Huawei ECC800 User Manual

Huawei ECC800 User Manual

Data center controller
Hide thumbs Also See for ECC800:
Table of Contents
ECC800 Data Center Controller
V100R003C00
User Manual (for ECC800-Pro)
Issue
06
Date
2020-04-22
HUAWEI TECHNOLOGIES CO., LTD.
Table of Contents
loading

Summary of Contents for Huawei ECC800

  • Page 1 ECC800 Data Center Controller V100R003C00 User Manual (for ECC800-Pro) Issue Date 2020-04-22 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2 Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
  • Page 3: About This Document

    About This Document About This Document Purpose This document describes the ECC800-Pro data center controller in terms of features, devices, user interfaces (UIs), and power-on commissioning, as well as frequently asked questions (FAQ) and troubleshooting measures. This document describes all the functions of the ECC800-Pro. Certain functions are implemented by hardware such as the UPS and PDU, and may be unavailable if the hardware is not connected to the ECC800-Pro.
  • Page 4 Added the requirements for wireless mode and frequency bands in 4G technical specifications.  Added the method of handling the problem that the ECC800 IP address is forgotten. Issue 04 (2020-01-20) Updated the UI texts of the UIM20A expansion module.
  • Page 5: Table Of Contents

    3.2.4.1.5 Magnetic Lock ..............................39 3.2.4.2 Cabinet Access Control System ..........................40 3.2.4.3 Cabinet Electronic Clasp Lock ..........................41 3.2.5 AC Actuator ................................43 3.2.6 Skylight Actuator ..............................45 3.2.7 Multi-Functional Sensor ............................48 Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 6 5.9 Commissioning Cabinet Electronic Clasp Lock (for FusionModule800) ..............112 6 Feature Description........................115 6.1 Setting Device Performance Parameters ........................115 6.2 Setting ECC800-Pro Cascading ..........................116 6.3 Commissioning a UIM20A Expansion Module ......................117 Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 7 6.4.1.3 Commissioning a Door Status Sensor (Connected to the AI/DI Port on the UIM20A Expansion Module) ..123 6.4.1.4 Commissioning the Door Status Sensor (Connected to the ECC800-Pro) ............124 6.4.2 Commissioning an Access Control Device and a Cabinet Electronic Lock ............125 6.4.3 Commissioning the Exit Button, Skylight Button, Atmosphere Light, Emergency Button, and Magnetic Lock ..
  • Page 8 6.14.1.2 Setting NetEco Parameters ..........................202 6.14.1.3 Creating an ECC800-Pro on the NetEco ......................203 6.14.1.4 Creating an ECC800-Pro on the CloudOpera NetEco ..................204 6.14.1.5 Setting the Transparent Transmission Function ....................204 6.14.2 Third-party NMS Management (over SNMP) ..................... 207 6.14.2.1 Connecting a Communications Cable .......................
  • Page 9 8.1.6.20 How to Set and Add the Multi-functional Sensor? ................... 250 8.1.6.21 How to Set and Add the Smoke Sensor (Connected to the AI/DI Port on the ECC800-Pro)? ......252 8.1.6.22 How Should I Set and Add the Smoke Sensor (Connected to the AI/DI Port on the Skylight Actuator)? ..254 8.1.6.23 How to Set and Add the Smoke Sensor (Connected to the AI/DI Port on the Rack Environment Unit)? ..
  • Page 10 8.1.19 How Can I Synchronize Device Parameters? ...................... 276 8.1.20 What Do I Do If the ECC800-Pro WebUI Display Language Changes from Chinese to English During Use? .. 277 8.1.21 What Do I Do If the ECC800-Pro Fails to Communicate with the UPS5000-E? ..........277 8.1.22 What Should I Do if I Forget the ECC800 IP Address? ..................
  • Page 11 8.2.7 How Can I Handle App Login Failure? ......................... 302 9 PLC Function ..........................304 9.1 Linkage Control Introduction ........................... 304 9.2 Linkage Control Configuration Examples ........................ 305 10 Acronyms and Abbreviations ....................308 Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 12: Safety Information

    The"NOTICE", "CAUTION", "WARNING", and "DANGER" statements in this document do not cover all the safety instructions. They are only supplements to the safety instructions. Huawei will not be liable for any consequence caused by the violation of general safety requirements or design, production, and usage safety standards.
  • Page 13  Keep irrelevant people away from the equipment. Only operators are allowed to access the equipment.  Use insulated tools or tools with insulated handles, as shown in the following figure. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 14  To avoid electric shock, do not connect safety extra-low voltage (SELV) circuits to telecommunication network voltage (TNV) circuits. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 15: Personnel Requirements

    Do not power on the equipment before it is installed or confirmed by professionals. 1.2 Personnel Requirements  Personnel who plan to install or maintain Huawei equipment must receive thorough training, understand all necessary safety precautions, and be able to correctly perform all operations.
  • Page 16 When selecting, connecting, and routing cables, follow local safety regulations and rules. The static electricity generated by human bodies may damage the electrostatic-sensitive components on boards, for example, the large-scale integrated (LSI) circuits. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 17: Installation Environment Requirements

     Ensure that the equipment room provides good heat insulation, and the walls and floor are dampproof.  Install a rat guard at the door of the equipment room. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 18: Mechanical Safety

    Before hoisting objects, ensure that hoisting tools are firmly secured onto a load-bearing object or wall.  Ensure that the angle formed by two hoisting cables is no more than 90 degrees, as shown in the following figure. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 19 Do not climb higher than the fourth rung of the ladder from the top.  Ensure that your body's center of gravity does not shift outside the legs of the ladder. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 20: Others

    Metal shavings from drilling may short-circuit boards inside the equipment.  Obtain the consent from the customer, subcontractor, and Huawei before drilling.  Wear goggles and protective gloves when drilling holes. ...
  • Page 21 UPS output voltage level or frequency. Doing so may affect the power supply to equipment.  Exercise caution when setting battery parameters. Incorrect settings will affect the power supply and battery lifespan. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 22: Overview

    Overview 2.1 Positioning The ECC800-Pro is the core component for the smart module local management. It is intelligent, flexible in connection, easy to maintain, and reliable. It adopts the POE bus for expansion, and allows all intelligent monitoring devices to be flexibly laid out so that it can manage the devices in the smart module.
  • Page 23 Simple − Supports local WiFi hotspots. You can connect to the ECC800-Pro using the app on the mobile phone or tablet computer to view the basic information about the smart module, such as layout, resources, energy efficiency, environment, and alarms. This increases usability.
  • Page 24: Device Description

    3.1 ECC800-Pro 3.1.1 Product Configuration The ECC800-Pro data center controller is used to monitor the devices and environment in the smart module. It consists of the power module and main control module. You can insert and remove the power module.
  • Page 25 (2) 53.5V DC_OUT2 (3) AC_INPUT1 (4) AC_INPUT2 Power Port The ECC800-Pro provides four power ports, including two AC input ports (AC_INPUT1 and AC_INPUT2) and two DC output ports (DC_OUTPUT1 and DC_OUTPUT2). Table 3-3 provides the power port pin definitions. Table 3-3 Power port pin definitions...
  • Page 26: Main Control Module

    Description sequence Pin1 Pin2 Pin3 Pin1 48V+ Pin2 48VGND 3.1.2 Main Control Module Figure 3-3 ECC800-Pro collector main control module (1) USB (2) Status indicator (3) AIDI_1 (4) AIDI_2 (5) COM1/AIDI_4 (6) COM3/12V (7) WAN1 (8) LAN1/POE (9) LAN2/POE (10) WAN2...
  • Page 27 3 Device Description Figure 3-4 ECC800-Pro main control module (side view) (1) SIM card slot (2) Micro-SD card slot (reserved) Specifications Table 3-4 Technical specifications of the ECC800-Pro main control module Item Specifications Power input  Supports one AC input or two AC inputs ...
  • Page 28  After installing the WiFi module, connect the WiFi module to the ECC800-Pro using the app on the mobile phone or tablet computer to view the basic information about the smart module, such as layout, resources, energy efficiency, environment, and alarms.
  • Page 29 DC-HSPA+/HSPA+/HSPA/UMTS: 850/900/1900/2100 MHz GSM/GPRS/EDGE: 850/900/1800/1900 MHz 3G/4G EIRP (max.) 23 dBm Communications Port The ECC800-Pro provides the following communications ports. Figure 3-5 shows the pins of the RJ45 port. Figure 3-5 RJ45 port pins There are four GE ports, that is, two WAN ports (WAN1 and WAN2) and two LAN ports (LAN1/POE and LAN2/POE).
  • Page 30 Steady on: The 12 V DC output is normal.  Off: No 12 V DC output is provided. Table 3-9 COM3/12V port pin definitions Item Description Pin sequence Pin1 RS485+ Pin2 RS485- Pin3 12V DC_OUT Pin4 RS485+ Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 31 Pin 3 and Pin 7 can detect temperature sensors. Table 3-11 AIDI_1, AIDI_2 and AIDI_3 ports pin definitions Item Description Pin sequence Pin1 Type_1 Pin2 Type_2 Pin3 12V DC Pin4 Type_3 Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 32 Steady on: The 12 V DC output is normal.  Off: No 12 V DC output is provided. Table 3-13 USB port pin definitions Item Description Pin sequence Pin1 Pin2 Pin3 Pin4 Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 33 ECC800 Data Center Controller User Manual (for ECC800-Pro) 3 Device Description Indicators Table 3-14 Indicators on the ECC800-Pro main control module Indicat Color Name Status Description Green Running status Steady on The power supply is normal, the indicator program is being loaded.
  • Page 34: Power Module

    Power input overvoltage or undervoltage protection Reverse DC input connection Slight current imbalance Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 35: Southbound Device Introduction

    The converter is working properly. 3.2 Southbound Device Introduction 3.2.1 UIM20A Expansion Module Figure 3-6 UIM20A expansion module front panel (1) Indicators and button (2) COM1/AI/DI_1 - COM8/AI/DI_8 (3) POE Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 36 The maximum output current is 900 mA when the voltage is 12 V. (COM1/AIDI_1 and COM2/AIDI_2 form a group, COM3/AIDI_3 and COM4/AIDI_4 form a group, COM5/AIDI_5 and COM6/AIDI_6 form a group, and Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 37  The 12 V DC power supply can be switched on or off and is on by default. Connects to the ECC800-Pro through the POE port. DIP switch  One 4-bit DIP switch is used to set the RS485 address.
  • Page 38: Rack Environment Unit

    Steady on A board application is being loaded. The board is not running. Blinking The ECC800-Pro is successfully registered, and the software at long runs properly (blinking at long intervals (0.5 Hz), on for 1s and intervals then off for 1s).
  • Page 39 Two active 12 V DC, 200 mA AI/DI input ports Temperature Provides two RJ45 ports to connect to six temperature sensors, each RJ45 sensor port port connecting to three temperature sensors. BLINK Provides a BLINK function. button Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 40: Smart Eth Gateway

