Cisco ONS 15454 M6 Installation Manual
Hide thumbs Also See for ONS 15454 M6:

Quick Links

Installing the ONS 15454 M6 Shelf
This chapter explains how to install the ONS 15454 M6 shelf.
Note
Unless otherwise specified, the ECU module refers to the ECU, ECU2, ECU-S, and ECU-60V units. For
details about the various ECU modules, see the
ANSI Rack Installation, on page 2
ETSI Rack Installation, on page 4
Air Deflector, on page 6
Air Plenum, on page 6
Air Plenum Rack and Cabinet Compatibility, on page 8
NTP-G344 Install the Air Plenum in ONS 15454 M6 Shelf, on page 9
Air Flow Performance of ONS 15454 M6, on page 23
NTP-G252 Install the ONS 15454 M6 Shelf , on page 24
Front Door, on page 50
NTP-G258 Install the Standard Door of the ONS 15454 M6 Shelf , on page 53
NTP-G259 Open and Remove the Standard Door of the ONS 15454 M6 Shelf , on page 57
NTP-G327 Install the Deep-Front Panel of the ONS 15454 M6 Shelf, on page 62
NTP-G329 Remove the Deep-Front Panel of the ONS 15454 M6 Shelf , on page 69
External Connection Units, on page 72
NTP-G253 Install the ECU or ECU-S Module, on page 79
NTP-L68 Upgrading to ONS 15454 M6 ECU60-S Module, on page 82
Power Modules, on page 82
NTP-G524 Install the Power Modules in the ONS 15454 M6 Shelf , on page 85
LCD Unit, on page 96
NTP-G255 Install the LCD Module in the ONS 15454 M6 Shelf, on page 96
Power and Ground Description, on page 98
NTP-G256 Install Power and Ground to the ONS 15454 M6 Shelf , on page 100
Fan-Tray Assembly , on page 117
NTP-G257 Install the Fan-Tray Assembly in the ONS 15454 M6 Shelf, on page 118
Cable Routing and Management, on page 120
NTP-G290 Install the Cable and Fiber Modules, on page 121
External Connection Units, on page
Installing the ONS 15454 M6 Shelf
72.
1
Table of Contents
loading

Summary of Contents for Cisco ONS 15454 M6

  • Page 1 NTP-G258 Install the Standard Door of the ONS 15454 M6 Shelf , on page 53 • NTP-G259 Open and Remove the Standard Door of the ONS 15454 M6 Shelf , on page 57 • NTP-G327 Install the Deep-Front Panel of the ONS 15454 M6 Shelf, on page 62 •...
  • Page 2 ANSI Rack Installation The ONS 15454 M6 shelf is mounted on a 19-inch (482.6-mm) or 23-inch (584.2-mm) equipment rack. Make sure that the correct type of 19-inch ANSI rack is used for mounting the ONS 15454 M6 shelf as shown in Figure 1.
  • Page 3: Reversible Mounting Bracket

    Mounting a Single Shelf Mounting the ONS 15454 M6 shelf on a rack requires a minimum of 10.4-inches (265 mm) of vertical rack space. To ensure that the mounting is secure, use two to three #12-24 mounting screws for each side of the shelf.
  • Page 4: Mounting Multiple Nodes

    ONS 15454 M6 shelves and a fuse and alarm panel. However, unequal flange racks are limited to six ONS 15454 M6 shelves and a fuse and alarm panel, or seven ONS 15454 M6 shelves using a fuse and alarm panel from an adjacent rack.
  • Page 5: Mounting A Single Node

    In an ETSI rack, the brackets are mounted only in the front position. If the ONS 15454 M6 shelf is fully loaded, then two people should install it. However, it is possible for one person to install an empty shelf. The shelf should be empty for easier lifting. For information on the ONS 15454 M6 shelf weight, see the Dimensions.
  • Page 6: Air Deflector

    M6 shelves. Air Deflector An air deflector is a sheet-metal part that is mounted on the ONS 15454 M6 shelf to orient the air flow in a specific direction. The air deflectors can be mounted in different positions to control the air flow: •...
