Huawei 3900 Series Solution Manual
Hide thumbs Also See for 3900 Series:
Table of Contents

Quick Links

3900 Series Base Station GU Co-Cabinet
V100R001
Solution Guide
Issue
04
Date
2009-07-30
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Table of Contents
loading

Summary of Contents for Huawei 3900 Series

  • Page 1 3900 Series Base Station GU Co-Cabinet V100R001 Solution Guide Issue Date 2009-07-30 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 2 Huawei Technologies Co., Ltd. provides customers with comprehensive technical support and service. For any assistance, please contact our local office or company headquarters. Huawei Technologies Co., Ltd. Address: Huawei Industrial Base Bantian, Longgang Shenzhen 518129 People's Republic of China Website: http://www.huawei.com...
  • Page 3: Table Of Contents

    Solution Guide Contents Contents About This Document........................1 1 Changes in the 3900 Series Base Station GU Co-Cabinet Solution Guide.....1-1 2 Overview of 3900 Series Base Station GU Co-Cabinet Solutions........2-1 2.1 Introduction to Hardware Solutions........................2-2 2.2 Introduction to Software Solutions.........................2-5 3 Hardware Description.......................3-1 3.1 Hardware Components of the GU Co-Cabinet Base Stations.................3-2...
  • Page 4 3900 Series Base Station GU Co-Cabinet Contents Solution Guide 8.6 Software Upgrade............................8-10 Huawei Proprietary and Confidential Issue 04 (2009-07-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 5 Figure 7-3 Selecting MBTS_Relation Report......................7-3 Figure 7-4 Operation Result dialog box.......................7-4 Figure 7-5 MBTS_Relation Report tab page.......................7-4 Figure 8-1 Operation and maintenance of the 3900 series GU co-cabinet base stations........8-1 Figure 8-2 NodeB alarm information........................8-4 Figure 8-3 GBTS alarm information........................8-5 Figure 8-4 Parameters of GU base station......................8-6...
  • Page 7 3900 Series Base Station GU Co-Cabinet Solution Guide Tables Tables Table 3-1 Common components...........................3-2 Table 3-2 Cabinet No., subrack No., and slot No., of the common monitoring components of the GU co-cabinet base station................................3-5 Table 3-3 Cables involved in the configuration (1)....................3-12 Table 3-4 Cables involved in the configuration (2)....................3-15...
  • Page 9: About This Document

    Organization 1 Changes in the 3900 Series Base Station GU Co-Cabinet Solution Guide This describes the changes in the 3900 Series Base Station GU Co-Cabinet Solution Guide. 2 Overview of 3900 Series Base Station GU Co-Cabinet Solutions This describes the hardware and software solutions for the 3900 series GU co-cabinet base stations.
  • Page 10 This describes the separate commissioning of the GBTS and NodeB, which run as two independent NEs. 7 Site Maintenance This describes how to perform site maintenance for the 3900 series GU co-cabinet base stations. 8 Operation and Maintenance The operation and maintenance of the 3900 series GU co-cabinet base stations mainly involve alarm management, inventory management, routine maintenance, emergency maintenance, and software upgrade.
  • Page 11 3900 Series Base Station GU Co-Cabinet Solution Guide About This Document Command Conventions The command conventions that may be found in this document are defined as follows. Convention Description Boldface The keywords of a command line are in boldface. Italic Command arguments are in italics.
  • Page 12 3900 Series Base Station GU Co-Cabinet About This Document Solution Guide The mouse operations that may be found in this document are defined as follows. Action Description Click Select and release the primary mouse button without moving the pointer. Double-click Press the primary mouse button twice continuously and quickly without moving the pointer.
  • Page 13 Solution Guide Changes in the 3900 Series Base Station GU Co-Cabinet Solution Guide This describes the changes in the 3900 Series Base Station GU Co-Cabinet Solution Guide. 04(2009-07-30) This is the forth commercial release. This issue provides the same information as issue 03(2009-07-10).
  • Page 14 1 Changes in the 3900 Series Base Station GU Co-Cabinet 3900 Series Base Station GU Co-Cabinet Solution Guide Solution Guide 01(2009-01-23) This is the initial release. Huawei Proprietary and Confidential Issue 04 (2009-07-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 15: Overview Of 3900 Series Base Station Gu Co-Cabinet Solutions