    3.2.3 Smart ETH Gateway A smart ETH gateway allows the extension of the 53.5 V DC power supply and FE communication for the ECC800-Pro and can be flexibly deployed in a smart module. Figure 3-9 Smart ETH gateway (1) PWR_IN (2) FE_1 cascading (3) POE_1–2...
  • Page 41 The power input is normal. status There is no power input. indicator Module The power supply is Green running abnormal. status Blinking at The smart ETH gateway indicator long successfully registers with the Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 42: Access Control System

    If the IC cards used by the access control device need to be purchased, the IC card chip specifications are as follows. Table 3-27 IC card chip specifications Item Specifications Chip model Chip name Mifare 1K (S50) card Chip type Philips Mifare 1 IC S50 Operating frequency 13.56 MHz Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 43: Access Actuator

    The access actuator is the control component for the aisle door in a smart module. It connects to the ECC800-Pro controller over FE port, wireless networking (802.15.4). It opens the magnetic lock by detecting the card swiping information of the card reader, door open button information, and fire linkage information.
  • Page 44 Address DIP 4-pin address DIP switch switch E-label Supported Indicators Table 3-29 Access actuator indicators Indicator Color Name Status Green Power input  Steady on: The power input is normal. status indicator Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 45 Blinking at short intervals: The communication is disconnected or the access actuator fails to register with the ECC800-Pro (the indicator blinks at 4 Hz, on for 0.125s and then off for 0.125s).  Blinking: The indicator blinks at super short intervals for 0.5s (blinking at 10 Hz, on for...
  • Page 46: Fingerprint And Card Reader With A Keypad

    Authorized storage A maximum of 3000 authorized users, with a maximum of 6000 fingerprints Communications mode RS485 and Wiegand communications ports Table 3-32 Access control device operating status Item New Version Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 47: Fingerprint And Card Reader

    The buzzer sounds once. 3.2.4.1.3 Fingerprint and Card Reader Figure 3-12 Fingerprint and card reader (1) Fingerprint reader (2) LED indicator Table 3-33 Specifications of a fingerprint and card reader Item Specifications Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 48 Fingerprint reader The indicator turns on (white). Buzzer sounds The buzzer sounds once. Card swiping LED indicator The indicator blinks blue, red, and blue in order. Buzzer sounds The buzzer sounds once. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 49: Card Reader With A Keypad

    12 V DC Stability standby current: 80 mA; working current of the Operating current card swiping button: 150 mA; minimum input current: 12 V DC/300 mA Communications mode Wiegand communications port Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 50: Magnetic Lock

    ECC800 Data Center Controller User Manual (for ECC800-Pro) 3 Device Description 3.2.4.1.5 Magnetic Lock Figure 3-14 Double door magnetic lock Figure 3-15 Single door magnetic lock Figure 3-16 Magnetic lock for a sliding door Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 51: Cabinet Access Control System

    Unlocking with a powered card Card type supported IC card Mechanically unlock Supported Mechanical Code Lock Features:  The cabinet door can be opened with only the key and without the password. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 52: Cabinet Electronic Clasp Lock

    The cabinet electronic clasp lock is used to manage access control. It can be automatically unlocked, or manually locked and unlocked. Figure 3-19 Cabinet electronic clasp lock (1) LED indicator (2) DIP switch (3) RJ45 power port Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 53 (blinking at super 10 Hz, on for 0.05s and then short off for 0.05s). The cycle interva lasts for 5s. Alarm Steady The system is faulty. indicator The system is normal. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 54: Ac Actuator

    AC OUT1: two AC outputs, 100–240 V AC, maximum total current: 5 Power output  AC OUT2: one AC output, 100–240 V AC, maximum current: 5 A. Wireless One wireless communication port, complying with IEEE802.15.4 communicatio Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 55 Blinking at The AC actuator successfully long registers with the ECC800-Pro and intervals the software runs properly (the indicator blinks at 0.5 Hz, on for 1s and then off for 1s). Blinking at The communication is...
  • Page 56: Skylight Actuator

    (5) BLINK button (6) Status indicator (7) Address DIP (8) COM1 port switch (9) COM2 port (10) POE port (11) 48 V power port Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 57 ECC800-Pro and the software runs properly (the indicator blinks at 0.5 Hz, on for 1s and then off for 1s). Blinking at The communication fails or the Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 58 The skylight actuator provides one DO port (LOCK/GND) and one DI port (BUTTON/GND). Table 3-43 lists the LOCK/GND/BUTTON/GND port pin definitions. Table 3-43 LOCK/GND/BUTTON/GND port pin definitions Item Description LOCK/GND LOCK 12V_OUT pin sequence BUTTON/GN BUTTON D pin sequence Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 59: Multi-Functional Sensor

    3.2.7 Multi-Functional Sensor A multi-functional sensor integrates the temperature and humidity (T/H) sensor, smoke sensor and infrared detection. The multi-functional sensor can connect to the ECC800-Pro over FE or wireless communication. The infrared detection function is enabled only when the intelligent lighting function is enabled.
  • Page 60 0.5 Hz, on for 1s and then off for 1s). Blinking at The multi-functional sensor fails short intervals to register with the ECC800-Pro or the communication fails (the indicator blinks at 4 Hz, on for 0.125s and then off for 0.125s). Blinking The indicator blinks at super short intervals for 0.5s (blinking...
  • Page 61: Smoke Sensor

    Output contact capacity 3 A/120 V AC or 3 A/24 V AC –10º C to +50º C Operating temperature Ambient humidity < 95% RH (non-condensing) Dimensions Diameter: 112 mm, height: 41 mm Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 62: Temperature Sensor

    ± 1° C (25° C) –10° C to +55° C Operating temperature Operating voltage 10–16 V DC –40° C to +70° C Storage temperature 3.2.10 Cabinet Temperature Sensor Figure 3-25 Cabinet temperature sensor Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 63: Alarm Beacon

    Installed on a wall Environmental RoHS, Reach requirements Table 3-50 Technical specifications of an alarm beacon Item Specifications RJ45 port, input voltage 9–16 V DC, operating current ≤ 400 Power input Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 64: Optional) Smart U Space Manager

    12 V DC± 5% (RJ45) Rated current and power 250 mA consumption Data upload port One RS485 route (two RJ45 ports) Dimensions (mm) Main control box: 71 mm x 70 mm x 25 mm Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 65: Elight Actuator

    Steady on Associated alarm severity is set to None. The device is abnormal or cables are Other color light Steady on or blinking incorrectly connected to terminals R, G, and B. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 66: Water Sensor

    3.2.14.1 WLDS600 Water Sensor The WLDS600 water sensor consists of a water detection cable, a water detector with the BOM number of 33010556, an extension line, and a conversion cable. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 67 Table 3-54 WLDS600 water sensor specifications Item Specification Dimensions (L 70 mm x 58 mm x 86 mm± 1 x W x H) Power supply 9–16 V DC or 9–16 V AC Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 68: Wlds900 Water Sensor

    DIN track install supported. mode 3.2.14.2 WLDS900 Water Sensor The WLDS900 water sensor with the BOM number of 33010352 consists of a water detection cable, a water detector, and a conversion cable. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 69: Electrode Water Sensor

    –40° C to +85° C Storage temperature Humidity 10%–80% RH (non-condensing) 3.2.14.3 Electrode Water Sensor The electrode water sensor with the BOM number of 33010444 contains electrode probes and cables. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 70: Wifi Module

    IEEE 802.11n, IEEE 802.11g, and IEEE 802.11b Network  11n: up to 150 Mbps bandwidth  11g: up to 54 Mbps  11b: up to 11 Mbps Frequency band 2.4–2.4835 GHz Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 71: Eth Converter

    Modbus-MAC protocol for connecting to the POE bus. Figure 3-33 ETH converter (1) Status indicator (2) BLINK button (3) COM1 communications port (4) COM2 communications port (5) 48 V power port (6) POE port Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 72 10 Hz, on for 0.05s and then off for 0.05s) and then turns off for 0.5s. The cycle lasts for 10s. Alarm A system failure alarm is Steady on indicator generated. No system alarm is generated. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 73: Pad

     3.5 mm stereo headphones port  Micro SD card port  MicroUSB port Camera  Rear camera: 8-megapixel, F2.0 aperture, automatic focus  Front camera: 2-megapixel, F2.4 aperture, fixed focus Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 74: T/H Sensor

    Power adapter charge time: about 3.5 hours (5 V 2 A adapter) 3.2.18 T/H Sensor 3.2.18.1 T/H Sensor (BOM Number: 33010346) Figure 3-35 Appearance The T/H sensor uses an RJ45 connector. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 75 ≤ ±0.3°C (25°C) Temperature accuracy Humidity measuring range 0%–100% RH ≤ ±4% RH (25°C, 30%–80% RH) Humidity accuracy Operating voltage 9–16 V DC –40° C to +80° C (non-condensing) Storage temperature Output RS485 Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 76: T/H Sensor (Bom Number: 02310Nbs)

    Pin1 or Pin 2 Pin3 RS485– Pin4 RS485+ Pin5 or Pin 6 Table 3-65 T/H sensor specifications Item Specifications –20° C to +70° C Temperature measuring range Temperature accuracy ± 1° C Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 77: T/H Sensor (Bom Number: 33010516)

    The appearance of the T/H sensor depends on the onsite delivery. Figure 3-40 Pins of an RJ45 connector Table 3-66 Pin description of an RJ45 connector Description Pin1 or Pin 4 Pin2 or Pin 5 Pin3 Pin6 Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 78: T/H Sensor (Bom Number: 02311Fqg)

    3.2.18.4 T/H Sensor (BOM Number: 02311FQG) Figure 3-41 Appearance (1) RS485-OUT (2) RS485-IN (3) DIP switch (4) Button (5) NTC1–3 (6) NTC4–6 (7) Display Table 3-68 T/H sensor specifications Item Temperature Humidity Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 79: T/H Sensor (Bom Number: 02312Pbl)

    (6) NTC4–6 (7) Display Table 3-69 T/H sensor specifications Item Temperature Humidity –40° C to +70° C Measurement range 1%–99% RH ≤ ±1°C (25°C) ≤ ±5% RH (25°C, 20%–80% RH) Measurement precision Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 80: Infrared Remote Control Module

    Interworks with the monitoring system over Modbus-RTU Communication to implement remote control. The baud rate can be 9600 bit/s. ≤ 10 m Infrared emission distance Power supply 9–16 V DC ≤ 350 mA Power Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 81: Intelligent Battery Monitoring System

    ETH gateway. (Optional) When a battery system needs to be managed by multiple iBOXs, the iBOXs can be connected to northbound devices using straight-through cables (the ECC800-Pro supports four iBOXs in parallel through the smart ETH gateway) without cascading.
  • Page 82: Ibox