  • Page 7 Figure 3: Air flow within the air plenum in the cabinet The following two figures shows the dimensions of the air plenum relative to the cabinet or rack. Figure 4: Dimension of Cisco ONS 15454 M6 chassis relative to the air plenum Installing the ONS 15454 M6 Shelf...
  • Page 8 Installing the ONS 15454 M6 Shelf Air Plenum Rack and Cabinet Compatibility Figure 5: Dimension on Cisco ONS 15454 M6 relative to the air plenum Air Plenum Rack and Cabinet Compatibility The table shows the compatibility of air plenum with the ANSI and ETSI racks and cabinets. The chassis can be installed with brackets in front position only.
  • Page 9 Installing the ONS 15454 M6 Shelf NTP-G344 Install the Air Plenum in ONS 15454 M6 Shelf Figure 6: Minimum rear opening for ANSI 19-inch and ETSI configuration NTP-G344 Install the Air Plenum in ONS 15454 M6 Shelf Purpose This procedure installs the air plenum to orient the air flow from front-to- back direction in the ONS 15454 M6 shelf.
  • Page 10 For nominal voltage of -60 VDC, the input voltage range is from -40 to -72 VDC. Note Use only the fastening hardware provided with the ONS 15454 M6 to prevent loosening, deterioration, and electromechanical corrosion of the hardware and joined material.
  • Page 11 Installing the ONS 15454 M6 Shelf DLP-G766 Install Air Plenum for ONS 15454 M6 Shelf in ANSI 19-inch Cabinet Tools/Equipment • #2 Phillips Dynamometric screwdriver • Medium slot-head screwdriver • Small slot-head screwdriver • Screws: #12-24 x 0.50 pan-head Phillips screws (8) •...
  • Page 12 Installing the ONS 15454 M6 Shelf DLP-G766 Install Air Plenum for ONS 15454 M6 Shelf in ANSI 19-inch Cabinet Figure 8: Installing the left vertical air plenum Step 4 Install the vertical air plenum to the right of the horizontal air plenum. Follow step 3a to step 3c.
  • Page 13 Install the 19-inch standard brackets on both sides of the chassis in the front position. See DLP-G560 Mounting the Reversible Brackets on the ONS 15454 M6 Shelf for ANSI Rack Configuration, on page Step 7 Check the length between the top and bottom horizontal air plenums where the chassis will be installed. The length must be not less than 10.5 inches (267 mm).
  • Page 14 DLP-G767 Install Air Plenum in ONS 15454 M6 Shelf for ANSI 23-inch Configuration Purpose This task installs the air plenum for the ONS 15454 M6 shelf in the ANSI 23-inch cabinet or rack configuration. Tools/Equipment • #2 Phillips Dynamometric screwdriver •...
  • Page 15 Installing the ONS 15454 M6 Shelf DLP-G767 Install Air Plenum in ONS 15454 M6 Shelf for ANSI 23-inch Configuration Figure 13: Installing the bottom horizontal air plenum in the ANSI 23-inch configuration Step 5 Install the vertical air plenum to the left of the horizontal air plenum: a) Insert the vertical air plenum in the free space between the horizontal air plenum and cabinet.
  • Page 16 Install ANSI 23-inch standard brackets on both sides of the chassis in front position. See DLP-G562 Mounting the Brackets on the ONS 15454 M6 Shelf for ETSI Rack Configuration, on page Step 10 Check the length between the top and bottom horizontal air plenums where the chassis will be installed. The length must be not less than 10.5 inches (267 mm).
  • Page 17 Step 12 Return to your originating procedure (NTP). DLP-G768 Install Pre-assembled Air Plenums in ANSI 23-inch Configuration This task installs pre-assembled air plenums for the ONS 15454 M6 shelf in the ANSI Purpose 23-inch configuration. • #2 Phillips Dynamometric screwdriver Tools/Equipment •...
  • Page 18 Installing the ONS 15454 M6 Shelf DLP-G768 Install Pre-assembled Air Plenums in ANSI 23-inch Configuration Step 6 Install the vertical air plenum to the right of the horizontal air plenum. Follow step 4. Step 7 Install the horizontal air plenum above the vertical air plenums. Follow step 4.
