Routine Setup Check; Other Maintenance Operations - Siemens ST950 Handbook

Hide thumbs Also See for ST950:
Table of Contents
With the handset, check that all inputs used are operating correctly.
Test the maintenance socket RCD by pressing the test button. The breaker
should operate immediately.
The following checks should be carried out before leaving the site.
Check the cabinet door seals are intact and in the correct positions. Replace
as necessary ensuring the surface is clean before fitting.
Inspect the cabinet base seal. If damaged, the affected area should be filled
with sand and re-sealed as per section 7.3.12
9.3

Routine Setup Check

Check that the real time clock is set correctly.
A true measurement of the accuracy of the real time clock can only be gained if the
clock with which it is compared has been accurately set up.
It is essential that the time be compared with an adjacent controller using a clock
that has been synchronised to that controller within the last 30 minutes.
9.4

Other Maintenance Operations

The following maintenance procedures may also be required and are described
elsewhere in this document.
RTC battery replacement - see section 7.5.2
Addition & removal of licences - see section 7.5.4
Loading new IC4 configuration - see section 7.5.3
Update of firmware - see section 7.5.16
Export of site information - see section 7.5.15
Security classification
Version
Last Editor
Document Name
Copyright © Siemens Mobility Limited 2018. All Rights Reserved.
Unrestricted
5
Neil Atkinson
ST950 ICM Handbook
Intelligent Traffic Systems
Sopers Lane, Poole, Dorset, BH17 7ER
Page
86 of 125
Status
Issued
Date
18-Dec-2018
Document No.
667/HE/46950/000
Table of Contents
loading

Table of Contents