    (1) –48 V 0.5 A port (3) COM_IN port (RS485 (2) POE port (power input) communication input) (4) COM_OUT port (5) DI and DO ports (6) HALL_1–HALL_8 (RS485 communication current monitoring ports output) Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 83 (2) Micro SD card slot (3) Default button (IP (4) ADDR dual in-line package (DIP) switch (RS485 reset) communications address) (5) 12 V 2 A port (power input) Power Port Figure 3-47 Power port pins Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 84 Table 3-73 POE port pin definitions Definition Description Supports power supply through the POE port. The TX– terminal is an RJ45 terminal with an indicator. 4, 5 P45_P1 RX– 7, 8 P78_P1 Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 85 Open: The dry contact Dry contact Open input signal input is open. input and – output  Closed: The dry signals contact input is closed. Dry contract  Open: The dry contact Open Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 86  The value of Multi-Hall cur. setting equals the number of positive or negative Hall effect sensors in a single battery string and should be greater than or equal to 1. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 87 Status Initial Descripti nitio Signal Signal Description Status Descriptio Description Specifies Specifies  Grounded: Disconnec Receives whether the whether the cascaded connected. commands connects to BCBs sent by the  Disconnecte Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 88  12 V: signals There is a driving Secondary signal for side ground tripping. DIP Switch Table 3-79 DIP switch description Definition Description ADDR_1 RS485 communications address setting ADDR_2 ADDR_3 ADDR_4 Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 89 If no, contact Huawei technical support. Alarm Steady on The actual Check the value of indicator number of iBAT number, the online iBAT cable connection, devices is less and the iBAT Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 90 Press and hold the Clears the current network (including Button holding down button for more than the network parameters of all the online 10s but less than 20s. iBATs). Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 91: Ibat

     Supports the hibernation function. (When it detects that the battery voltage is low, it will enter the low-power mode.)  Communicates with the iBOX wirelessly. iBAT Appearance Figure 3-52 iBAT2.0 Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 92 The iBAT is blinking. (iBattery 2.0) Blinking at short intervals (iBattery 3.0)  If an indicator blinks at long intervals, it is blinking on for 1s and then off for 1s. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 93 Initializes the network parameters if there is a network. Button holding Hold down the button Clears the current network and resets the down for more than 5s. wireless module; disconnects the network. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 94: Ui Description

    ECC800 Data Center Controller User Manual (for ECC800-Pro) 4 UI Description UI Description 4.1 WebUI For data transmission security, the ECC800-Pro supports WebUI access through TLS. Figure 4-1 Home page WebUI Introduction Table 4-1 WebUI Introduction Second-Leve Third-Level Function Factor...
  • Page 95 PDU8000, and Power Distribution Unit – Aisle Connected devices, such as Multi-Function al Sensor Group, Access Actuator Group, and Skylight Actuator Group – Cooling Connected smart cooling products. – Cabinet IT cabinet Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 96 Setti security certificate. System type is FusionModule2000 by default. NOTE If System type is General, ECC800-Pro is a general collector that collects device data and reports the data to the northbound NMS.  Monitor IP Set the IP address IP for WAN_1 is for the monitoring 192.168.8.10 by default.
  • Page 97 Enable or disable the Parameters Parameters device performance statistics function. – All Configured View the Data performance data for which the statistics function is enabled or disabled. – Event Set alarm Email Settings Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 98 – – Download the app Obtaining installation package by scanning the QR code. – –  Parameter Synchronize Sync device parameters to quickly import data of southbound devices (such as Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 99 Multi-Module Monitoring is displayed on the Home page only after you set Smart Module Cascading.  d: If the system type is FusionModule2000 or FusionModule5000, this function is unavailable.  e: This function is available only in some customized projects. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 100: Mobile Phone App

    Allows you to upgrade the software using a USB flash drive or Upgrade locally. Parameter Sync iFind Allows you to modify the names and positions of devices in the device layout diagram, and deliver a blinking command to a device under iFind. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 101: Pad App

    Device Check the Software Version and Hardware Version of the device. Version Info 4.3 Pad App Figure 4-3 Home screen Table 4-3 Mobile phone app functions Screen Function Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 102 Allows you to view device asset details such as electronic labels of Details system devices and other devices. Device Check the Software Version and Hardware Version of the device. Version Info Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 103: Power-On Commissioning

    Step 1 Connect a network cable between the PC network port and the WAN1 port (protected by a security mechanism) on the ECC800-Pro. Table 5-1 Default IP addresses for the WAN and LAN ports on the ECC800-Pro Port Default IP Address WAN1 192.168.8.10...
  • Page 104 Step 3.3 Step 3.4.  If the ECC800-Pro connects to the Internet, and the PC in a LAN accesses the Internet over a proxy server, do not perform Step 3.3 Step 3.4. Otherwise, you will fail to access the ECC800-Pro.
  • Page 105 Enable file download and set the security level of the trusted site to low. Figure 5-2 Setting parameters When switching between different versions of the ECC800-Pro on your PC, you are advised to clear the historical Internet Explorer cache. Failing to do so may cause some information missed or exception after login.
  • Page 106: Performing Startup Password Authentication (For Fusionmodule800)

    An account is logged out due to timeout if no operation is performed within 10 minutes after system login.  A maximum of three users can log in to the ECC800-Pro WebUI at the same time. ----End 5.2 Performing Startup Password Authentication (for FusionModule800) When the system type is FusionModule800, perform the following steps to configure it.
  • Page 107 Tap the app installation file for installation. After the installation is complete, check that the app icon is displayed on the home screen of the mobile phone or pad. Hold down the SW button on the ECC800-Pro for less than 3s to enable the WiFi function. ...
  • Page 108: Commissioning Configuration Wizard

     It is recommended that you use different user names to log in to both the ECC800-Pro WebUI and app at the same time. If you use the same user name to log in to the WebUI and app at the same time, either of them will be forcibly logged out.
  • Page 109: Setting Alarm Notification By Email And Sms

    The ECC800-Pro is configured with a 4G module and supports 2G/3G/4G SIM card access. 1. The ECC800-Pro supports only SMS notification service but not data service by using the 4G module. 2. China: 2G and 4G networks support China Unicom or China Mobile SIM cards, and 3G networks support only China Unicom SIM cards.
  • Page 110 126 Mail smtp.126.com email sending access the 25; SSL and receiving administrator encryption: 465 functions are page. normal. QQ Mail smtp.QQ.com SSL encryption: 2. Enter ping  Enter the email server Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 111 Step 3 Add an email address to receive emails. The email address is used only for configuring the email function and is not used for other purposes. The address is encrypted during transmission in the ECC800-Pro to ensure that the personal data of users is fully protected.
  • Page 112 The mobile phone number is used only for configuring the SMS function and is not used for other purposes. The phone number is encrypted during transmission in the ECC800-Pro to ensure that the personal data of users is fully protected.
  • Page 113 Settings. Mobile Phone Number can be selected after it is added in SMS Settings. Step 6 Click Confirm to access the re-authentication page. Enter Login password and click Submit. ----End Follow-up Procedure To modify or delete the email parameter settings, click Modify or Delete. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 114: Commissioning The New Main Way

    In the new main way scenario, general input units and power distribution units communicate with the ECC800-Pro using the Modbus-MAC protocol. After the general input units and power distribution units properly connect to the ECC800-Pro, the ECC800-Pro automatically identifies the units.
  • Page 115 Path: Maintenance > Parameter Sync Step 2 Set parameters for power distribution units on the ECC800-Pro WebUI. (Optional) To modify the branch signal name of the power distribution unit, choose System Settings > Signal Name Modify and access the Batch Signal Configuration to modify the name, and then tap Submit.
  • Page 116: Commissioning The Elight

    Step 3 Set eLight parameters. Log in to the ECC800-Pro WebUI as an administrator. In the Smart Module View, click Modify Device. Select an eLight actuator under Devices, drag it to the access actuator to which you want to bind the eLight actuator, and click Exit Edit Mode.
  • Page 117 Description Selection If there is a critical alarm, the eLight Associated alarm Critical strip light turns on with a red light. severity If there are multiple alarms, the eLight Critical, Major Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 118: Commissioning The Elight (For Fusionmodule800)

    Table 5-9 Setting a device address Address Toggle Toggle Toggle Toggle Switch 1 Switch 2 Switch 3 Switch 4 Step 2 Add an eLight. Log in to the ECC800-Pro WebUI as an administrator. Add an eLight. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 119 Step 3 Set eLight parameters. Log in to the ECC800-Pro WebUI as an administrator. Choose Monitoring > Aisle > eLight Actuator Group > eLight Actuator. The Running Parameters page is displayed.
  • Page 120: Commissioning The Pdu2000 (For Fusionmodule800)

    The barcode starts with 21 and is attached to the device. Procedure Step 1 Set the PDU2000 monitoring parameters.  Set the PDU2000-M (C) monitoring parameters. The display of a single-phase module is used as an example. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 121 The display of a single-phase module is used as an example. − After the PDU2000-M (H) is powered on, press MENU. The LCM displays − Press MENU again to access the device communications address screen. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 122 COM1/COM2 port Device address Enter the actual device address of the PDU2000. Click Test Connect to check whether the PDU2000 connects to the ECC800-Pro properly. − If the connection is normal, click Confirm. The connected devices are displayed in the Number of connected devices list.
  • Page 123: Commissioning Cabinet Electronic Clasp Lock (For Fusionmodule800)

    RS485_IN port on the first cabinet electronic clasp lock of an odd-numbered cabinet, and the other end of the cable is connected to the COM2 port on the ECC800-Pro; one end of another network cable is connected to the RS485_IN port on the first cabinet electronic clasp lock of an even-numbered cabinet, and the other end of the cable is connected to the COM3 port on the ECC800-Pro.
  • Page 124 − If the connection is abnormal, check whether the device is properly connected to the ECC800-Pro, whether the device and ECC800-Pro are running properly, and whether the parameter settings are consistent with the device parameters. Connect the electronic locks of other cabinets.
  • Page 125 The cabinet electronic clasp locks unlock the doors in batches based on the signal value. a: Intelligent lock 1 of IT cabinet 101 is used as an example. ----End Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 126: Feature Description

    Step 3 Set device performance parameters, select the performance parameters to be submitted in the first column, set Collecting Data, and click Submit. After the parameters are successfully submitted, is displayed in the setting result of the changed parameters, and the numbers Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 127: Setting Ecc800-Pro Cascading

    You can click links on the cascading management page of the master ECC800-Pro to display the login pages of the other ECC800-Pros. Then, you can log in to view the details. Procedure Step 1 Log in to the ECC800-Pro WebUI as an administrator.
  • Page 128: Commissioning A Uim20A Expansion Module

    Procedure Step 1 Log in to the ECC800-Pro WebUI as an administrator. Step 2 Choose System Settings > Device Management and click Auto Discover Device to add the device. Devices connected to the UIM can be identified.
  • Page 129 Cabinet 3: Cabinet 4: Device rPDU2 rPDU2 rPDU2 rPDU2 Table 6-3 Cable connection mode 2 in the scenario where one UIM maps to four cabinets COM Port COM1 COM3 COM5 COM7 Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 130 Each cabinet can connect to only one T/H sensor, a T/H sensor is automatically bound to the cabinet after its DIP switch is set. The LCD of the T/H sensor displays the DIP switch address. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 131 IT cabinets and devices shows the UIM that is blinking. You can determine the IT cabinet that houses the UIM through indicator blinking. Then, you can change the IT cabinet name. Figure 6-3 Device blinking Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 132: Access Management