    Overview of 3900 Series Base Station GU Co- Cabinet Solutions About This Chapter This describes the hardware and software solutions for the 3900 series GU co-cabinet base stations. For details on the GBTS, see the DBS3900 GSM Product Description, BTS3900 GSM Product Description, and BTS3900A GSM Product Description.
  • Page 16: Introduction To Hardware Solutions

    2 Overview of 3900 Series Base Station GU Co-Cabinet 3900 Series Base Station GU Co-Cabinet Solutions Solution Guide 2.1 Introduction to Hardware Solutions The GSM and UMTS boards are installed in the same BBU3900, whereas the RF modules for GSM are independent of those for UMTS.
  • Page 17: Figure 2-2 Typical Scenario Of The Bts3900

    3900 Series Base Station GU Co-Cabinet 2 Overview of 3900 Series Base Station GU Co-Cabinet Solution Guide Solutions Figure 2-2 Typical scenario of the BTS3900 Hardware Solution for the BTS3900A The BTS3900A consists of the APM30 power cabinet, RF cabinet, transmission cabinet, BBU3900, DRFU, WRFU, and electromechanical components.
  • Page 18: Figure 2-3 Typical Scenario Of The Bts3900A

    2 Overview of 3900 Series Base Station GU Co-Cabinet 3900 Series Base Station GU Co-Cabinet Solutions Solution Guide Figure 2-3 Typical scenario of the BTS3900A Huawei Proprietary and Confidential Issue 04 (2009-07-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 19: Introduction To Software Solutions

    NEs. Figure 2-4 illustrates the software solutions for the 3900 series GU co-cabinet base stations. Figure 2-4 Software solutions for the 3900 series GU co-cabinet base stations Issue 04 (2009-07-30) Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
  • Page 21: Hardware Description

    3 Hardware Description Hardware Description About This Chapter This describes the hardware components of the 3900 series GU co-cabinet base stations and related configuration principles. 3.1 Hardware Components of the GU Co-Cabinet Base Stations For details on the hardware components such as the cabinet, boards and modules, and cables of the GU co-cabinet base stations, see the related hardware description documents for the GBTS and the NodeB.
  • Page 22: Hardware Components Of The Gu Co-Cabinet Base Stations

    3900 Series Base Station GU Co-Cabinet 3 Hardware Description Solution Guide 3.1 Hardware Components of the GU Co-Cabinet Base Stations For details on the hardware components such as the cabinet, boards and modules, and cables of the GU co-cabinet base stations, see the related hardware description documents for the GBTS and the NodeB.
  • Page 23 3900 Series Base Station GU Co-Cabinet Solution Guide 3 Hardware Description Comm Name GBTS NodeB Function Comp Comp Comp onent onent onent Fan box Fan box NFAN Provides forced ventilation and dissipation for in the (includi the cabinet. indoor ng the Detects the temperature.
  • Page 24 3900 Series Base Station GU Co-Cabinet 3 Hardware Description Solution Guide Comm Name GBTS NodeB Function Comp Comp Comp onent onent onent APM30 AFMU DTCU NCMU Supplies DC power to the APMI or AFMU and receives DC power through the DC power port.
  • Page 25: Table 3-2 Cabinet No., Subrack No., And Slot No., Of The Common Monitoring Components Of The Gu Co-Cabinet

    3900 Series Base Station GU Co-Cabinet Solution Guide 3 Hardware Description Comm Name GBTS NodeB Function Comp Comp Comp onent onent onent Power UPEA UPEU UPEA Converts -48 V DC power to +12 V DC power. Provides two ports with each transmitting one...
  • Page 26: Hardware Configuration Principles

    3900 Series Base Station GU Co-Cabinet 3 Hardware Description Solution Guide GBTS NodeB UMTS Compo Compo Cabinet Subrac Slot No. Cabinet Subrac Slot No. nent nent k No. k No. 3.2 Hardware Configuration Principles This describes the configuration principles, cabling principles, and typical configurations of the GU co-cabinet DBS3900, BTS3900, and BTS3900A.
  • Page 27: Figure 3-1 Board Configuration Of The Bbu3900

    3900 Series Base Station GU Co-Cabinet Solution Guide 3 Hardware Description The UELP is preferentially configured in slot 0 or 4. The UFLP is preferentially configured in slot 0 or 4. Figure 3-1 shows the board configuration of the BBU3900.
  • Page 28: Figure 3-2 Configuration Of Gsm S4/4/4 + Umts S2/2/2 + Ac Power