  • Page 19 Return to your originating procedure (NTP). DLP-G769 Install Air Plenum for ONS 15454 M6 Shelf in ETSI Configuration This task installs the air plenum for the ONS 15454 M6 shelf in the ETSI configuration. Purpose Installing the ONS 15454 M6 Shelf...
  • Page 20 Installing the ONS 15454 M6 Shelf DLP-G769 Install Air Plenum for ONS 15454 M6 Shelf in ETSI Configuration Tools/Equipment • #2 Phillips Dynamometric screwdriver • Medium slot-head screwdriver • Small slot-head screwdriver • Screws: M6.0 x 20 pan-head Phillips screws (8) •...
  • Page 21 Installing the ONS 15454 M6 Shelf DLP-G769 Install Air Plenum for ONS 15454 M6 Shelf in ETSI Configuration Figure 21: Installing the horizontal air plenum in the ETSI configuration Step 5 Install the vertical air plenum to the left of the horizontal air plenum: a) Insert the vertical plenum in the free space between the horizontal plenum and cabinet.
  • Page 22 Install the standard brackets on both sides of the chassis in front position. See DLP-G562 Mounting the Brackets on the ONS 15454 M6 Shelf for ETSI Rack Configuration, on page Step 10 Check the length between the top and bottom horizontal air plenums where the chassis will be installed. The length must be not less than 10.5 inches (267 mm).
  • Page 23 Air Flow Performance of ONS 15454 M6 Step 11 Install the ONS 15454 M6 empty chassis between the horizontal plenums. Figure 25: Installing the ONS 15454 M6 chassis below the horizontal air plenum Step 12 Return to your originating procedure (NTP).
  • Page 24 Installing the ONS 15454 M6 Shelf NTP-G252 Install the ONS 15454 M6 Shelf Case Deflector Configuration Bulk Chassis Flow, CFM Side to Side No deflectors 215.3 295.6 ETSI Front to Rear Inlet and Outlet 97.7 135.8 ETSI Front to Side Only Inlet 187.7...
  • Page 25 To prevent airflow restriction, allow clearance around the ventilation openings to be at least:1 inch (25.4 mm) Statement 1076 Note Make sure that the correct type of 19-inch ANSI rack is used for mounting the ONS 15454 M6 shelf as shown Figure Warning To comply with EN50121-4:2006 - Railway applications, Electromagnetic compatibility, a shielded cable must be used to connect to the EMS port.
  • Page 26 Note During installation, do not use the door to handle the chassis. Note Remove the door from the ONS 15454 M6 shelf and reinstall it after installing all the other modules. Figure 26: Handling the Chassis During Installation Procedure Step 1 Complete the necessary task as applicable: •...
  • Page 27 DLP-G561 Mounting the Bracket with Air Deflectors (Front-to-Back) on the ONS 15454 M6 Shelf for ANSI Rack Configuration, on page 32 • DLP-G562 Mounting the Brackets on the ONS 15454 M6 Shelf for ETSI Rack Configuration, on page • DLP-G563 Mounting the Air Deflectors (Front-to-Front) on the ONS 15454 M6 Shelf for ETSI Rack Configuration, on page 36 •...
  • Page 28 Installing the ONS 15454 M6 Shelf DLP-G675 Verify the ONS 15454 M6 Shelf for DC Power Module Installation Figure 27: AC Power Module Installation Rear Side of the ONS 15454 M6 Shelf Step 2 Loosen the screw and move it to the left position (towards the AC silk-screen text).
  • Page 29 As needed Required/As Needed Onsite/Remote Onsite Security Level None Caution Use only the fastening hardware provided with the ONS 15454 M6 to prevent loosening, deterioration, and electromechanical corrosion of the hardware and joined material. Installing the ONS 15454 M6 Shelf...
  • Page 30 DLP-G560 Mounting the Reversible Brackets on the ONS 15454 M6 Shelf for ANSI Rack Configuration Caution When mounting the ONS 15454 M6 in a frame with a nonconductive coating (such as paint, lacquer, or enamel) either use the thread-forming screws provided with the ONS 15454 M6 ship kit, or remove the coating from the threads to ensure electrical continuity.
  • Page 31 DLP-G560 Mounting the Reversible Brackets on the ONS 15454 M6 Shelf for ANSI Rack Configuration Figure 29: Mounting the Brackets on the ONS 15454 M6 shelf for a 19-inch (482.6-mm) ANSI Configuration The following figure shows mounting the brackets for a 23-inch (584.2-mm) configuration.