    Step 9 (Optional) Click to delete a device binding relationship. Step 10 Choose Home > Plan View on the ECC800-Pro WebUI, and drag the dry contact device to the corresponding position in the Smart Module View pane based on the actual device layout.
  • Page 133: Commissioning A Door Status Sensor (Connected To The Ai/Di Port On The Rack Environment Unit)

    1. Choose AI/DI_2 sensor to Enable, click Submit. AI/DI_2 Rear door Port status 2. Set AI/DI_2 sensor type to Door sensor, click Submit. Settings (AI/DI_2) Step 2 Check the door status sensor functions. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 134: Commissioning A Door Status Sensor (Connected To The Ai/Di Port On The Uim20A Expansion Module)

    Step 1 Set parameters for a door status sensor. In this example, the door status sensor is connected to the AI/DI_1 port on the user interface module1. Log in to the ECC800-Pro WebUI as an administrator. Choose System Settings > Signal Name Modify. The Batch Signal Configuration page is displayed.
  • Page 135: Commissioning The Door Status Sensor (Connected To The Ecc800-Pro)

    Choose System Settings > Signal Name Modify. The Batch Signal Configuration page is displayed. Set Device type to ECC800 and Device name to ECC800, and click OK. On the query result tab page, set the new signal name of AI/DI_3 to Door1 and click Submit.
  • Page 136: Commissioning An Access Control Device And A Cabinet Electronic Lock

     A maximum of eight access actuators are supported.  When the fingerprint reader is connected to the ECC800-Pro for the first time, the permissions need to be synchronized. Procedure Step 1 Set the access user management and access permission management.
  • Page 137 ID, press * on the keyboard of the access controller to stop the authentication process. Then, enter user ID*password#. To query the user ID, log in to the ECC800-Pro WebUI as an administrator. Choose System Settings > Access Management. In the Authorization area, view the user ID corresponding to the user name.
  • Page 138 The fingerprint information is used only for configuring the access control function and is not used for other purposes. The fingerprint information is encrypted during transmission in the ECC800-Pro to ensure that the personal data of users is fully protected.
  • Page 139 Click OK to complete the task of adding access management settings. On the Authorization Operations tab page, click Synchronize to Device, select the modified access control devices, and click Start Synchronization. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 140 If the access control system uses a Card and password reader, choose Monitoring > Aisle > Access Actuator Group > Access Actuator n on the ECC800-Pro WebUI, click Running Parameters, and set Logical level configuration for reader removed of the corresponding card reader to High level alarm.
  • Page 141: Commissioning The Exit Button, Skylight Button, Atmosphere Light, Emergency Button, And Magnetic Lock

    Normal Connection Status Attempt to open the door by pressing the The aisle door is opened successfully. exit button when the aisle door is closed. Step 2 Check functions of the skylight button. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 142 ECC800-Pro. relocate the magnetic lock and alarm on the ECC800-Pro. magnet to minimize the deviation until the door open alarm is cleared. ----End Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 143: Commissioning An Emergency Door Release Button

    If there are multiple VCNs for multiple smart modules, you are advised to evenly distribute the cameras to each VCN.  A maximum of four cameras can be connected in the smart ETH gateway networking scenario. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 144 6 Feature Description Figure 6-8 Camera + VCN connecting to the ETH gateway  To ensure the normal operating of the ECC800-Pro, avoid high data traffic, such as the concurrent display of dynamic monitoring of cameras and VCN500 video playback. ...
  • Page 145: Commissioning A Camera (Smart Eth Gateway Networking Scenario)

     Configure the camera/VCN internal IP address and the IP address of the LAN port on the ECC800-Pro in the same network segment.  Configure the camera/VCN internal IP address and the IP address of the WAN_1 port on the ECC800-Pro in the same network.
  • Page 146 1. Choose Tools > Internet Options. Set the ActiveX controls and plug-ins. The Internet Options dialog box is displayed. 2. Click the Security tab. 3. Click Internet. 4. Click Custom level. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 147 5. Set Use Pop-up Blocker to Disable. 6. Click OK. Choose Settings > Network > Platform Connection > Second Protocol Parameters, and select Enable ONVIF. Figure 6-11 ONVIF parameter Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 148 Remove the network cable from the PC to the POE port on the ETH gateway. Use a network cable to connect the PC to the LAN1 port on the ECC800-Pro, and reconnect the network cable from the smart ETH gateway to the LAN2 port on the ECC800-Pro.
  • Page 149 Change IP camera ONVIF interface access password: If the preset password for accessing the ONVIF interface of the IP camera is changed, enter the new password in Password. Otherwise, the ECC800-Pro cannot collect motion detection alarms from the IP camera.
  • Page 150 6.5.3.2 Commissioning IPC6325 Camera (SD Card Configured). Choose Settings > Video/Audio/Image > Video Settings, and set camera stream type, primary stream, and secondary stream 1 parameters. Set coding protocol to H.265. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 151 ECC800 Data Center Controller User Manual (for ECC800-Pro) 6 Feature Description Figure 6-16 Setting primary stream parameters Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 152: Commissioning Ipc6325 Camera (Sd Card Configured)

    If the VCN is not configured and an SD card is chosen, perform the following procedure. Procedure Step 1 Log in to the Huawei IPC WebUI. Step 2 Format the SD card. Choose Settings > System Configuration > Storage Management.
  • Page 153 Result Coding Resolution Frame Rate I-frame Minimum Supported Protocol Interval Required Video Bit Rate Storage Duration H.265 1080P H.264 1080P H.265 720P 0.8M H.264 720P H.265 720P 0.6M H.264 720P 0.8M Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 154 Figure 6-19 Setting motion detection parameters Step 5 Set the deployment policy. Figure 6-20 Setting the deployment policy Step 6 Set the alarm linkage policy. Figure 6-21 Setting the alarm linkage policy Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 155: Commissioning A Camera (Lan Switch Networking Scenario)

    3. Click LAN Setting. 4. Deselect Use a proxy for your LAN. 5. Click OK. 1. Choose Tools > Internet Options. Set the ActiveX controls and plug-ins. The Internet Options dialog box is displayed. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 156 IPv4 Subnet mask, and IPv4 Gateway address for the camera according to the site plan. Choose Settings > Video/Audio/Image > Video Settings, and set camera stream type, primary stream, and secondary stream 1 parameters. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 157 ECC800 Data Center Controller User Manual (for ECC800-Pro) 6 Feature Description Set coding protocol to H.265. Figure 6-22 Setting primary stream parameters Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 158: Commissioning Ipc6325 Camera (Sd Card Configured)

    If the VCN is not configured and an SD card is chosen, perform the following procedure. Procedure Step 1 Log in to the Huawei IPC WebUI. Configure the PC IP address and the camera IP address in the same network segment.
  • Page 159 Choose Settings > System Configuration > Storage Management. The Storage Management page is displayed. Format the SD card. Set the camera stream type and primary stream parameters. Path: Settings > Video/Audio/Image > Video Settings. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 160 H.265 1080P H.264 1080P H.265 720P 0.8M H.264 720P H.265 720P 0.6M H.264 720P 0.8M Select Enable, click Add, add motion detection areas, set motion detection parameters, and click Save. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 161 6 Feature Description Figure 6-26 Setting motion detection parameters Set the deployment policy. Figure 6-27 Setting the deployment policy Set the alarm linkage policy. Figure 6-28 Setting the alarm linkage policy ----End Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 162: Setting Parameters On The Vcn Webui

    The following uses V100R003 as an example. Choose Local Configuration > Server configuration. Set the service IP address (internal IP address of the VCN), time zone, and time according to the site requirements. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 163 Figure 6-30 Setting the external IP address of the MU Set NatIP to the external IP address of the VCN, which is the same as the external IP address mapped by the VCN on the ECC800-Pro. Set Module name to OMU and click Search.
  • Page 164 VCN IP address in the address box of the Internet browser, and log in to the OMU Portal system.  (Optional) Set up a VCN stack. For details, log in to the https://e.huawei.com/, search for the VCN product documentation, open the documentation, and see the section (Optional) Deploying IVS in Stack Mode.
  • Page 165: Setting Parameters On The Vcn Ivs Client

    User Manual (for ECC800-Pro) 6 Feature Description  (Optional) Create a VCN cluster. For details, log in to the https://e.huawei.com/, search for the VCN product documentation, open the documentation, and see the section (Optional) Deploying MPUs in Cluster Mode. For the VCN500, search for VCN500 Product Documentation. For the VCN510&VCN520&VCN540, search for VCN510&VCN520&VCN540 Product Documentation.
  • Page 166 If you set the recording plan policy is to All, you do not need to set the recording plan time. Click Next to complete the recording plan setting. When is displayed in the status bar, the recording plan has been set successfully. Click Finish. Step 4 Create a user. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 167 In the Assign Device View Rights area, select the cameras to be browsed and queried by the user. Set other parameters based on the documentation delivered with the equipment or the documentation obtained by referring to the Preparing Documentation section, and click Finish. ----End Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 168: Linkage Control

    You have obtained the IP address of the ECC800-Pro as well as the user name and password used for WebUI login.  A PC with an IP address in the same network segment as that of the ECC800-Pro is prepared, and the PC has connected to port WAN1 on the ECC800-Pro. ...
  • Page 169: Fire Control Linkage

    A passive dry contact alarm signal of the customer's fire extinguishing system can be used to achieve the following purposes: (1) Open the skylight using the ECC800-Pro AI/DI port, so that the fire extinguishing system in the customer's equipment room can quickly function in the aisle.
  • Page 170 Choose System Settings > Signal Name Modify. The Batch Signal Configuration page is displayed. Set Device type to ECC800 and Device name to ECC800, and click OK. On the query result tab page, set the new signal name of AI/DI_3 to Fire and click Submit.
  • Page 171: High Temperature Linkage

    The ECC800-Pro implements high temperature linkage. If it detects high temperature alarms by interacting with multi-functional sensors and all smart cooling products fail to communicate with the ECC800-Pro, the ECC800-Pro opens skylights based on the alarm status to facilitate heat dissipation.
  • Page 172 That is, the RF_Z indicators on the ECC800-Pro and AC actuator are both steady green.  If the RF_Z indicator on the ECC800-Pro is not steady green, hold down the SW button on the ECC800-Pro for 8 to 20 seconds to erase network parameters. ...
  • Page 173 Select the actual camera type and go to the camera web page. For details, see the section about camera commissioning. Choose Settings > Network > Platform Connection > Second Protocol Parameters. On the ONVIF and GENETEC tab pages, set platform interconnection parameters. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 174 Parameters. Select Enable, click Add, add motion detection areas, set motion detection parameters, and click Save. Figure 6-38 Setting motion detection parameters If there are multiple cameras, repeat Step 8.1–Step 8.3. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 175: Setting Link Smoke Alarm With Skylight Open

    6.6.1.4 Setting Link Smoke Alarm with Skylight Open Prerequisites  This section uses the skylight button connecting to the AI/DI_1 port on the ECC800-Pro as an example.  A smoke sensor has been connected to the skylight actuator, or a multi-functional sensor has been connected to the smart ETH gateway.
  • Page 176: Fusionmodule800 Linkage Control

