Huawei OptiX RTN 900 Quick Installation Manual

Huawei OptiX RTN 900 Quick Installation Manual

Radio transmission system

Quick Links

OptiX RTN 900 Radio Transmission System
IDU Quick Installation Guide for Outdoor Cabinets
(APM30H&TMC11H Cabinets Ver.E)
Issue: 01
Date: 2019-03-30
HUAWEI TECHNOLOGIES CO., LTD.
loading

Summary of Contents for Huawei OptiX RTN 900

  • Page 1 OptiX RTN 900 Radio Transmission System IDU Quick Installation Guide for Outdoor Cabinets (APM30H&TMC11H Cabinets Ver.E) Issue: 01 Date: 2019-03-30 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2 Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
  • Page 3 Huawei. The safety precautions in this document are relevant only to Huawei products. Huawei is not liable for any consequence that results from violation of universal regulations for safety operations and safety codes on design, production, and equipment use.
  • Page 4 Instructions and Precautions for Handling Boards CAUTION Do not hold a board without hand protection. Wear an ESD wrist strip or ESD gloves before handling a board. Wearing ESD gloves Wearing an ESD strip Holding a board without hand protection CAUTION Hold the front panel of a board with hands.
  • Page 5 Instructions and Precautions for Handling Power Cable Terminals Press the front of the red latch. Properly move the red latch outwards. CAUTION Do not pick up the tail end of the red latch by using a finger or a screwdriver to avoid damage.
  • Page 6: Tools For Installation

    Tools for Installation Level Phillips screwdriver Flat-head screwdriver Adjustable Wrench Long measuring tape COAX crimping tool Socket wrench Torque wrench Hex key Wire clippers RJ45 crimping tool Wire stripper Diagonal pliers Cold press pliers Needle-nose pliers Multimeter Bayonet wrench Combination pliers File Heat gun Hammer drill...
  • Page 7: Introduction To The Equipment

    Introduction to the Equipment Introduction to the RTN 900 Front View of the RTN 905 1E STM-1 service ports IF port to the ODU / Status indicators of NE cascading port/ Ground screw XPIC input/output FE/GE service electrical the GE/FE service Asynchronous data port ports ports (RJ-45 connectors)
  • Page 8 Front View of the RTN 910A NOTE Ethernet service port (Electric) Input power port ODU power switch The external clock port, IF port Ethernet service port (Optical) external time port, and NM/COM port outdoor cabinet monitoring port share External clock port E1 port USB port one physical port.
  • Page 9 Front View of the RTN 950A STM-1 service port IF port Input power port NE concatenation port External clock port/External E1 port USB port XPIC input/output ports time port 1/Bypass E1 port ESD port ODU power switch NM/COM port Ethernet service port NOTE Based on different board configurations, the positions of the actual IDU ports may be different from the positions shown in the figure.
  • Page 10 Introduction to the APM30H/TMC11H Cabinet Front View of the APM30H Cabinet Technical Specifications Dimensions (mm): 700 (H) x 600 (W) x 480 (D) Ambient temperature: -40°C to +50°C Sunshine radiation: 1120±10% W/m NOTE The exterior of the TMC11H cabinet is the same as the exterior of the APM30H cabinet.
  • Page 11 The Internal Structure of the APM30H and TMC11H Cabinets • Internal Structure of the APM30H Cabinet (AC Power Supply) SLPU EPU frame Fan unit* Heater • Internal Structure of the TMC11H Cabinet (DC Power Supply) Fan unit* DCDU-12B NOTE *: A fan box consists of an embedded fan and monitoring board. The monitoring board varies depending on the cabinet version. Cabinet Version Fan Box Monitoring Board...
  • Page 12 Installation Scenarios of the Cabinets Installation Scenarios of the APM30H or TMC11H Cabinet Requirements for the Installation Dimensions and Space of the Cabinet (Unit: mm) > 60 Cabinet Cabinet Cabinet > 300 > 300 Maximum 120° > 800 NOTE The data shown in the figure is not for the concrete pad. The recommended distance between the cabinets is 40 mm and the maximum distance between the cabinets is 150 mm.
  • Page 13: Installing The Cabinets

