.05 Vdc, adjust +5V...
  • Page 18 SATURN IIE EPABX A30808-X5130-B120-l-6928 Installation Test Procedures Issue 1, May 1986 Table 4.00 Power-Up/Output Voliagc? Test (Continued) S T E P PROCEDURE VEFllFlCATlON IF VERIFICATION IS NOT OBTAINED 1) Pins 1 and 3. Voltage measured should read be- If reading is not within tolerance, ad- tween +4.5 and +5.5Vdc.
  • Page 19 SATURN IIE EPABX A30808-X5130-8120-1-8928 lnstallatlon Test Proccdurcs Issue I, May 1986 J46/P46 J47/P47 Figure 4.00 Location of Input Voltage Connectors 011 Basic Bockplnnc...
  • Page 20 ---I SATURN IIE EPABX A30808-X5130-8120-1-8928 nstallation Test Procedures Issue 1, May 1986 :42/?42 J43/P43 J44lP44 Figure 4.0.1 Location cf Input Voltage Connectors on LTU Dackp!ane...
  • Page 21: Floppy Disk And Storage Envelope

    Uisks, 5 . 0 1 General. The SATURN IIE EPABX is a Stored-Program- is loaded into the FDD modules for the initial processor in- Controlled (SPC) system. The system is shipped with two iden- tical floppy disks that contain the basic operating and the itialization.
  • Page 22 SATURN IIE EPABX A3080&X5130-B120-l-8928 Installation Test Procedures Issue 1, May 1986 WARNING Hazardous voltages exist within the equipment cabinet. Be e&e&y careful when LJ with the equ&ment panel(s) removed. performing testir;g/~roobleshooting procedur- Table 5.00 Loading Procedures for Operaling Disk ;TEP...
  • Page 23 IF VERIFlCAT!ON IS NOT OBTAINED ’ If the operating disks that were load- ed did not contain a Siemens-. prepared data base, refer to SATURN EPABX Data Base Preparation prac- tice to define the particular system data base, and the SATURN EPABX...
  • Page 24 I’ A30808-X5130-(3120-l-8928 Issue 1, May 1986 T a b l e 5 . 0 2 LED Display Values for Loading Errors S T 3 S T 1 S T 2 CCDE ERRCR DETECTED ACTION _._________-________ Start of self test not halted Main processor error N o t e 1 EPROM checksum error...
  • Page 25 A30808-X5130-6120-1-8928 SATURN IIE EPABX Issue 1, May 1986 Installation Test Procedures WRITE PROTECT NOTCH LATCH LATCH FLOPPY CLoSED \ / DiSi’c Floppy Dish Loading Proceduics Figure 5.02...
  • Page 26: Ciop Printed Circuit Board

    SATURN IIE EPABX A30800-X5130-6120-l-8928 Installation Test Procedures Issue 1, May 1986 (Red) ACTW Connector Service Terminal ‘witch Figure 5.03 CIOP Printed Circuit Coard 5-6 (6 pages)
  • Page 27: Note

    PCBs, respectively. ther details. If a SATURN PCB or apparatus is proven to be defective, Figure 6.04 - Cross-Connections for Siemens Digital craft personnel should proceed according to the Telephone Interfacing with SLMD PCB. instructions contained in the MRA kit.
  • Page 28: Modem Cross-Connections

    SATURN IIE EPABX A30808-X5130-B120-l-B928 lnstallatlon Test Procedures Issue 1, May 1986 ,-Syslein MDF Cable J13 Cross-connect . t o S L M A c i r c u i t d e s i g n a t e d f o r t h e m a i n t e n a n c e t e l e p h o n e .
  • Page 29: Single -Line Telephone Cross-Connections Using Slma Pcb

    A30808-X5130-B120-1-6928 SATURN IIE EPABX Issue 1, May 1986 Installation Test Procedures EQUIPMENT ROOM SlNGLE L I N E ’ H O U S E / ! CABLING TELEPHONE Inlerfacing Connecting Block System T&R Connecting Block Sys:em MDF Cable J32, J34.
  • Page 30: Note