    You have obtained the IP address of the ECC800-Pro as well as the user name and password used for WebUI login.  A PC with an IP address in the same network segment as that of the ECC800-Pro is prepared, and the PC has connected to port WAN1 on the ECC800-Pro. Issue 06 (2020-04-22)
  • Page 177 NOTE  After the IT cabinet door automatically opens, a door open alarm is displayed on the active alarms page of the ECC800-Pro.  In the Linkage Group area, click Link emergency ventilation with lock open. Click to expand the Linkage Logic List.
  • Page 178: Link Air Conditioner Fault With Emergency Fan

    Linkage Logic List are unavailable. Step 5 Enable the AI/DI device. Choose Monitoring > System > ECC800 > Running Parameters > AI/DI_2 Port Settings. Set AI/DI_2 sensor to Enable. Click Submit to access the AI/DI_2 setting page.
  • Page 179: Link Smoke Alarm With Cabinet Electronic Clasp Lock Open

    Choose System Settings > Signal Name Modify. The Batch Signal Configuration page is displayed. Set Device type to ECC800, set Device name to ECC800, and click OK. On the query result tab page, set the new signal name of AI/DI_1 to Smoke and click Submit.
  • Page 180: Link Fire Control With Lock Open

    Choose System Settings > Signal Name Modify. The Batch Signal Configuration page is displayed. Set Device type to ECC800 and Device name to ECC800, and click OK. On the query result tab page, set the new signal name of AI/DI_2 to Fire and click Submit.
  • Page 181: Infrared Remote Control Module Control And Management

    6.7.1 Connecting a Communications Cable Procedure Step 1 Connect the T/H sensor to the COM1 port on the ECC800-Pro using a network cable. Step 2 Connect the infrared remote control module to the T/H sensor using a network cable. ----End 6.7.2 Setting and Adding an Infrared Remote Control Module...
  • Page 182: Control Function Of An Infrared Remote Control Module

    The infrared remote control module is connected to the ECC800-Pro, and both are powered on.  You have obtained the IP address of the ECC800-Pro as well as the user name and password used for WebUI login.  You have prepared a PC with an IP address in the same network segment as that of the ECC800-Pro, and the PC is connected to the WAN port on the ECC800-Pro.
  • Page 183 If you do not press the button within 20s, the remote control of the smart cooling product will exit the learning mode due to a timeout. You can click Learning the startup instruction on the ECC800-Pro WebUI and start the learning mode again.
  • Page 184: Pue Configuration

    PUE = Increment in total active electrical energy of device input/Increment in total energy consumption of IT load output NOTE When the configuration mode is set to Standard, the ECC800-Pro can automatically calculate the PUE of multiple devices connected in the N+1 and 2N scenarios. Issue 06 (2020-04-22)
  • Page 185: Configuring Pue Standard Mode

    Step 4 Set the PUE configuration mode to Standard, and click Submit. Step 5 View the PUE. Choose Query > Performance Data and set Device to ECC800 from the drop-down list box. For other searching criteria such as Performance data, Statistics mode, Start time, and End time, select the item based on requirements and click Query.
  • Page 186: Configuring Pue User-Defined Mode

    Deletes a parameter setting for the total power consumption or IT power consumption. Procedure Step 1 Log in to the ECC800-Pro WebUI as an administrator. Step 2 Choose System Settings > PUE Configuration. Step 3 Set PUE function to Enable.
  • Page 187 Figure 6-43 IT cabinet power consumption configuration Under Total Power Consumption Configuration and IT Cabinet Power Consumption Configuration, click the edit icon on the right to modify the multiple for calculating indicators, as shown in Figure 6-44. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 188: Viewing Pue

    Step 5 Calculate the PUE of the smart module. PUE = Increment in total system input electrical energy/Increment in total electrical energy of system IT load output Performance data source: The ECC800-Pro obtains total electricity energy of branches from the power distribution devices.
  • Page 189: Battery Management

    6.9.1 Setting iBOX and iBAT Parameters Procedure Step 1 Log in to the ECC800-Pro WebUI as an administrator. Step 2 Choose Monitoring > Power Distribution > iBOX > Running Parameters. Step 3 Click Unhide All Advanced Signals, set iBOX single battery qty., Batt. installation time, Single battery capacity, Current source, and Battery string No..
  • Page 190: Networking Iboxs And Ibats In Wireless Mode

    (iBattery 2.0) or short intervals (iBattery 3.0), and finally to blinking green at long intervals, the iBAT connects to the iBOX network. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 191: Battery Shallow Discharge Test

    3. During a battery shallow discharge test, if the mains outage occurs, the backup capacity may be inconsistent with the rated capacity. Procedure Step 1 Log in to the ECC800-Pro WebUI as an administrator. Step 2 Choose System Settings > Linkage Control. Set Enable linkage control function to Yes and click Submit.
  • Page 192 Step 3 Set Battery shallow discharge test to On. Step 4 On the Linkage Logical List tab page, click Add or the edit icon Figure 6-47 Setting parameters for Linkage Logic List ----End Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 193: Asset Management

    Connect the smart U space manager to the COM1 or COM2 port on the rack environment unit. Procedure Step 1 Log in to the ECC800-Pro WebUI as an administrator. Step 2 View the position of the smart U space manager. Choose Monitoring > Cabinet > IT Cabinet > Smart U Space Manager.
  • Page 194: Querying The U Space Use Information

    ----End 6.10.1.2 Querying the U Space Use Information Prerequisites  The ECC800-Pro is connected to the NMS that supports asset management.  The actual assets of the smart module have been allocated. Procedure Step 1 Log in to the ECC800-Pro WebUI as an administrator.
  • Page 195: Querying The U Space Use Information

    COM ports on the UIM20A expansion module idle.  The smart U space manager has been connected to the ECC800-Pro through automatic discovery. Procedure Step 1 Log in to the ECC800-Pro WebUI as an administrator.
  • Page 196: Power Management

    Context IT cabinets, network cabinets, and smart cooling products support power management. The ECC800-Pro connected to an IT cabinet is used as an example in this section. Procedure Step 1 Log in to the ECC800-Pro WebUI as an administrator.
  • Page 197 1QF2(L2), 2QF2(L2), and the like.  Descending order: If the branch for the first cabinet is 1QF10(L1), 2QF10(L1), the branches for subsequent cabinets are 1QF9(L3), 2QF9(L3), and the like. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 198 The alarm hysteresis is 5% by default. That is, if the cabinet load factor overhigh alarm threshold is 90%, the raised alarm will be cleared when the load factor drops to a value smaller than 85%. ----End Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 199: Setting Fault Isolation Parameters

    Power distribution devices have been connected to the ECC800-Pro. Procedure Step 1 View the power information on the ECC800-Pro WebUI. Log in to the ECC800-Pro WebUI as an administrator. Choose Monitoring > Cabinet to access the Electricity Information in Each Cabinet page.
  • Page 200: Viewing The Power Supply Links Diagram

    6.11.4 Viewing the Power Supply Links Diagram Procedure Step 1 Connect the pad to the WiFi network of the ECC800-Pro in the room. Step 2 Log in to the ECC800-Pro app as an administrator. Step 3 View the power supply status of the smart module and basic information about each device in real time to quickly locate faults.
  • Page 201  Gray: The cabinet is not running. rPDU  Yellow: smart rPDU (Click to view the rPDU number, current, and status)  Blue or green: non-smart rPDU Branch switch SPD switch Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 202: Cooling Capacity Management

    All smart cooling products in the smart module need to be networked for teamwork. For details about how to configure teamwork networking, see the smart cooling product user manual of the corresponding model. One smart module has only one group. In this group, Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 203 To view Team work status, choose Monitoring > Cooling > NetCol5000 > Running Info > Status Information.  When iCooling is enabled, the T/H threshold can only be set on the ECC800-Pro WebUI. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 204: Viewing Cooling Capacity Usage Information

    Smart cooling products have been connected to the ECC800-Pro. Procedure Step 1 Connect the PAD to the WiFi network of the corresponding ECC800-Pro in the room. Step 2 Choose Home > Temp.. The view displays the temperature distribution map of each cabinet.
  • Page 205 User Manual (for ECC800-Pro) 6 Feature Description Step 3 Use the pad to connect to the WiFi network of the ECC800-Pro in the room. Step 4 Log in to the ECC800-Pro app as the administrator. Step 5 View the cooling distribution information.
  • Page 206: Setting The Temperature Map

    6.12.4 Setting the Temperature Map If the temperature map function is configured, follow the instructions provided in this section to commission it. Prerequisites Cables to the NTC and T/H sensors have been connected. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 207 Device addresses are set in binary coding format in the range of 1–63. The first bit is the least significant bit, and the sixth bit is the most significant bit. ON indicates 1, and OFF indicates Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 208 6 Feature Description Figure 6-58 T/H sensor DIP switch  In the smart module view on the ECC800-Pro WebUI, cabinets are arranged from left to right and from top to bottom according to T/H sensor addresses 1 to 8. ...
  • Page 209: Facial Recognition

    The facial data is used only for configuring the facial recognition function and is not used for other purposes. The facial data is encrypted during transmission in the ECC800-Pro to ensure that the personal data of users is fully protected.
  • Page 210: Collecting And Importing Facial Data In Offline Mode

    Step 1 Collect facial data in offline mode. On the login screen of the app on the mobile phone or pad, tap Settings and select Face Info Collection to collect facial data. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 211: Opening The Access Control System Using Facial Recognition

    After facial recognition is successful, log in to the app as an administrator to open the access control system at the same time. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 212: Maintaining The Facial Data

    The facial data has been recorded. Procedure Step 1 Use the pad to connect to the WiFi network of the ECC800-Pro in the room. Step 2 Log in to the FusionModule app on the pad as an administrator. Step 3 On the app home screen, tap .
  • Page 213: Setting Neteco Parameters

    When the smart module can be connected to the NetEco, perform the following steps to configure parameters. Procedure Step 1 Apply for a fixed IP address to the equipment room network administrator. Step 2 Set the IP address, subnet mask, and default gateway on the ECC800-Pro WebUI. Table 6-46 IP parameters Path Parameter...
  • Page 214: Creating An Ecc800-Pro On The Neteco

    Data Center Planning window is displayed. Click in the upper left area of the Data Center Planning window. Click Access switch to the Add Device window. You can add an ECC800-Pro device to the specified modular in the Add Device window. Issue 06 (2020-04-22)
  • Page 215: Creating An Ecc800-Pro On The Cloudopera Neteco

    If the FusionModule800 smart module can be connected to the CloudOpera NetEco management system, perform the following steps to set parameters. Procedure Step 1 Connect the ECC800-Pro to the CloudOpera NetEco by referring to the section "Accessing a Site" in the CloudOpera NetEco Online Help. ----End...
  • Page 216 For example, the port number of COM1 on UIM1 is 3215 in Figure 6-63.  An ECC800-Pro can connect to a maximum of four UIM20A expansion modules with the transparent transmission function.  A UIM20A expansion module provides a maximum of eight COM ports with the transparent transmission function.
  • Page 217 Step 12 Choose System > Configuration > Transmission Channel Management. Step 13 Click Modify after selecting the IP address of the ECC800-Pro connected to the NMS.  If Connection mode is set to Compatible, click Confirm.
  • Page 218: Third-Party Nms Management (Over Snmp)

