Mitsubishi Electric CITY MULTI PURY-HP72TNU-A Data Book page 122

Air conditioning systems
Table of Contents
13. OUTDOOR INSTALLATION
13-3-4. Installation
When the pipes and/or cables are routed at the bottom of the unit, make sure that the through hole at the base of
the unit does not get blocked with the installation base.
When the pipes are routed at the bottom of the unit, the base should be at least 100 mm [3-15/16 in.] in height.
HP72, 96, 120
[3-9/16] 90
Installation base parallel to the unit's front panel
13-3-5. Refrigerant pipe routing
Example of closure materials
(field supply)
MEES19K180
[6-13/16]
[5-1/16]
[5-15/16]
128
150
A
D
1060 [41-3/4]
(Mounting pitch)
Bottom view
Fill the gap at the site
2×2-14[9/16]×31[1-1/4] Oval hole
2×2-14[9/16]×20[13/16] Oval hole
[8-9/16]
(without detachable leg)
216
172
152[6]
B
C
90[3-9/16]
NO.
Usage
A
For pipes
B
For wires
C
D
For transmission cables
Installation base perpendicular to the unit's front panel
The gaps around the edges of through holes for pipes and
wires on the unit allow water or mice to enter the unit and
damage its parts. Close these gaps with filler plates.
This unit allows two types of pipe routing:
• Bottom piping
• Front piping
CAUTION
To prevent small animals, water and snow from
entering the unit and damage its parts, close the
gap around the edges of through holes for pipes
and wires with filler plates.
Hyper Heating Inverter R2-Series
(Unit: mm[in.])
Specifications
150 × 94 Knockout hole
Bottom through hole
[5-15/16] [3-3/4]
ø65 Knockout hole
Bottom through hole
[2-9/16]
ø52 Knockout hole
Bottom through hole
[2-1/16]
ø34 Knockout hole
Bottom through hole
[1-3/8]
120
Table of Contents
loading

Table of Contents