    SATURN IIE EPABX A30808-X5130-B120-l-8928 Installation Test Procedures Issue 1, May 1986 SIEMENS DIGITAL : H O U S E ’ EQUlPMENT FiOOM ICABLING! TELEPHONE Interfacing Connecting Block System T&R Connecting Block DYAD or Jr-DYAD System MDF Cable J32, J34, J36. J38, J40. J42 :...
  • Page 31 SATURN EPABX A30808-X5130-B120-1-6928 Issue 1, May 1986 Installation Test Procedures CENTRAL ; T R U N K ; CUSTOMER PREMISES OFFICE I FAClLlTY : Local Telephone Company Interfacing Connecting Bloc!c System MDF Cable J32. J34, J35, J38, J40. J42 or J44 from the Basic shelf or J26, J28.
  • Page 32 SATURN EPABX A30808-X5130.B120-l-8928 Installation Test Procedures Issue 1, May 1986 -l-RUN!< I D I S T A N T CUSTOMER PREMISES ; FACILITY 1 OFFICE OR S I G N A L I N G Interfacing Connecilng Block EQUIPMENT System T&R Connecting Bloc!c System MDF Cable J32.
  • Page 33 SATURN IIE EPABX A3080i3-X5130-B120-1-69.28 Installation Test Procedures Issue 1, May 1986 PfiErvwzs DISTANT TRUNK ; CUSTOMER O F F I C E FACiLlTY f In:er:ach~g Conneclmg Block OR SIGNALING EQUIPMENT System T&R Connecilng Block 634. J3S. J30. J40. J42 or J44‘...
  • Page 34: Note

    A30808-X5130-B120-l-8928 SATURN IIE EPABX Issue 1, May 198G Installation Test Procedures Connecting Block System T&R Connecting Block System MDF Cable J32, J34, No:es: Dashed lines represent installation-dependent cross-connectrons J36, J38, J4.0, J42 or J44 from the Ei-drrecticnal connection to code calling device for both calling and an- Basic shelf or J25, J28, J30, J32, swerback channels shown.
  • Page 35: Notes

    SATURN IIE EPABX A30808-X5130-B120-l-8928 Installation Test Procedures Issue 1, May 1988 I n t e r f a c i n g System T&R Connecttng 61ocl( Connectmg Block System MDF Cable J32. J34. J36. J40. J42 .Jm. (Op!lonal) A---- from the Basic shelf or J26. J28, J33, J32, J34, J3G.
  • Page 36: Paging With Answerback Cross-Connections

    A30808-X5130-0120-1-8928 issue 1, May 1986 System E&M Connecting Block System MDF Cable J3.2, J34. J36, J36. J40, J42 or J44 from the Basic shelf or J26, J26, J30. J32, J34, J36. J36, or JSO from the LTU shelf _ _ - - - - Trunk Circuit - - - - - - - -----mm...
  • Page 37: Universal Night Answer (Una) Cross-Connections

    A30808-X5130-6120-1-8928 SATURN IIE EPABX Issue 1, May 1986 Installation Test Procedures System T+R Connecting Block Interfacing System MDF Cable J32, J34, J36, J38, Connecting Block J40, J42 or J44 from the Basic shelf or (Optional) J26, J28. J30, J32, J34, J36, J38 or...
  • Page 38: Dtmf Receiver Test

    It is the responsibility of craft pers,on- highways to and from Siemens DYAD and JR-DYAD tel- nel to determine the sequence in which such tests and proce- ephones are operating properly. In addition, the tests...
  • Page 39 A30808-X5130-8120-l-8928 SATURN IIE E?ABX Installation Test Procedures issue 1, May 1986 iab:a 6.00 Tone Generator Test PCDCECURE V E R I F I C A T I O N IF VERIFICATION IS NOT OBTAINED Dial tone returned. P l a c e m a i n t e n a n c e t e s t p h o n e off-hook.
  • Page 40: Station Line Test

    A30808-X5130-B120-l-8928 SATURN IIE EPABX Installation Test Procedures Issue 1, May 1986 Table 6.02 D T M F Receiver Test S T E P PROCECURE VEFHFICATION IF VERIFICATION IS NOT OBTAINED Dial tone is returned. Place maintenance test phone off-hook. Recall dial tone is returned.
  • Page 41: Notes

    A30808-X5130-B120-l-8928 SATURN IIE EPABX Installation Test Procedures Issue 1, May 1986 Tab!c A.03 Station Line Test fCnntinc)edl \-----------I FROCEDUZZ VERIFICATTION IF VER!FiCATION S T E P ’ IS NOT OBTAINED Ringing returned. Place station under test on-hook. If ringing is not heard, switch the sta- tion instrument to determine if it is defective.
  • Page 42 A30808-X5130-B120-l-B928 SATURN IIE EPABX instaliation Test Procedures Issue 1, May 1986 Wbtc 6.04 D T M F Pad Test S T E P PWO@EDWE VERIFICATION IF VERIFICATIGN IS NOT OBTAINED Recall dial tone ceases. After all the If busy tone is returned at any time,...
  • Page 43 A30808-X5130-B120-l-8928 SATURN IIE EPABX Issue 1, May 1986 Installation Test Procedures Table 6.05 Console Test (Continued) :TE? PRCCEDURE VERIFICATIDN lF VERlFlCATlON IS NOT OBTAINED I f p r o p e r v e r i f i c a t i o n i s n o t o b t a i n e d o r All digits dialed are displayed (ac- Depress the console’s keypad buttons...
  • Page 44 SATURN IIE EPABX A30808-X5130-8120-143928 installation Test Procedures Issue 1, May 1986 TRUNK GGOUPSTATUS nnnnnnnn (ALPHANUMERIC DISPLAY L'NI;) SOUlxi OESTIXATION li 18 19 20 21 22 23 24 ALERT CL'1 Figure 6.19 Attendant Console Keypad and Feature Button Depression Sequence...
  • Page 45: Attendant Console Displayable Characters

