FusionDC1000A Prefabricated All-in-One Data Center V100R021C00 Commissioning Guide (IT Scenario) Issue Date 2022-12-15 HUAWEI DIGITAL POWER TECHNOLOGIES CO., LTD.
Page 2
Notice The purchased products, services and features are stipulated by the contract made between Huawei Digital Power Technologies Co., Ltd. and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
About This Document About This Document Purpose This document describes how to power on and commission the FusionDC1000A prefabricated all-in-one data center solution (FusionDC1000 for short) in terms of safety precautions, preparations, power-on check, power-on commissioning, joint commissioning, power-off, and core device commissioning. It provides you a quick grasp of how to commission the prefabricated all-in-one data center.
CA UTION Perform system commissioning and power-on strictly according to the system manual and ATS instructions. For any changes in operations and parameters, consult Huawei engineers. Otherwise, system commissioning or power-on may fail, or even the cabinet is damaged. Procedure Step 1 Switch on all SPD circuit breakers in the integrated UPS.
4.7.2.2 Obtaining the NetEco Software License The NetEco software license is not provided together with software to the customer. Therefore, obtain the NetEco software license in advance. Obtain the license from the Huawei's enterprise support website. ● For enterprise users: Log in to Huawei's enterprise support website https:// support.huawei.com/enterprise.
NE types and versions in Mapping Table . ● For carriers: Log in to Huawei's carrier support website https://support.huawei.com. Obtain iManager NetEco 6000 V600R021C00SPCXXX ReleaseDoc_ENG.zip, NetEco6000_V600R021C00SPCXXX_Adapters.zip, and NetEco6000_V600R021C00SPCXXX_DomainAdapters.zip from Support > Product Support > Digital Power > Data Center Facility >...