    Installing the Cabinets Installing the Base Cast a concrete pad. The height of the concrete pad must meet the heat-dissipation and waterproofing requirements of the cabinet. The concrete pad must be 200 mm higher than the ground, and the horizontal error must be less than 5 mm when the pad is cast.
  • Page 14 Install the expansion bolt assembly. M12x60 bolt Remove the spring washer, Rubber flat washer, and bolt. mallet Spring washer 12 Flat washer 12 Expansion tube Position the base, and then screw the bolt Adjust the base level. with the spring washer and flat washer. Adjust the base level by adding certain pads to the bolts between the base and the concrete pad.
  • Page 15 Remove the baffle plates from both sides Remove the baffle pieces from the back of the base (by removing the plate on the of the base. left side as an example). NOTE All the three cable holes on the base can be used for cable layout, depending on the actual requirements.
  • Page 16 Securing the Cabinet onto the Base M12x30 (x4) Gasket with an oblong hole Waterproof rubber pad Gasket with an oblong hole NOTE The IBBS200D battery cabinet is considered as an example in the installation. When installing the APM30H, TMC11H, or IBBS200T cabinet, use the same method. Stacking the Two Cabinets (Optional) Remove the two cover plates Remove the four rubber...
  • Page 17 Installation Scenarios of the Transmission Equipment Cabinet Sharing Installing the RTN 900 in the APM30H Cabinet (AC Power Supply) NOTE Fan unit (Mandatory) • In this installation scenario, a SLPU maximum of 5 U space is (Optional) available for installing the RTN 900, optional AC heater, maintenance socket, and other EPU frame...
  • Page 18 Dedicated Outdoor Installation Installing the RTN 900 in the APM30H Cabinet (AC Power Supply) Fan unit NOTE (Mandatory) SLPU • In this installation scenario, a (Mandatory) maximum of 7 U space is available for installing the RTN 900, optional AC heater, EPU frame maintenance socket, and other (Mandatory)
  • Page 19: Installing The Assemblies

    Installing the Assemblies Installing the RTN 900 in the APM30H Cabinet Fixing the Floating Nuts Floating nut Installation hole NOTE When installing the RTN 900 in the TMC11H cabinet, use the same method. Installing the RTN 900 NOTE Remove the guide rail, if any, from the installation position.
  • Page 20 If more than 12 E1 signals are transmitted, the UFLP board needs to be replaced with the UELP board. The removed UFLP board needs to be returned to the local representative office of Huawei.
  • Page 21 Installing the SOU in the APM30H and TMC11H Cabinets (Optional) Specifications of the SOU American standard European standard Multi-purpose UK standard NOTE The SOU, which is an optional component, provides the transit function for the AC powered equipment of a customer. Configured with the four outlet types, the cabinets support different SOU types of different countries.
  • Page 22 Installing the Heater in the APM30H and TMC11H Cabinets (Optional) Install the heater. The heater is preferably installed in the bottom If both the SOU and the heater are installed in the 1U space of the cabinet. cabinet, the heater is installed above the SOU. NOTE When the temperature inside the cabinet is lower than 0°C, the heater starts working.
  • Page 23 Installing and Routing the Cables Installing the PGND Cables Installing the PGND Cables for the Cabinet WARNING NOTE • When installing the PGND cables in the TMC11H cabinet, use the same method. • The ground cables and signal cables must be bound separately or must be separated from each other to minimize mutual interference.
  • Page 24 Installing and Routing the Power Cables – AC Power Supply Connecting the Input Power Cable for the APM30H Cabinet AC power box cover AC protecting Use a Phillips screwdriver to remove an M3 screw from the AC input protective cap, and open the protective cap. NOTE The short-circuiting bar does not need to be removed when single-phase 220 V power is input.
  • Page 25 Installing and Routing the Power Cables for the RTN 900 Cable Binding bridge strap NOTE Before installing power cables, ensure that the circuit breaker of the power output terminal is set to the OFF state. RTN 905 RTN 980 RTN 910A/950/950A NOTE The power terminal of the RTN 905/980 differs from that of the RTN 910A/950/950A.
  • Page 26 Installing the Power Cables for the IBBS200D/IBBS200T Battery Cabinet NOTE Either IBBS200D or BBS200T is used. APM30H IBBS200D/T battery cabinet Base Installing the Power Cables for the Fan Assembly in the IBBS200D Battery Cabinet APM30H INPUT IBBS200D battery NOTE cabinet For details on how to make EPC4 connectors, see "Appendixes."...
  • Page 27 Installing the Power Cables for the Heating Films in the IBBS200D Battery Cabinet CAUTION Power box of the heating film The power cables for the heating films in the IBBS200D battery cabinet must be routed downward into the power box of the heating film. CAUTION Power box of the heating film From L1/N1...
  • Page 28 Installing and Routing the Power Cables – DC Power Supply Installing the Input Power Cable for the TMC11H Cabinet Remove the cover of Install the input power cable. the DC power box. NEG (-) DC power box cover RTN (+) Put back the cover of the DC power box.
  • Page 29 Installing Service Cables of the Devices E1 cable (adapter cable) E1 cable (output cable) Ethernet cable (adapter cable) Ethernet cable (output cable) IF cable Optical fiber Monitoring cable NOTE • The service cables in the AMP30H/TMC11H cabinet are routed in the same way. •...
  • Page 30 Installing the Service Cables for the Equipment – AC Power Supply Installing E1 Cables E1 cables for 1xAnea 96/4xDB25 conversion are used. NOTE 1-16 Cable bag For cabinet sharing, the E1 cables need not be connected to the SLPU. Instead, they are directly connected to the equipment at the opposite end. APM30H/TMC11H Ver.C and earlier versions use rubber blocks to lead out cables, and APM30H/TMC11H Ver.D and later versions use cable bags to lead out cables.
  • Page 31 Installing IF Cables Cable bag NOTE APM30H/TMC11H Ver.C and earlier versions use rubber blocks to lead out cables, and APM30H/TMC11H Ver.D and later versions use cable bags to lead out cables. Turning off the ODU-PWR switch on the IF board If the IF board is IF1/IFU2/IFX2/ISV3/ISU2/ISX2, turn off the ODU- PWR switch on the IF board.
  • Page 32 Installing Signal Monitoring Cables CCUB board COM_IN port CF RCV NMS/COM CLK/TOD1 TOD2 System control board MON/TOD2 port NOTE When using the CSHU or CSHUA board, connect the signal monitoring cable to the MON/TOD2 port. The pin assignment is the same as that of the CSH or CST board. Before installing a signal monitoring cable, remove the cable already connected to the COM_IN port on the CCUB board.
  • Page 33 Installing Service Cascading Cables COMBO port COMBO port NOTE If two or more RTN 905 devices are installed in a single cabinet, cascading cables need to be installed if the devices need to be cascaded.
  • Page 34 Sealing the Cable Outlet Module Cable Outlet Module NOTE 1: Left cable outlet; 2: Right cable outlet The cable outlet module of TMC11H is the same as that of APM30H. Sealing Method Tighten the cable outlet bags.
  • Page 35 Sealing the Cable Holes on the Base Baffle plate Fireproof mud Fireproof mud Baffle plate Fireproof mud PVC corrugated pipe Baffle piece Apply baffle plates to the cable outlets on the base. Apply fireproof mud to the surroundings of the cable outlets on the base. Close the front cover of the base.
  • Page 36: Installing The Batteries