  • Page 32 Installing the ONS 15454 M6 Shelf DLP-G561 Mounting the Bracket with Air Deflectors (Front-to-Back) on the ONS 15454 M6 Shelf for ANSI Rack Configuration Step 5 Return to your originating procedure (NTP). DLP-G561 Mounting the Bracket with Air Deflectors (Front-to-Back) on the...
  • Page 33 Installing the ONS 15454 M6 Shelf DLP-G561 Mounting the Bracket with Air Deflectors (Front-to-Back) on the ONS 15454 M6 Shelf for ANSI Rack Configuration Step 6 Insert the screws and tighten them to a torque value of 11.5 in-lb (1.3 N-m).
  • Page 34 Installing the ONS 15454 M6 Shelf DLP-G562 Mounting the Brackets on the ONS 15454 M6 Shelf for ETSI Rack Configuration Figure 32: Mounting the Brackets with Air Deflectors (Front-to-Back) on the ONS 15454 M6 Shelf for ANSI Rack Configuration Step 13 Return to your originating procedure (NTP).
  • Page 35 Caution When mounting the ONS 15454 M6 in a frame with a nonconductive coating (such as paint, lacquer, or enamel) either use the thread-forming screws provided with the ONS 15454 M6 ship kit, or remove the coating from the threads to ensure electrical continuity.
  • Page 36 Align the screw holes on the right front air deflector with the screw holes on the right side of the chassis. Figure 34: Mounting the Air Deflectors (Front-to-Front) on the ONS 15454 M6 Shelf for ETSI Rack Configuration Step 3 Insert the screws and tighten them to a torque value of 11.5 in-lb (1.3 N-m).
  • Page 37 Installing the ONS 15454 M6 Shelf DLP-G564 Mounting the Bracket with Air Deflectors (Front-to-Back) on the ONS 15454 M6 Shelf for ETSI Rack Configuration • 100G-LC-C, 10x10G-LC, or CFP-LC • EDRA1-26, EDRA1-35, EDRA2-26, or EDRA2-35 Use the standard brackets directly to mount the ONS 15454 M6 shelf.
  • Page 38 Installing the ONS 15454 M6 Shelf DLP-G564 Mounting the Bracket with Air Deflectors (Front-to-Back) on the ONS 15454 M6 Shelf for ETSI Rack Configuration Do not mount the left back deflector (exhaust air deflector), if these cards are to be installed in the ONS 15454 M6 shelf: •...
  • Page 39 Installing the ONS 15454 M6 Shelf DLP-G565 Mounting the Bracket with Air Deflectors (Front-to-Top) on the ONS 15454 M6 Shelf for ETSI Rack Configuration Figure 36: Mounting the Bracket with Air Deflectors (Front-to-Back) on the ONS 15454 M6 Shelf for ETSI Rack Configuration Step 13 Return to your originating procedure (NTP).
  • Page 40 Installing the ONS 15454 M6 Shelf DLP-G565 Mounting the Bracket with Air Deflectors (Front-to-Top) on the ONS 15454 M6 Shelf for ETSI Rack Configuration Caution Use only the fastening hardware provided with the ONS 15454 M6 to prevent loosening, deterioration, and electromechanical corrosion of the hardware and joined material.
  • Page 41 Mounting the Bracket with Air Deflectors (Front-to-Top) on the ONS 15454 M6 Shelf for ETSI Rack Configuration- Front Position, on page Figure 37: Mounting the Bracket with Air Deflectors (Front-to-Top) on the ONS 15454 M6 Shelf for ETSI Rack Configuration- Front Position Step 12...
  • Page 42 Step 23 Insert M4 flat-head screws and tighten them to a torque value of 11.5 in-lb (1.3 N-m). Figure 38: Mounting the Bracket with Air Deflectors (Front-to-Top) on the ONS 15454 M6 Shelf for ETSI Rack Configuration - Middle Position Step 24 Return to your originating procedure.