    SATURN IIE EPABX A30808-X5130-B120-l-6926 Installation Test Procedures Issue 1, May 1986 Table 6.06 Attendant Console Displayable Characters ORDER CHARACTER ORDER CHARACTER A A A A A A A A ;;;;,A!,;;;; 3 4 . BBBBBBBB $$$$5$$$ D D D D D D D D...
  • Page 46: Notes

    Apparatus Diagnostic routines; therefore, perform only steps 5 through 9. 2) If the system option flag TSTDIAG has been disabled in the data base or the Siemens Digital Telephone under test is not classmarked with the TSTAPP feature. the maintenance test phone is required to enable or disable s;...
  • Page 47 Issue 1, May 1986 ’ IS BUTTON DYAD S E E N O T E 26 BUTTON DYAD NOTE: These buttons do not contain LEDs. SEE NOTE y Figure 6.20 Siemens DYAD Telephone Button Depression Sequence 6 - 2 1...
  • Page 48: Notes

    Siemcns Digital Telephone - JR-DYAD Button Test NOTES: 1) If the system option flag TSTDIAG has been enabled in the data base or the Siemens Digital Telephone under test is classmarked with TSTAPP feature, the maintenance test phone is ‘not required to enable or disable the Apparatus Diagnostic routines;...
  • Page 49 A30808-X5130-B120-l-8928 SATURN IIE EPABX Issue 1, May 1986 Installation Test Procedures N O T E S : * These feature buttons are not testable. Buttons 9 through 13 do not contain LEDs. Figure 6.21 Siemeno JR-DYAD Telephone Button Depression Sequence...
  • Page 50: Notes

    Apparatus Diagnostic routines; therefore, perform only steps 5 through 9. 2) If the system option flag TSTDIAG has been disabled in the data base or the Siemens Digital Telephone under test is not classmarked with the TSTAPP feature, the maintenance test phone is required to enable or disable the Apparatus Diagnostic routines;...
  • Page 51 SATURN IIE EPABX A30808-X5130-B120-l-6928 Installation Test Procedures Issue 1, May 1986 Table 6.10 Siemens Digital Telephone Displayable Characters ORDER CHARACTER ORDER CHARACTER ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! 3 3 .
  • Page 52 A30808-X5130-8120-l-8928 SATURN IIE EPABX Issue 1, May 1986 ‘nstallation Test Procedures Table 6.11 Outgoing Trunk Test VERlFiCATlCN IF VERIFICATION STEP PROCEDURE IS NOT OETAINED Iial tone is returned. ?lace m a i n t e n a n c e t e s t p h o n e off-hook.
  • Page 53 A30i308-X5130-B120-1-B928 SATURN IIE EPABX Issue 1, May 1986 Installation Test Procedures Table 6.12 Placing Circuit(s) In-Service PROCEDURE STEP VERIF!CATION IF VERlFlCATIOfl IS NOT OBTAiNED Place maintenance test phone Dial tone returned. off-hook. D i a l t h e D i a g n o s t i c T e s t A c c e s s C o d e .
  • Page 54 ’ A30808-X5130-8120-1-8928 SATURN IIE EPABX Issue 1, May 1986 installation Test Procedures Table 6.13 Takinq Circuit(s) Out-of-Service IContinucdl STEP PROCEDURE VERIFICATION IF VERIFICATION IS NOT OBTAINED Recall dial tone is returned. If additional tests or procedures are to be performed, hook-flash the main-...
  • Page 55: Insta!Lation T E S T P R O C E D U R E S C H E C K L I S T

    I .-- SATURN IIE EPABX A30808-X5130-B120-143928 Installation Test Procedures Issue 1, May 1986 SECTKIN 7.00 INSTALLATION TEST PROCEDURES CHECKLlST 7 . 0 1 General. After performing the installation test proce- have been completed satisfactorily. Use Table 7.00, Installa- dures contained in this practice, each installation test proce- iion Test.

This manual is also suitable for:

Saturn iie

Table of Contents