Before installation, read the user manual carefully to get familiar with product information and
safety precautions, The 2.4 MW PowerPOD is used as an example to describe the installation and
commissioning.
2.4 MW indoor PowerPOD
(1)
Transformer
(2)
Input/Bustie cabinet
(4)
Maintenance bypass
(5)
Input/Bypass cabinets
cabinet
(7)
Output cabinet
(8)
PAD
(10) Platform base
02
Installation Preparations
1. Remove the fasteners that secure the base to the transportation vehicle based on the site
requirements.
2. Determine the position for installing the PowerPOD on the floor based on the mounting holes
on the platform base. Drill holes and install expansion sleeves.
2.4 MW PowerPOD base dimensions
FusionPower6000 V100R021C10 Quick Guide
03
Hoisting on the First Floor
1. Adjust the PowerPOD in the installation direction, connect the steel hoisting ropes, and
hoist the PowerPOD at the entrance of the unloading area.
2. When unloading the PowerPOD, use a crane to
hoist one end of the PowerPOD into the room to
place it on the moving dolly at the entrance of
the unloading area, and place the other end on
the wood sleeper. Use a crane to lift the
PowerPOD end placed on the wood sleeper, and
use an electric winch to slowly push the
PowerPOD into the room.
3. After the winch pulls the PowerPOD into the
room, place the moving dolly at the rear of the
(3)
Reactive power
PowerPOD.
compensation cabinet (SVG)
4. After moving to the installation position, place
(6)
UPS5000-H-1200kVA
the jacks at the I-shaped steel positions on the
base of the PowerPOD. Lift up the PowerPOD
(9)
Feeder cabinets
and remove the tank wheel, and then put down
the jacks.
04
Hoisting on a Higher Floor
1. Place the PowerPOD on the hoisting platform and bind it.
2. Adjust the prefabricated PowerPOD in
the installation direction, connect the
steel hoisting ropes, and hoist the
Installation dimensions (unit: mm)
PowerPOD at the entrance of the
unloading area.
3. Connect the steel hoisting ropes to the
rectangular hoisting tool.
4.
Conduct trail hosting. Lift the hook by about 200 mm under the command of the crane
operator and keep it for 5 minutes. Check the status of the crane, legs, and steel ropes.
If any exception is found, put down the PowerPOD immediately and rectify the fault
until the potential risk is eliminated.
5.
Lift the PowerPOD to the hoisting hatch, place the front part of the hoisting platform
indoors, and secure the hoisting platform using two manual hoists.
6. Untie the steel ropes, use jacks to support the PowerPOD, and place eight moving dollies
underneath.
7. Use a pallet truck to pull the PowerPOD out of the hoisting platform and move the
PowerPOD to the installation position.
Winch Pulling
Moving
Wood
rope
dolly
sleeper
Binding strap
Hoisting
platform
05
Steel rope
Rectangular
hoisting tool
Steel rope
PowerPOD
01
Hoisting platform
PowerPOD
Manual hoist
Pallet truck
Moving dolly
Securing a PowerPOD
Copyright © Huawei Technologies Co., Ltd. 2021. All rights reserved
.
loading

Summary of Contents for Huawei FusionPower6000

  • Page 1 Installation dimensions (unit: mm) PowerPOD at the entrance of the Rectangular unloading area. hoisting tool 3. Connect the steel hoisting ropes to the rectangular hoisting tool. Steel rope PowerPOD Copyright © Huawei Technologies Co., Ltd. 2021. All rights reserved...
  • Page 2 Secure the power modules. (1)Connect the ground cable of the battery string or its BBB box to the battery PE of the UPS or the ground bar in the equipment room as required. Copyright © Huawei Technologies Co., Ltd. 2021. All rights reserved...
  • Page 3: Power-On Commissioning