  • Page 43 Installing the ONS 15454 M6 Shelf DLP-G821 Mounting the Bracket with Air Deflectors (Front-to-Side) on the ONS 15454 M6 Shelf for ETSI Rack Configuration DLP-G821 Mounting the Bracket with Air Deflectors (Front-to-Side) on the ONS 15454 M6 Shelf for ETSI Rack Configuration...
  • Page 44 Installing the ONS 15454 M6 Shelf DLP-G821 Mounting the Bracket with Air Deflectors (Front-to-Side) on the ONS 15454 M6 Shelf for ETSI Rack Configuration Figure 39: Mounting the Bracket with Air Deflectors (Front-to-Side) on the ONS 15454 M6 Shelf for ETSI Rack Configuration Step 2 Align the screw holes on the right front air deflector with the screw holes on the right side of the chassis.
  • Page 45 Installing the ONS 15454 M6 Shelf DLP-G566 Mount the ONS 15454 M6 Shelf on a Rack (One Person) Figure 40: Mounting the Bracket with Air Deflectors (Front-to-Side) on the ONS 15454 M6 Shelf for ETSI Rack Configuration - Middle Position...
  • Page 46 Note The ONS 15454 M6 requires a minimum of six RU of vertical rack space. To ensure that the mounting is secure, use two to three M6 mounting screws on each side of the shelf. A shelf should be mounted at the bottom of the rack if it is the only unit in the rack.
  • Page 47 The placement of the shelf is dependent on where you want to install the new equipment in the rack. To ensure proper cooling of the ONS 15454 M6 shelf, make sure that the space in front of the air Note flow vents are free of cables, fibers, and mechanical fixtures for fiber and cable management.
  • Page 48 Note The ONS 15454 M6 requires a minimum of six RU of vertical rack space. To ensure that the mounting is secure, use two to three M6 mounting screws on each side of the shelf. A shelf should be mounted at the bottom of the rack if it is the only unit in the rack.
  • Page 49 Note A standard rack can hold six or seven ONS 15454 M6 shelves. When mounting a shelf in a partially filled rack, load the rack from the bottom to the top with the heaviest component at the bottom of the rack. If the rack is provided with stabilizing devices, install the stabilizers before mounting or servicing the unit in the rack.
  • Page 50: Front Door

    Return to your originating procedure (NTP). Front Door The front door of the ONS 15454 M6 provides access to the shelf, fiber-routing tray, fan-tray assembly, and LCD screen. There are two types of front doors that act as protective panels—standard door and deep-front panel. The deep-front panel provides additional space in front of the shelf to accommodate cables that do not fit inside the standard door.
  • Page 51 ONS 15454 M6 shelf provides improved fiber management. If a standard front door was ordered, the ONS 15454 M6 is shipped with a preinstalled standard door. If a deep-front panel was ordered, a temporary front door is preinstalled on the shelf and the deep-front panel is present in a separate package.
  • Page 52 Front Door Figure 45: Laser Warning on the ONS 15454 M6 The following figure shows the label that is placed on top of ONS 15454 M6: Figure 46: ONS 15454 M6 Label Figure 47: ONS 15454 M6 Front Door Label...
  • Page 53 • NTP-G253 Install the ECU or ECU-S Module, on page 79 • NTP-G524 Install the Power Modules in the ONS 15454 M6 Shelf , on page • NTP-G255 Install the LCD Module in the ONS 15454 M6 Shelf, on page •...
  • Page 54 Installing the ONS 15454 M6 Shelf NTP-G258 Install the Standard Door of the ONS 15454 M6 Shelf Figure 48: Installing the Standard Door Step 2 Align the standard door hinges with the chassis hinges. Step 3 Release the hinge pins.
  • Page 55 Installing the ONS 15454 M6 Shelf NTP-G258 Install the Standard Door of the ONS 15454 M6 Shelf Figure 49: Mounting the Mechanical Stop Installing the ONS 15454 M6 Shelf...
  • Page 56 Installing the ONS 15454 M6 Shelf NTP-G258 Install the Standard Door of the ONS 15454 M6 Shelf Figure 50: Retention Feature and Ground Strap Cable Standard Door Step 9 Place the ground strap cable (see Figure 50: Retention Feature and Ground Strap Cable—Standard Door, on page 56) on the door and the chassis and tighten the nuts to a torque value of 11.5 in-lb (1.3 N-m) to lock the...