    3900 Series Base Station GU Co-Cabinet 3 Hardware Description Solution Guide Figure 3-2 Configuration of GSM S4/4/4 + UMTS S2/2/2 + AC Power Figure 3-3 shows the configuration of GSM S4/4/4 + UMTS S2/2/2 + DC Power. Huawei Proprietary and Confidential Issue 04 (2009-07-30) Copyright ©...
  • Page 29: Hardware Configuration Principles Of The Gu Co-Cabinet Bts3900

    3900 Series Base Station GU Co-Cabinet Solution Guide 3 Hardware Description Figure 3-3 Configuration of GSM S4/4/4 + UMTS S2/2/2 + DC Power 3.2.2 Hardware Configuration Principles of the GU Co-Cabinet BTS3900 This describes the configuration principles, cabling principles, and typical configurations of the GU co-cabinet BTS3900.
  • Page 30: Figure 3-4 Board Configuration Of The Bbu3900

    3900 Series Base Station GU Co-Cabinet 3 Hardware Description Solution Guide Figure 3-4 Board configuration of the BBU3900 Configuration Principles of the RF Modules Configuration principles of the RF modules are as follows: If the total number of RF modules is not more than six, configure all the RF modules in one cabinet.
  • Page 31 3900 Series Base Station GU Co-Cabinet Solution Guide 3 Hardware Description When the cabinets are installed in stack mode, the RF jumpers in the lower cabinet are routed inside the cable troughs on the two sides of the cabinet, and the RF jumpers in the upper cabinet are routed upwards and then led out of the cabinet.
  • Page 32: Figure 3-6 Configuration Of Gsm S2/2/2 + Umts S2/2/2 In A Single Cabinet

    3900 Series Base Station GU Co-Cabinet 3 Hardware Description Solution Guide Figure 3-6 Configuration of GSM S2/2/2 + UMTS S2/2/2 in a single cabinet Table 3-3 lists the cables involved in the configuration. Table 3-3 Cables involved in the configuration (1)
  • Page 33 3900 Series Base Station GU Co-Cabinet Solution Guide 3 Hardware Description Cable Name External alarm cable Monitoring signal cable for the DCDU-01 Monitoring signal cable for the FAN unit E1 cable for GSM E1 cable for UMTS R1 to R6...
  • Page 34: Figure 3-7 Configuration Of Gsm S4/4/4 + Umts S2/2/2 In Stacked Cabinets

    3900 Series Base Station GU Co-Cabinet 3 Hardware Description Solution Guide Figure 3-7 Configuration of GSM S4/4/4 + UMTS S2/2/2 in stacked cabinets 3-14 Huawei Proprietary and Confidential Issue 04 (2009-07-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 35: Figure 3-8 Configuration Of Gsm S4/4/4 + Umts S2/2/2 In Side-By-Side Cabinets

    3900 Series Base Station GU Co-Cabinet Solution Guide 3 Hardware Description Figure 3-8 shows the configuration of GSM S4/4/4 + UMTS S2/2/2 in side-by-side cabinets. Figure 3-8 Configuration of GSM S4/4/4 + UMTS S2/2/2 in side-by-side cabinets Table 3-4 lists the cables involved in the configuration.
  • Page 36: Hardware Configuration Principles Of The Gu Co-Cabinet Bts3900A

    3900 Series Base Station GU Co-Cabinet 3 Hardware Description Solution Guide Cable Name S13 to S15 CPRI electrical cable for UMTS S1 to S6 CPRI electrical cable for GSM E1 cable for GSM E1 cable for UMTS External alarm cable...
  • Page 37: Figure 3-9 Board Configuration Of The Bbu3900

    3900 Series Base Station GU Co-Cabinet Solution Guide 3 Hardware Description Figure 3-9 Board configuration of the BBU3900 Configuration Principles of the RF Modules Configuration principles of the RF modules are as follows: If the total number of RF modules is not more than six, configure all the RF modules in one RF cabinet.
  • Page 38 3900 Series Base Station GU Co-Cabinet 3 Hardware Description Solution Guide When two RF cabinets are installed, the routing of the power cables to the extension RF cabinet is as follows: The power cables are routed along the right of the APM30, through the rectangular cable hole on the right of the APM30, and then along the support at the bottom.
  • Page 39: Figure 3-10 Configuration Of Gsm S2/2/2 + Umts S2/2/2

    3900 Series Base Station GU Co-Cabinet Solution Guide 3 Hardware Description Figure 3-10 Configuration of GSM S2/2/2 + UMTS S2/2/2 Issue 04 (2009-07-30) Huawei Proprietary and Confidential 3-19 Copyright © Huawei Technologies Co., Ltd.
  • Page 40: Table 3-5 Cables Involved In The Configuration (1)