    2. Add an SVG. Preparations and App Login Path Item Description 1. Log in to Huawei AppGallery (http://a.vmall.com/), search for FusionModule, and tap Device attribute Select PDU from the drop-down list box. Download to obtain the installation package. 2. Install the app.
  • Page 4 4. (Optional) Replacing the App Certificate on a Mobile Device. 5. Logging In to the EDCM App. 6. Setting EDCM Communication Parameters on the ECC800-Pro. 7. Connecting to the Network. FusionPower6000 V100R021C10 User Manual For details, see the Copyright © Huawei Technologies Co., Ltd. 2021. All rights reserved...
  • Page 5 ABB ATS022 Initial Configuration Parameters Category Parameter Default Value Value Range Setting Password 0001 0001 100/57V-115/66V-120/70V-208/120V-220/127V-230/132V-240/138V- Rated voltage 400/230 V 400/230 V 277/160V-347/200V-380/220V-400/230V-415/240V-440/254V-480/277V Rates frequency 50 Hz 50Hz, 60Hz 50 Hz Number of phase LN1 3 phases with N 3 phases with N/ 3 phases without N/ 1 phase 3 phases with N Number of phase LN2 3 phases with N...
  • Page 6 ACB Parameter Settings Current Parameter Cabinet No. Circuit Breaker Category Trip Threshold Trip Time Setting Level l1=0.4–1.0*ln t1=3–144S lr1=1.0*ln=3200A Overload Protection: L (Touch screen setting) Threshold step: 0.01*ln Time Step: 3S (3*l1) t1=96s (3*lr1) l2=0.6–10*ln t2=0.05–0.8S Ir2=10xln=32000A Time-delayed overcurrent protection: S (Touch screen setting) Transformer Threshold step: 0.1*ln Time Step: 0.01S...
  • Page 7: Default Value

    UPS5000-H(1200KVA) Initial Configuration Parameters Category Parameter Default Value Value Range Setting IP address 192.168.0.10 1.0.0.0–223.255.255.255 Default Value Subnet mask 255.255.255.0 0.0.0.0–255.255.255.255 Default Value IP Settings Gateway 192.168.0.1 1.0.0.0–223.255.255.255 Default Value MAC address Default Value Address 1–254 Default Value Baud rate 9600 9600, 19200, 115200 Default Value...
  • Page 8 Category Parameter Default Value Value Range Setting Disable, Critical alarm, Minor alarm, Bypass mode, Battery mode, Low batt. volt., Low battery SOC, Abnormal mains, Sys maint MUS05A D0_1 Disable breaker enable, Sys outp breaker enable, Maint. breaker closed, No Sys outp breaker enable power supplied, Mains supplies power, ECO mode, Battery test, Batt.
  • Page 9 UPS5000-H-1600KVA Initial Configuration Parameters Category Parameter Default Value Value Range Setting IP address 192.168.0.10 1.0.0.0–223.255.255.255 Default Value Subnet mask 255.255.255.0 0.0.0.0–255.255.255.255 Default Value IP Settings Gateway 192.168.0.1 1.0.0.0–223.255.255.255 Default Value MAC address Default Value Address 1–254 Default Value Baud rate 9600 9600, 19200, 115200 Default Value...
  • Page 10 Category Parameter Default Value Value Range Setting Disable, Critical alarm, Minor alarm, Bypass mode, Battery mode, Low batt. volt., Low battery SOC, Abnormal mains, Sys maint MUS05A D0_1 Disable breaker enable, Sys outp breaker enable, Maint. breaker closed, No Sys outp breaker enable power supplied, Mains supplies power, ECO mode, Battery test, Batt.
  • Page 11 Component name: feeder cabinet circuit breaker Cabinet No. Circuit Breaker Category Current Level Parameter Default Value Value Range Setting [0.4,1] Overload: I1 Trip Time: t1 [12,36] LA15 Feeder circuit breaker MCCB 630A OFF-1-1.5-2-2.5-3-3.5-4.5-5.5-6.5-7-7.5-8-8.5-9-10 Selective short-circuit: I2 Trip Time: t2 0.1-0.2 OFF-1-1.5-2-2.5-3-3.5-4.5-5.5-6.5-7-7.5-8-8.5-9-10 Short-circuit: I3 Overload: I1...
  • Page 12 Management System Initial Configuration Parameters (IT N+X) Monitoring Data Device Device IP Device Alarm WebUI User Name LCD User Name Port to Upper- DDF Transfer Upper-Level Upper-Level Device Name Device Model Remarks Device Type Code Address Address Threshold and Password and Password Level Device Port...

This manual is also suitable for:

V100r021c10