    Figure 6-65 Page for managing transparent transmission channels ----End 6.14.2 Third-party NMS Management (over SNMP) 6.14.2.1 Connecting a Communications Cable Procedure Step 1 Connect a communications cable to the WAN1 port on the ECC800-Pro. Figure 6-66 Connecting a communications cable ----End 6.14.2.2 Setting SNMP Management Parameters Prerequisites Before setting SNMP parameters, obtain the information listed as follows from the NMS.
  • Page 219 SNMPv3 as an example. Procedure Step 1 Apply to the equipment room network administrator for a fixed IP address. Step 2 Set the IP address, subnet mask, and default gateway on the ECC800-Pro WebUI. Table 6-51 IP parameters Path...
  • Page 220 For carrier users: Log in to http://support.huawei.com, download the software package of the required version from Support > Software > Carrier Cloud & Data Center > Data Center Facility > Fusion Modular Data Center > ECC800, and decompress the software package to obtain the Mib file. ----End Issue 06 (2020-04-22) Copyright ©...
  • Page 221: Maintenance

    The cable connection is Secure loose cables. connection secure. Cables are not damaged. Replace damaged cables. Table 7-2 Routine maintenance for the main control module in the ECC800-Pro Check Item Expected Result Troubleshooting Indicator The green indicator is steady If the indicator is off or any abnormal on or blinking.
  • Page 222: Common Faults And Troubleshooting

    If the PSU is locked out, steady on. protection is triggered. disconnect the AC input from the PSU, and then power on the PSU again after the indicator turns off. If the fault persists, replace Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 223 Communication between the Check whether the cable blinking at short intervals independent deployment connection between the (2.5 Hz, on for 0.2s and then AI_DI unit and the main ECC800-Pro and the Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 224: Component Replacement

    UIM20A expansion module interrupted. is normal, whether the board is faulty, and whether the UIM20A expansion module is added on the ECC800-Pro WebUI. The ALM indicator is on. An alarm whose default Check and clear the alarm. severity is major exists.
  • Page 225: Replacing An Ecc800-Pro Main Control Module

    Path: Maintenance > Configuration File > Back Up Current Settings If the main control module is damaged, you may fail to log in to the ECC800-Pro. In this case, you cannot back up the settings.
  • Page 226: Replacing An Ecc800-Pro Psu

    Step 5 (Optional) Remove the SIM card from the corresponding slots of the ECC800-Pro main control module. Step 6 (Optional) Install the removed SIM card in the corresponding slot of the new ECC800-Pro main control module. Figure 7-2 Installing a SIM card Step 7 Install the spare ECC800-Pro main control module in the ECC800-Pro subrack and tighten the screws on both sides of the ECC800-Pro main control module.
  • Page 227: Replacing Ecc800-Pro Antennas

     Tools: ESD wrist strap, ESD gloves  Materials: Spare ECC800-Pro antennas of the same model are available and functional. Procedure Step 1 Remove the 4G antenna cables and RF_Z antenna cables connected to the ports on the ECC800-Pro, as shown in Figure 7-4.
  • Page 228: Replacing A Sim Card

    Step 2 Loosen the screws on both sides of the ECC800-Pro main control module. Step 3 Pull the handles on both sides of the ECC800-Pro main control module, and to remove the main control module.
  • Page 229 Step 6 Install the ECC800-Pro main control module in the card slot. Step 7 Tighten the screws on both sides of the ECC800-Pro main control module. Step 8 Reconnect signal cables to the ECC800-Pro main control module panel based on the recorded information.
  • Page 230: Faq

    Step 1 Log in to the ECC800-Pro WebUI as an administrator. Step 2 Click in the upper right corner of the home page and view the ECC800-Pro version information. Step 3 Choose Maintenance > Version Information and view the version information of ECC800-Pro and connected device.
  • Page 231: How To Check The System Type And Set The Smart Module Name

    Go to the Re-authentication page, enter the login user name and password, and click Submit. Step 2 Choose System Settings > System Parameters > Site Configuration, modify Smart module name, and click Submit in the Site ID area. ----End Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 232: How To Manage Webui Users

    Procedure Step 1 Change the login password. Log in to the ECC800-Pro WebUI as an administrator. Choose Maintenance > User Management. The user management page is displayed. Choose the user to be modified and click Modify. Reset the login password on the displayed page.
  • Page 233 The WebUI supports a maximum of 16 users and a maximum of 3 concurrent online users. ----End Follow-up Procedure If you forgot the password, perform the following steps: Click Forgot password. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 234: How Do I Create A Smart Module Plan View

    Step 1 Choose Home > Plan View and click Create smart module in Smart Module View. The Modify Basic Config dialog box is displayed. Set the layout and device quantity in Layout and Half-size cabinet qty./row based on the actual smart module scenario. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 235  Press the BLINK button on a device for less than 1s to report the blinking status to the ECC800-Pro. The corresponding device icon in the WebUI plan view blinks. ...
  • Page 236 Exit Edit Mode. The smart module plan view is updated. When editing the smart module view, click Zoom In or Restore to adjust the size of the view. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 237: How Should I Set And Add Devices

    Step 3 Choose Settings > Communication, and set IP address assign to Automatic(DHCP). Step 4 Tap to go back to the main menu screen. After setting parameters for the integrated UPS, the ECC800-Pro discovers the access from the integrated UPS automatically. ----End 8.1.6.2 How to Set and Add a UPS2000-G?
  • Page 238 Select COM2 from the drop-down list box. parameters for Port NOTE adding devices The setting example indicates that the UPS2000-G is are displayed. connected to the COM2 port on the ECC800-Pro. If the Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 239: How To Set And Add A Ups5000-E

    The section describes how to add a UPS2000-G in a single UPS scenario. In a parallel UPS scenario, if the common communications address of the Modbus card is added to the ECC800-Pro, all UPS2000-Gs can be connected to the ECC800-Pro.
  • Page 240 Number of connected devices list. − If the UPS5000-E does not connect to the ECC800-Pro properly, check whether the cable between the UPS5000-E and the ECC800-Pro is connected properly, whether the UPS5000-E and ECC800-Pro are running properly, and whether the input parameters are consistent with the UPS5000-E parameters.
  • Page 241: How To Set And Add A Pdu8000 Or Integrated Pdu (Over Modbus-Tcp)

    PDU, and the other end has been connected to the PoE port on the smart ETH gateway. Context The method of connecting the PDU8000 to the ECC800-Pro is the same as that for the integrated PDU. Connecting the integrated PDU to the ECC800-Pro by following the instructions in this section.
  • Page 242: How To Set And Add A Pdu8000 (Over Modbus Rtu)

    8.1.6.6 How to Set and Add a PDU8000 (over Modbus RTU)? Prerequisites One end of the straight-through cable has been connected to the COM port on the PDU8000, and the other end has been connected to the COM port on the ECC800-Pro collector or ETH converter. Procedure Step 1 Set the PDU8000 monitoring parameters.
  • Page 243: How Should I Set And Add A 5G Dc Power Supply (Mts9604B-N20B1)

    Number of connected devices list. − If the PDU8000 does not connect to the ECC800-Pro properly, check whether the cable between the PDU8000 and the ECC800-Pro is connected properly, whether the PDU8000 and ECC800-Pro are running properly, and whether the input parameters are consistent with the PDU8000 parameters.
  • Page 244 User Manual (for ECC800-Pro) 8 FAQ Figure 8-11 DIP switches on the SMU11D Figure 8-12 DIP switches Table 8-6 DIP switch settings Monitoring Toggle Switch 1 Toggle Switch 2 Toggle Switch 3 Address Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 245: How To Set And Add A Pdu2000

    One end of the straight-through cable has been connected to the COM 1 or COM 2 port on the PDU2000, and the other end has been connected to the COM port on the ECC800-Pro collector, UIM20A expansion module, or ETH converter.
  • Page 246 The display of a single-phase module is used as an example. − After the PDU2000-M (C) is powered on, the LCM displays the initialization screen. Figure 8-13 PDU2000-M (C) initialization screen − Press MENU to enter the device communications address screen. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 247 Press MENU to confirm the settings. − If modification is successful, is displayed: If modification fails, displayed: Step 2 Add a PDU2000. Log in to the ECC800-Pro WebUI as an administrator. Add a PDU2000. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 248: How Do I Set And Add An Ats

    8.1.6.9 How Do I Set and Add an ATS? Prerequisites One end of the straight-through cable has been connected to the COM port on the ATS, and the other end has been connected to the COM port on the ECC800-Pro collector or ETH converter. Context The ATS (ABB) model is OMD800.
  • Page 249: How To Set And Add A Pmac615 Ac Meter

    Prerequisites One end of the straight-through cable has been connected to the RS485 port on the PMAC615 AC meter, and the other end has been connected to the COM port on the ECC800-Pro. Context The model of the single-phase AC meter for the lighting control box is PMAC615.
  • Page 250 If the PMAC615 connects to the ECC800-Pro properly, click Confirm. The connected devices are displayed in the Number of connected devices list. − If the PMAC615 does not connect to the ECC800-Pro properly, check whether the cable between the PMAC615 and the ECC800-Pro is connected properly, whether Issue 06 (2020-04-22)
  • Page 251: How To Set And Add A Pmac625 Ac Meter

    8.1.6.11 How to Set and Add a PMAC625 AC Meter? Prerequisites One end of the straight-through cable has been connected to the RS485 port on the PMAC625 AC meter, and the other end has been connected to the COM port on the ECC800-Pro. Context ...
  • Page 252 If the PMAC625 connects to the ECC800-Pro properly, click Confirm. The connected devices are displayed in the Number of connected devices list. If the PMAC625 does not connect to the ECC800-Pro properly, check whether the − cable between the PMAC625 and the ECC800-Pro is connected properly, whether the PMAC625 and ECC800-Pro are running properly, and whether the input parameters are consistent with the PMAC625 parameters.
  • Page 253: How To Set And Add A Pdc Dc Meter

    Prerequisites One end of the straight-through cable has been connected to the RS485 port on the PDC DC meter, and the other end has been connected to the COM port on the ECC800-Pro. Context The model of the PDC is PDU8000-0630DCV5-HVA002 and the BOM number is 02403121.
  • Page 254: How Should I Set And Add A Netcol5000-A025/A035/A042/A050 Parameters (Modbus-Tcp)

    ECC800 Data Center Controller User Manual (for ECC800-Pro) 8 FAQ Click Test Connect to check whether the PDC DC meter connects to the ECC800-Pro properly. − If the PDC DC meter connects to the ECC800-Pro properly, click Confirm. The connected devices are displayed in the Number of connected devices list.
  • Page 255: How To Set And Add A Netcol5000-A025 Parameters (Over Mac-Modbus)

