Commissioning, Operation, Diagnostics And Maintenance; Notes On Commissioning; General Information; Preparation - Bosch rexroth IndraDrive Mi KCU02 Project Planning Manual

Drive systems
Hide thumbs Also See for rexroth IndraDrive Mi KCU02:
Table of Contents
IndraDrive Mi Drive Systems with KCU02, KSM02,
KMS02/03, KMV03, KNK03, KLC03
11
Commissioning, operation, diagnostics and mainte‐
nance
11.1

Notes on commissioning

11.1.1

General information

11.1.2

Preparation

11.1.3

Procedure

11.2

Notes on operation

Commissioning, operation, diagnostics and maintenance

WARNING
Read and observe the detailed safety instructions contained in this
documentation in chapter "Safety instructions for electric drives and controls".
1. Keep the documentation of all used products ready.
2. Check the products for damage.
3. Check all mechanical and electrical connections.
4. Activate the safety devices and monitoring systems of the installation.
Commission the drive system according to the instructions contained in the
corresponding product documentation. See the Functional Description of the
firmware for the corresponding information.
The commissioning of drive controllers and control unit may require additional
steps. The functionality and performance check of the installations is not part
of motor commissioning. Instead, it is carried out within the scope of the
commissioning of the machine as a whole. Observe the machine
manufacturer's specifications and instructions.
Tab. 11-1:
High electrical voltage! Danger to life, risk of
injury by electric shock or serious injury!
WARNING! Lethal electric shock from live parts with
more than 50 V!
Never operate the KCU02 drive connection box
without the touch guard mounted.
See also
chapter 9.4.2 "Touch guard" on page
R911335703_Edition 04 Bosch Rexroth AG
339/407
283.
Table of Contents
loading

Table of Contents