    Installing the Batteries Install the batteries. WARNING Before installing the batteries, set the battery circuit breaker labeled BAT to OFF to prevent overcurrent. During the installation of the batteries, apply an insulation sheath to the tool such as the wrench and screwdriver, and do not short-circuit the positive and negative poles of the batteries.
  • Page 37: Checking The Installation

    Checking the Installation Checking Cabinet Installation What to Check For The layout of the cabinet complies with the engineering designs. The base is installed securely. The deviation of the cabinet is less than 3 mm horizontally and not more than 3 mm vertically. All the bolts are tightened, especially those for electrical connections.
  • Page 38 Checking Electrical Connections of the Cabinet What to Check For All the self-made PGND cables are copper-based with proper wire diameters. There is no switch, fuse, or short circuit on the cable. According to the wiring diagram of the power system, the PGND cables are connected securely, the AC lead-in cables and cables inside the cabinet are connected properly, and the screws are tightened.
  • Page 39 Checking the Power-On Status Checking the Power-On Status NOTE This part describes only the process for checking the power-on status of the AC power equipment. When checking the power-on status of the DC power equipment, refer to the process for checking the power-on status of the AC power equipment. In the case of AC power supply Start Normal statuses of the indicators on the PMU:...
  • Page 40 Appendixes Assembling the Power Series 120 Connector 1. Material: power series 120 connector, contact terminal, heat shrink tube, and cable 2. Procedure for assembling the power series 120 connector Strip a part of the jacket off the cable to expose the Route the cable through the heat shrink tube, and conductor with a length of L1.
  • Page 41 EPC4 Connector 1. Material: easy power receptacle (pressfit type) connector, contact terminal, heat shrink tube, and cable 2. Procedure for assembling the easy power receptacle (pressfit type) connector Strip the jacket off the cable based on the scale on Push the sliding block by using a screwdriver until the equipment.
  • Page 42: Replacing The Fuse

    Replacing the Fuse Remove the extraction tool. Remove the fuse from the case. Replace the fuse by using the extraction tool. Align the bulge on the extraction tool Fuse with the hole on the fuse. Fuse Remove the fuse by using the extraction tool.
  • Page 43 Repairing Paint 1. Codes of Color Samples Object Color Name Huawei Color International Color Code Code Cabinets (including the APM30H and TMC11H) RAL7035 YB026 RAL7035 Base 3010 light grey YB030 Pontone 422U 2. Operation Instructions Polishing If a damaged area is stained or the materials are rusty, polish the damaged area or the rusty materials by using a piece of fine sand paper to remove the stain or rust.
  • Page 44 HUAWEI TECHNOLOGIES CO., LTD. Huawei Industrial Base Bantian Longgang Shenzhen 518129 People’s Republic of China www.huawei.com...