    Choose Settings > Comm Settings > Modbus Settings, and set Connection mode to Server and client, Server encryption to Enable. After the NetCol5000-A025 parameters are set, the ECC800-Pro can automatically identify the automatic access of the NetCol5000-A025. Step 2 Set the running parameters and control parameters for the 25 kW smart cooling product on the ECC800-Pro WebUI.
  • Page 256: How To Set And Add A Netcol5000-C(030, 032)/Netcol5000-C(065, 080) Parameters (Over Modbus Tcp)

    Choose Settings > Comm Settings > Modbus Settings, and set Connection mode to Server and client, Server encryption to Enable.  After setting parameters for the NetCol5000-C(030, 032), the ECC800-Pro discovers the access from the smart cooling product automatically. ...
  • Page 257: How To Set And Add A Netcol5000-C030 (Over Modbus Rtu)

    Port NOTE are displayed. The setting example indicates that the NetCol5000-C030 is connected to the COM1 port on the ECC800-Pro. If the NetCol5000-C030 is connected to another port, enter the number of the connected port. Device Address In this example, Device Address is set to 1. During actual configuration, set the device address for the NetCol5000-C030 based on the actual situation.
  • Page 258: How To Set And Add An Ip Device

    IP devices, such as ATMs, are devices with IP attributes in equipment room or site. By adding an IP device, you connect the device to the ECC800-Pro in the same network so that the ECC800-Pro monitors the device status. If the IP device is offline, the ECC800-Pro will report a disconnection alarm on its WebUI.
  • Page 259: How To Set And Add An Independent Deployment Ai_Di Unit

    User Manual (for ECC800-Pro) 8 FAQ Online detection timeout interval is 30 by default, which means that the ECC800-Pro determines that the communication with the device is interrupted if the device has no response within 30 seconds. Step 4 Set IP device num to 5. The value range is 0 to 100.
  • Page 260 Confirm. The connected devices are displayed in the Number of connected devices list. If the independent deployment AI_DI unit does not connect to the ECC800-Pro properly, check whether the cable between the independent deployment AI_DI unit and the ECC800-Pro is connected properly, whether the independent deployment...
  • Page 261: How To Set And Add A Uim20A Expansion Module (Over Modbus-Tcp)

    Connect one end of a network cable to the POE port on the UIM20A expansion module and the other end to the LAN port on the ECC800-Pro or the POE port on the smart ETH gateway. Cascading of user interface modules is not supported.
  • Page 262  After the commissioning is complete, clean up dust. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 263: How To Set And Add The Smoke Sensor (Connected To The Ai/Di Port On The Ecc800-Pro)

     Connecting Cables to the Smoke Sensor (NC): The smoke sensor has been connected to the AI/DI port on the ECC800-Pro collector using a network cable. Short-circuit core wires 1 and 8 on the other end of the network cable, and connect the network cable to the cable delivered with the smoke sensor.
  • Page 264 (white-blue) and 8 (brown) have been short-circuited, core wires 6 (green) and 7 (brown-white) have been connected to the cable delivered with the smoke sensor, and the other end of the network cable has been connected to the AI/DI port on the ECC800-Pro. Context ...
  • Page 265: How Should I Set And Add The Smoke Sensor (Connected To The Ai/Di Port On The Skylight Actuator)

    Step 1 Set smoke sensor parameters. In this example, the smoke sensor is connected to the AI/DI_1 port on the skylight actuator. Log in to the ECC800-Pro WebUI as an administrator. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 266: How To Set And Add The Smoke Sensor (Connected To The Ai/Di Port On The Rack Environment Unit)

    In this example, the smoke sensor is connected to the AI/DI_1 port on the rack environment unit. Log in to the ECC800-Pro WebUI as an administrator. Choose Monitoring > Cabinet > IT Cabinet n > Cabinet Collector n > Running Parameters.
  • Page 267: How Should I Set And Add The Smoke Sensor (Connected To The Ai/Di Port On The Uim20A Expansion Module)

    Step 1 Set smoke sensor parameters. In this example, the smoke sensor is connected to the AI/DI_1 port on the UIM20A expansion module. Log in to the ECC800-Pro WebUI as an administrator. Choose Monitoring > System > UIM Group> UIM n > Running Parameters.
  • Page 268: How To Set And Add The Wlds900 Water Sensor

    If a water sensor is installed, perform the following steps to configure it. Prerequisites One end of the straight-through cable has been connected to the RJ45 port on the WLDS900 water sensor, and the other end has been connected to the AI/DI port on the ECC800-Pro. Context ...
  • Page 269: How To Set And Add The Wlds600 Water Sensor

    Step 4 Click Test Connect to check whether the water sensor connects to the ECC800-Pro properly.  If the water sensor connects to the ECC800-Pro properly, click Confirm. The connected devices are displayed in the Number of connected devices list.
  • Page 270: How To Set And Add The Electrode Water Sensor

    Procedure Step 1 Set water sensor parameters. In this example, the water sensor is connected to the AI/DI_5 port on the ECC800-Pro. Log in to the ECC800-Pro WebUI as an administrator. Choose System Settings > Signal Name Modify. The Batch Signal Configuration page is displayed.
  • Page 271: How To Set And Add The Temperature Sensor (Connected To The Ai/Di Port On The Ecc800-Pro)

    If a temperature sensor is installed, perform the following steps to configure it. Prerequisites One end of the straight-through cable has been connected to the RJ45 port on the temperature sensor, and the other end has been connected to the AI/DI port on the ECC800-Pro. Context ...
  • Page 272: How To Set And Add The Temperature Sensor (Connected To The Ntc Port On The Rack Environment Unit)

    ----End 8.1.6.30 How Should I Commission a Temperature Sensor (Connected to the NTC Port on the T/H Sensor)? If a temperature sensor is installed, perform the following steps to configure it. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 273 Therefore, you do not need to set parameters. Step 2 Add the T/H sensor. Log in to the ECC800-Pro WebUI as an administrator. Add the T/H sensor. Choose System Settings > Device Management and click Auto Discover Device to add the T/H sensor.
  • Page 274: How To Set And Add The Temperature Sensor (Bom Number: 33010516)

    If a T/H sensor is installed, perform the following steps to configure it. Prerequisites One end of the straight-through cable has been connected to the RS485_IN port on the T/H sensor, and the other end has been connected to the COM port on the ECC800-Pro or the UIM20A expansion module. Context This section describes how to set and add a T/H sensor by using the COM port on the ECC800-Pro as an example.
  • Page 275 Number of connected devices list. − If the T/H sensor does not connect to the ECC800-Pro properly, check whether the cable between the T/H sensor and the ECC800-Pro is connected properly, whether the T/H sensor and ECC800-Pro are running properly, and whether the input parameters are consistent with the T/H sensor parameters.
  • Page 276: How To Set And Add The T/H Sensor (Bom Number: 02310Nbs)

    If a T/H sensor is installed, perform the following steps to configure it. Prerequisites One end of the straight-through cable has been connected to the RS485_IN port on the T/H sensor, and the other end has been connected to the COM port on the ECC800-Pro or the UIM20A expansion module. Context This section describes how to set and add a T/H sensor by using the COM port on the ECC800-Pro as an example.
  • Page 277 Number of connected devices list. − If the T/H sensor does not connect to the ECC800-Pro properly, check whether the cable between the T/H sensor and the ECC800-Pro is connected properly, whether the T/H sensor and ECC800-Pro are running properly, and whether the input parameters are consistent with the T/H sensor parameters.
  • Page 278: How Should I Set And Add The T/H Sensor (Bom Number: 02311Fqg/02312Pbl)

    02311FQG/02312PBL)? Prerequisites One end of the straight-through cable has been connected to the RS485_IN port on the T/H sensor, and the other end has been connected to the COM port on the ECC800-Pro or the UIM20A expansion module. Context This section describes how to set and add a T/H sensor by using the COM port on the ECC800-Pro as an example.
  • Page 279 Number of connected devices list. − If the T/H sensor does not connect to the ECC800-Pro properly, check whether the cable between the T/H sensor and the ECC800-Pro is connected properly, whether the T/H sensor and ECC800-Pro are running properly, and whether the input parameters are consistent with the T/H sensor parameters.
  • Page 280: How To Restore Factory Settings

    ECC800-Pro WebUI.  You need to apply to an organization authorized by the customer for a network security certificate and its key with the ECC800-Pro IP address or domain name. This section describes how to import the certificate and key. Procedure Step 1 Log in to the ECC800-Pro WebUI as an administrator.
  • Page 281: How Can I Install A Device Access Certificate

    You have obtained a device access certificate and the certificate key and have copied the certificate and key file to the PC.  A preset certificate is provided for the ECC800-Pro and its connected devices. If a higher security level is required, replace the certificate both on the ECC800-Pro and the devices.
  • Page 282: How Do I Configure Ecc800-Pro Alarm Parameters

    Step 2 Choose System Settings > Alarm Parameters. Step 3 On the Basic Alarm Parameters page, choose ECC800 from the Select a device type drop-down list box, choose the ECC800 to be set from the Device name drop-down list box, and then click Confirm.
  • Page 283: How Can I View Real-Time Monitoring Data, Active Alarms, Historical Alarms, Access Event, And Operation Logs

    Step 2 Click Monitoring, select the device to be viewed, and select Running Info to view the real-time data of the device. Step 3 Choose Home > Active Alarms to view the active alarms of the ECC800-Pro. Click Details in the Alarm Details area to view alarm details of devices.
  • Page 284: How Can I View Performance Data

    8.1.15 How Is a Signal Name Changed? Context  In this example, the smoke sensor is connected to the AI/DI_3 port on the ECC800-Pro.  The following procedure describes how to change the signal name of AI/DI_3. Other signal names can be changed in a similar way.
  • Page 285: How Can I Export Or Import A Configuration File

    ----End 8.1.17 How Can I Export or Import a Configuration File? Context You can export parameter configurations for ECC800-Pro_1 to a PC. If ECC800-Pro_2 needs the same parameter configurations, import the configuration file to ECC800-Pro_2. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 286: How Can I Export Fault Information

    ECC800 Data Center Controller User Manual (for ECC800-Pro) 8 FAQ  ECC800-Pro_2 and ECC800-Pro_1 must have the same type and number of connected devices.  Configuration files cannot be imported or exported for the monitoring module IP parameters, smart module certificate, NetEco certificate, NetEco second-challenge password, time configuration parameters, access user management, access permission management, device access certificate, logs, and user configuration information.
  • Page 287: How Can I Synchronize Device Parameters

     Target device: device after replacement Procedure Step 1 Log in to the ECC800-Pro WebUI as an administrator. Step 2 Choose Maintenance > Parameter Sync. Step 3 Select a value from the Device type drop-down list box. Step 4 Specify source device and target device, click Submit.
  • Page 288: What Do I Do If The Ecc800-Pro Webui Display Language Changes From Chinese To English During Use