    3900 Series Base Station GU Co-Cabinet 3 Hardware Description Solution Guide Table 3-5 lists the cables involved in the configuration. Table 3-5 Cables involved in the configuration (1) Cable Name L1, L2, L3, and N Input power cable for the power cabinet...
  • Page 41: Figure 3-11 Configuration Of Gsm S4/4/4 + Umts S2/2/2

    3900 Series Base Station GU Co-Cabinet Solution Guide 3 Hardware Description Figure 3-11 Configuration of GSM S4/4/4 + UMTS S2/2/2 Table 3-6 lists the cables involved in the configuration. Table 3-6 Cables involved in the configuration (2) Cable Name L1, L2, L3, and N...
  • Page 42 3900 Series Base Station GU Co-Cabinet 3 Hardware Description Solution Guide Cable Name Input power cable for the batteries in the power cabinet P2.1 to P2.6 Power cable between the DCDU and the DRFU P3.1 to P3.3 Power cable between the DCDU and the WRFU P6.1 and P6.2...
  • Page 43: Hardware Installation

    4 Hardware Installation Hardware Installation About This Chapter This describes the hardware installation of the 3900 series GU co-cabinet base stations. 4.1 GU Co-Cabinet DBS3900 Installation Guide For details, see the BBU3900 Installation Guide, RRU3004 Installation Guide, and RRU3804 Installation Guide.
  • Page 44: Gu Co-Cabinet Dbs3900 Installation Guide

    3900 Series Base Station GU Co-Cabinet 4 Hardware Installation Solution Guide 4.1 GU Co-Cabinet DBS3900 Installation Guide For details, see the BBU3900 Installation Guide, RRU3004 Installation Guide, and RRU3804 Installation Guide. Huawei Proprietary and Confidential Issue 04 (2009-07-30) Copyright © Huawei Technologies Co., Ltd.
  • Page 45: Initial Configuration

    5 Initial Configuration Initial Configuration About This Chapter This describes how to perform initial configuration for the 3900 series GU co-cabinet base stations. 5.1 Preparing for the Initial Configuration of the GU Co-Cabinet Base Stations Before performing initial configuration for the 3900 series base stations, you should obtain the initial data configuration file of the GBTS and the initial data configuration file of the NodeB.
  • Page 46: Preparing For The Initial Configuration Of The Gu Co-Cabinet Base Stations

    5.1 Preparing for the Initial Configuration of the GU Co- Cabinet Base Stations Before performing initial configuration for the 3900 series base stations, you should obtain the initial data configuration file of the GBTS and the initial data configuration file of the NodeB.
  • Page 47: Initial Configuration Procedure

    RF module should be separately configured for and monitored by the GBTS and the NodeB. 5.3 Initial Configuration Procedure This describes the initial configuration for the 3900 series GU co-cabinet base stations. The initial configuration procedure for the GBTS part of the GU co-cabinet base station is the same as that for the GSM-only base station.
  • Page 49: Commissioning

    3900 Series Base Station GU Co-Cabinet Solution Guide 6 Commissioning Commissioning This describes the separate commissioning of the GBTS and NodeB, which run as two independent NEs. The procedure for commissioning the GBTS part of the GU co-cabinet base station is the same as that for commissioning the GSM-only base station.
  • Page 51: Site Maintenance

    GBTS and the NodeB on their counterpart. 7.3 Site Maintenance Items Site maintenance for the GBTS part of the 3900 series GU co-cabinet base stations is the same as that for the GSM-only base station. For details, see the GSM documents related to the site maintenance.
  • Page 52: Identification Of The Gu Co-Cabinet Base Stations

    3900 Series Base Station GU Co-Cabinet 7 Site Maintenance Solution Guide 7.1 Identification of the GU Co-Cabinet Base Stations This describes how to identify the GU co-cabinet base stations to perform differentiated site maintenance. Procedure Identify the GU co-cabinet base stations through the RAN report.
  • Page 53: Figure 7-2 Selecting Physical Root

    3900 Series Base Station GU Co-Cabinet Solution Guide 7 Site Maintenance Figure 7-2 Selecting Physical Root Click Next, and the RAN report wizard-Step 3 of 3 dialog box is displayed. Select MBTS_Relation Report, as shown in Figure 7-3. Figure 7-3 Selecting MBTS_Relation Report...
  • Page 54: Figure 7-4 Operation Result Dialog Box

