Quick Links

m a n u a l
EOS Quadrant
loading

Summary of Contents for FrontLine FLBEDYD9392B8F

  • Page 1 m a n u a l EOS Quadrant...
  • Page 2 Installation instructions: Quadrant Adjustment range: (-25mm / -5mm) x (-30mm / -5mm) x 1900mm Mounting Preparation After opening the packaging, read the instructions carefully. Check whether all parts are present and there is no sign of shipping damage. If you find any problem, please contract your retailer directly. Necessary tools: spirit level electric drill...
  • Page 3 8EQ3 8EQ3 1. If the quadrant is placed onto a tray, first take a spirit 2.Put the wall profiles 8EQ3 against the wall, ensuring the distance level to check whether the tray is placed horizontal. In case between the profile and the wall is correct. Please make sure profile to the quadrant is installed directly onto the floor, please be 5mm away from outside edge.
  • Page 4 8EQ21 8EQ5 8EQ5 8EQ19(2x) 8EQ6(2x) 8EQ20(2x) 5.Insert the fixing glass 8EQ5 into the wall profiles. 6. Adjust the position of vertical profile and wall profile to suitable position and then mount rail profile 8EQ21 by assembling fixing part 8EQ19 and 8EQ20 on fixing panels. Cover 8EQ6 on the back of 8EQ20.
  • Page 5 8EQ12(2x) 8EQ9 8EQ9 10.Attach magnetic strip 8EQ12 to sliding panel 8EQ14. 9.Put the sliding panel on the rail profile. Attached vertical sealer 8EQ9 to the other side of sliding Adjust the top roller to make sure sliding panel is vertical to the rail panel.
  • Page 6 12.1 12.2 12.3 12.4 12.5 8EQ17(2x) 8EQ18(2x) 8EQ16 12. Put silicon glue on the back of bottom aluminum strip 8EQ16. Put it on the tray edge between brackets 8EQ7. Put the profile cover 8EQ18 on the vertical profile and put profile cover 8EQ17 on the wall profile. 13.1 8EQ4(6x) 13.2...

This manual is also suitable for:

Flbed9562b1080fFlbed9392bFlbedyd9392b10f