    8.1.22 What Should I Do if I Forget the ECC800 IP Address? Procedure Step 1 If the ECC800 has been connected to the NMS, you can query the IP address on the NMS. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 289: What Should I Do If A Message Indicating Unauthorized Fingerprint Is Displayed During Fingerprint Scanning On The Access Control Device (Fingerprint Has Been Recorded)

    User Manual (for ECC800-Pro) 8 FAQ Step 2 If the ECC800 is not connected to the NMS, hold down the SW button on the ECC800 for 1 minute to restore the default IP address. Press and hold down the SW button for 1 minute to restore factory settings and clear user information.
  • Page 290: How Can I Rectify Camera Access Restriction

    8 FAQ 8.1.24 How Can I Rectify Camera Access Restriction? Prerequisites If Huawei S12700 series switch is used, refer to this section to rectify the fault. For more information, consult network engineers. Context The camera is inaccessible after the MAC address and IP address are bound in network configuration.
  • Page 291 Figure 8-28 Network diagram Procedure Step 1 Ensure that the device communication mode has been set to DHCP. Step 2 Log in to the ECC800-Pro WebUI as an administrator, and check whether the device exists on the Monitoring page. ...
  • Page 292: How Should I Add The Devices Accessed Through A Smart Eth Gateway Over Modbus-Mac To The Ecc800-Pro Webui

    The device that supports Modbus-MAC can be automatically identified by the ECC800-Pro. Figure 8-30 Network diagram Procedure Step 1 Log in to the ECC800-Pro WebUI as an administrator, and check whether the device exists on the Monitoring page. The following is an example of confirming the access of a WiFi converter.
  • Page 293 ECC800-Pro and that the device and ECC800-Pro are operating properly. ----End Follow-up Procedure Choose Home > Plan View on the ECC800-Pro WebUI, and drag the device to the corresponding position in the Smart Module View pane based on the actual device layout. Issue 06 (2020-04-22)
  • Page 294: How Should I Add Devices Accessed Through The Eth Converter To The Ecc800-Pro Webui

    ECC800 Data Center Controller User Manual (for ECC800-Pro) 8 FAQ 8.1.27 How Should I Add Devices Accessed Through the ETH Converter to the ECC800-Pro WebUI? Context Figure 8-32 Network diagram Procedure Step 1 Set communications parameters on the device. Table 8-39 Description of communications parameters to be set on a device...
  • Page 295 Running Parameters and set Device name to ETH Converter n_Device name. ----End Follow-up Procedure Choose Home > Plan View on the ECC800-Pro WebUI, and drag the device to the corresponding position in the Smart Module View pane based on the actual device layout. Issue 06 (2020-04-22)
  • Page 296: How Should I Add Devices Accessed Through The Ecc800-Pro Com Port To The Ecc800-Pro Webui

    8 FAQ 8.1.28 How Should I Add Devices Accessed Through the ECC800-Pro COM Port to the ECC800-Pro WebUI Prerequisites This section uses the device connecting to the COM1 port on the ECC800-Pro as an example. Context Figure 8-33 Network diagram Procedure Step 1 Set communications parameters on the device.
  • Page 297: How Should I Add Devices Accessed Through The Ecc800-Pro Ai/Di Port To The Ecc800-Pro Webui

    ----End Follow-up Procedure Choose Home > Plan View on the ECC800-Pro WebUI, and drag the device to the corresponding position in the Smart Module View pane based on the actual device layout. 8.1.29 How Should I Add Devices Accessed Through the...
  • Page 298 8 FAQ Context Figure 8-34 Network diagram The AI/DI_1, AI/DI_2, and AI/DI_3 ports on the ECC800-Pro can be automatically identified by devices, but the AI/DI_4 and AI/DI_5 ports cannot be automatically identified. Procedure Step 1 Log in to the ECC800-Pro WebUI as an administrator.
  • Page 299: How Do I Add An Rs485 Device Connected To The Ecc800-Pro Through A Uim

    ----End Follow-up Procedure Choose Home > Plan View on the ECC800-Pro WebUI, and drag the device to the corresponding position in the Smart Module View pane based on the actual device layout. 8.1.30 How Do I Add an RS485 Device Connected to the...
  • Page 300: How Do I Add A Dry Contact Device Connected To The Ecc800-Pro Through A Uim

    UIMs in the same smart module, a maximum of 48 dry contact devices can be connected. Procedure Step 1 Log in to the ECC800-Pro WebUI as an administrator. Step 2 Add the device. Table 8-45 Parameter description for adding a device...
  • Page 301: How Should I Open Doors Remotely Over The Ecc800-Pro Webui

    Step 3 After setting all mandatory parameters, click Submit. ----End Follow-up Procedure Choose Home > Plan View on the ECC800-Pro WebUI, and drag the dry contact device to the corresponding position in the Smart Module View pane based on the actual device layout.
  • Page 302: How Should I Turn On Or Off Aisle Lights In The Smart Module Over The Ecc800-Pro Webui

    When the local light button is faulty or lights cannot be turned on through a linkage, you can remotely turn on the lights over the ECC800-Pro WebUI. Procedure Step 1 Log in to the ECC800-Pro WebUI as an administrator. Step 2 Turn on or off aisle lights. Table 8-47 Turning on or off aisle lights...
  • Page 303: How Should I Opening Skylights Remotely Over The Ecc800-Pro Webui

    8.1.34 How Should I Opening Skylights Remotely over the ECC800-Pro WebUI? Context You can open skylights over the ECC800-Pro WebUI in emergencies. Procedure Step 1 Log in to the ECC800-Pro WebUI as an administrator. Step 2 Open skylights. Table 8-48 Opening skylights Path Setting Monitoring >...
  • Page 304: How Should I Turn On Or Off Smart Cooling Products Over The Ecc800-Pro Webui

    8.1.35 How Should I Turn On or Off Smart Cooling Products over the ECC800-Pro WebUI? Context You can turn on or off smart cooling products over the ECC800-Pro WebUI in emergencies. Procedure Step 1 Log in to the ECC800-Pro WebUI as an administrator.
  • Page 305: How Should I Open The Cabinet Electronic Lock Over The Ecc800-Pro Webui

    When O&M personnel need to open a cabinet for maintenance, you can open the cabinet electronic lock over the ECC800-Pro WebUI. Procedure Step 1 Log in to the ECC800-Pro WebUI as an administrator. Step 2 Open the cabinet electronic lock. Table 8-50 Opening a cabinet electronic lock...
  • Page 306: How Should I Link The Smoke Alarm With The Alarm Beacon Over The Ecc800-Pro Webui

    8.1.37 How Should I Link the Smoke Alarm with the Alarm Beacon over the ECC800-Pro WebUI? Prerequisites The alarm beacon is connected to the DO port on the ECC800-Pro. Context After the smoke alarm is linked with the alarm beacon, if smoke is detected inside the smart module, the alarm beacon connecting to the corresponding DO port will generate an audible and visual alarm.
  • Page 307: How Should I Link The Ai/Di Alarm With The Alarm Beacon Over The Ecc800-Pro Webui

    Procedure Step 1 Choose System Settings > Alarm Parameter > Alarm Linkage. Step 2 Select ECC800 for Device type, select Device Type or Device for Linkage type, and click Confirm. Select ECC800 from the Device name list if you have selected Device for Linkage type, and click Confirm.
  • Page 308: App Operations

    Figure 8-41 Modifying a device name 8.2 APP Operations 8.2.1 How to Connect to a WiFi Network Procedure Step 1 Connecting to a WiFi network. Insert a WiFi module into the USB port on the ECC800-Pro. Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 309: How To Prepare And Login The App

    You have obtained the IP address of the ECC800-Pro as well as the user name and password used for WebUI login.  A PC with an IP address in the same network segment as that of the ECC800-Pro is prepared, and the PC has connected to port WAN1 on the EECC800-Pro. Procedure Step 1 Download and obtain the app installation package using any of the following three methods: ...
  • Page 310 Step 3 Hold down the SW button on the ECC800-Pro for less than 3s to enable the WiFi function.  The initial password is Changeme after the WiFi function is enabled. The password is valid only after you hold down the button for the first time to enable the WiFi function.
  • Page 311: How Do I Ensure That Device Positions In The Plan View Are Consistent With Actual Positions

     It is recommended that you use different user names to log in to both the ECC800-Pro WebUI and app at the same time. If you use the same user name to log in to the WebUI and app at the same time, either of them will be forcibly logged out.
  • Page 312: How Can I View Real-Time Data

    8.2.4 How Can I View Real-time Data? Procedure Step 1 Log in to the ECC800-Pro mobile phone or pad app as an administrator. Step 2 To view the smart module data center layout, tap Home. Step 3 To view active alarms and historical alarms, choose Alarms > Active Alarms or Alarms >...
  • Page 313: How Can I Synchronize Device Parameters

    After a device is replaced, you can synchronize the parameters of the original device to the new device. Procedure Step 1 Log in to the ECC800-Pro mobile phone or pad app as an administrator. Step 2 Choose Parameter Sync. Step 3 Select the source device and target device.
  • Page 314 Step 1 If you have obtained the user name and password used in the previous successful login, perform the following operations: Check that the mobile phone or pad connects to the ECC800-Pro over WiFi properly. Use the obtained user name and password to log in to the app and exit.
  • Page 315: Plc Function

    PLC Function 9.1 Linkage Control Introduction The ECC800-Pro provides the linkage control function. You can set logic rules and control the DO output signal by collecting the signal value. You can select signals (such as the AI/DI device status signals) and perform logic operations such as AND, OR, NOT, GREATER THAN, LESS THAN, DELAY, and FILTER.
  • Page 316: Linkage Control Configuration Examples

     The ECC800-Pro supports fire control linkage and high temperature linkage control. For example, the ECC800-Pro can implement fire linkage by detecting fire alarms through the fire controller and opening the skylight, opening the aisle door, and shutting down the smart cooling product based on the alarm status.
  • Page 317 When adding high temperature linkage control, ensure that all smart cooling products fail to communicate with the ECC800-Pro. If smart cooling products communicate properly, cooling can be automatically implemented when the smart cooling products are at high temperature. Opening the skylights may cause the cooling effect to fail.
  • Page 318 You can use the configuration file import and export function to export the linkage control linkage rules configured for an ECC800-Pro to a local PC and then import the rules to another ECC800-Pro. This function achieves quick configuration for the linkage control.
  • Page 319: Acronyms And Abbreviations

    Advanced encryption standard analog input application battery control I/O board component object model direct current Data Encryption Standard digital input digital output Energy Control Center equipment serial number Ethernet Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 320 Media Access Control message digest algorithm network address translation NetEco iManager NetEco data center infrastructure management system negative temperature coefficient power distribution unit power over Ethernet power supply unit power usage effectiveness Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.
  • Page 321 Simple Mail Transfer Protocol SNMP Simple Network Management Protocol Secure Sockets Layer SSID service set identifier Transport Layer Security uninterruptible power system universal serial bus video cloud node WiFi wireless fidelity WiFi protected setup Issue 06 (2020-04-22) Copyright © Huawei Technologies Co., Ltd.

This manual is also suitable for:

Ecc800-pro

Table of Contents