    3900 Series Base Station GU Co-Cabinet 7 Site Maintenance Solution Guide Click Finish, and the Operation Result dialog box is displayed, as shown in Figure 7-4. Figure 7-4 Operation Result dialog box Click OK, and the MBTS_Relation Report tab page is displayed, as shown in Figure 7-5.
  • Page 55: Precautions For The Site Maintenance Of The Gu Co-Cabinet Base Stations

    7.2 Precautions for the Site Maintenance of the GU Co- Cabinet Base Stations When performing site maintenance for the 3900 series GU co-cabinet base stations, pay attention to the mutual impacts of the GBTS and the NodeB on their counterpart.
  • Page 56: Site Maintenance Items

    7.3 Site Maintenance Items Site maintenance for the GBTS part of the 3900 series GU co-cabinet base stations is the same as that for the GSM-only base station. For details, see the GSM documents related to the site maintenance.
  • Page 57: Operation And Maintenance

    Solution Guide 8 Operation and Maintenance Operation and Maintenance About This Chapter The operation and maintenance of the 3900 series GU co-cabinet base stations mainly involve alarm management, inventory management, routine maintenance, emergency maintenance, and software upgrade. Figure 8-1 illustrates the operation and maintenance of the 3900 series GU co-cabinet base stations.
  • Page 58 8.4 Routine Maintenance The routine maintenance of the 3900 series GU co-cabinet base stations are performed separately on the GBTS part and NodeB part. The routine maintenance procedure is the same as that for the corresponding single-standard base station. For details on the routine maintenance of the GBTS part, see the BSS Routine Maintenance Guide.
  • Page 59: Alarm Management

    3900 Series Base Station GU Co-Cabinet Solution Guide 8 Operation and Maintenance 8.1 Alarm Management The GBTS and NodeB separately report alarms to the M2000. The alarms related to the common components reported from both sides are display on the M2000.
  • Page 60: Figure 8-2 Nodeb Alarm Information

    3900 Series Base Station GU Co-Cabinet 8 Operation and Maintenance Solution Guide When the parameters of the EMU configured on the GBTS side and the NodeB side are inconsistent, the GBTS reports a 6166 Parameter set collision alarm. When the parameters of the power system configured on the GBTS side and the NodeB side are inconsistent, the GBTS reports a 6062 Parameter set collision alarm.
  • Page 61: Figure 8-3 Gbts Alarm Information

    3900 Series Base Station GU Co-Cabinet Solution Guide 8 Operation and Maintenance Figure 8-3 GBTS alarm information NOTE Command Word is contained in the NodeB alarm information and SubLink No. is contained in the GBTS alarm information. Check the Parameters of GU base station table.
  • Page 62: Figure 8-4 Parameters Of Gu Base Station

    3900 Series Base Station GU Co-Cabinet 8 Operation and Maintenance Solution Guide Figure 8-4 Parameters of GU base station Check the Parameters of GU base station table and record the GSM Parameter Name and UMTS Parameter Name that correspond to Board Type, Common Word and SubLink No.
  • Page 63: Clearing The Alarms Related To The Inconsistent Parameter Configuration

    If the NodeB parameters cannot be set, set the corresponding GBTS parameter to the default value. Check whether the alarm is cleared. If the alarm persists, contact Huawei Customer Service Center. 8.2.2 Clearing the Alarms Related to the Inconsistent Parameter Configuration This describes how to clear the alarms related to the inconsistent parameter configuration.
  • Page 64 3900 Series Base Station GU Co-Cabinet 8 Operation and Maintenance Solution Guide Board NodeB GBTS NodeB GBTS NodeB Remark Type Board Board Alarm Alarm Alarm Alarm Alarm Alarm Customi Customi reported reported from from port 1 port 6 Alarm Alarm...
  • Page 65: Inventory Management

    3900 Series Base Station GU Co-Cabinet Solution Guide 8 Operation and Maintenance Board NodeB GBTS NodeB GBTS NodeB Remark Type Board Board Alarm Alarm Alarm Alarm Arrester NFAN 9758 4558 contact alarm lightning alarm arrester paramete fault rs for the...
  • Page 66: Routine Maintenance

    This describes the procedure for separately upgrading the GSM software and UMTS software of the 3900 series GU co-cabinet base station, which is consistent with that for upgrading the software of the single-standard base station. For details, see the documents related to the GSM or UMTS upgrade guide.

Table of Contents