  • Page 57 Stop. You have completed this procedure. NTP-G259 Open and Remove the Standard Door of the ONS 15454 M6 Shelf Purpose This procedure opens and removes the standard door of the ONS 15454 M6 shelf. #2 Phillips Dynamometric screwdriver Tools/Equipment •...
  • Page 58 Note The ONS 15454 M6 shelf has an ESD plug input and is shipped with an ESD wrist strap. The ESD plug input is located on the outside of the shelf on the left side. It is labeled “ESD” on the top and bottom. Always wear an ESD wrist strap and connect the strap to the ESD plug when working on the ONS 15454 M6.
  • Page 59 Installing the ONS 15454 M6 Shelf DLP-G576 Open the Standard Door of the ONS 15454 M6 Shelf Figure 52: Opening the Standard Door Step 3 Swing the door open. The retention feature maintains the door in the horizontal position for line card insertion (see the following figure).
  • Page 60 Purpose This task removes the standard door of the ONS 15454 M6 shelf. Tools/Equipment None Prerequisite Procedures DLP-G576 Open the Standard Door of the ONS 15454 M6 Shelf , on page 58 Required/As Needed As needed Onsite/Remote Onsite Security Level...
  • Page 61 Installing the ONS 15454 M6 Shelf DLP-G577 Remove the Standard Door of the ONS 15454 M6 Shelf Figure 54: Removing the ONS 15454 M6 Standard Door Step 3 Loosen the screws and slide the mechanical stop to unlock the door.
  • Page 62 NTP-G327 Install the Deep-Front Panel of the ONS 15454 M6 Shelf Purpose This procedure installs the deep-front panel of the ONS 15454 M6 shelf. Tools/Equipment 2 Phillips Dynamometric screwdriver Socket (6/32 standard) and socket wrench to tighten or loosen the ground nut...
  • Page 63 NTP-G259 Open and Remove the Standard Door of the ONS 15454 M6 Shelf , on page 57 • DLP-G576 Open the Standard Door of the ONS 15454 M6 Shelf , on page • Connect the chassis to the office ground. For detailed instructions on how to ground the chassis, see the...
  • Page 64 Installing the ONS 15454 M6 Shelf NTP-G327 Install the Deep-Front Panel of the ONS 15454 M6 Shelf c) Route the other end of the ground strap cable outside the shelf at an angle of 180 degrees towards the left. Figure 56: Insert the lug Step 2 Loosen the deep-front panel screws and slide them outwards using the plastic tabs.
  • Page 65 Installing the ONS 15454 M6 Shelf NTP-G327 Install the Deep-Front Panel of the ONS 15454 M6 Shelf Figure 57: Placing Deep-Front Panel and Shelf in line Step 4 Align the deep-front panel with the shelf by performing these sub-steps at the same time.
  • Page 66 Installing the ONS 15454 M6 Shelf NTP-G327 Install the Deep-Front Panel of the ONS 15454 M6 Shelf Figure 58: Aligning the Deep-Front Panel Pins and Shelf hinges The following figure shows the deep-front panel aligned with the shelf. Installing the ONS 15454 M6 Shelf...
  • Page 67 Installing the ONS 15454 M6 Shelf NTP-G327 Install the Deep-Front Panel of the ONS 15454 M6 Shelf Figure 59: Aligning the Deep-Front Panel and Shelf Step 5 Slide the deep-front panel screws inwards using the plastic tabs to engage the retention features and the pins with the shelf notches and hinges (see the following figure).
  • Page 68 Installing the ONS 15454 M6 Shelf NTP-G327 Install the Deep-Front Panel of the ONS 15454 M6 Shelf Figure 60: Engaging the Deep-Front Panel and Shelf Step 6 Lock the deep-front panel by tightening the screws to a torque value of 6.5 in-lb (0.75 N-m).
  • Page 69 NTP-G329 Remove the Deep-Front Panel of the ONS 15454 M6 Shelf Purpose This procedure removes the deep-front panel of the ONS 15454 M6 system. Tools/Equipment • #2 Phillips Dynamometric screwdriver • Socket (6/32 standard) and socket wrench to tighten or loosen the ground Prerequisite Procedures •...
  • Page 70 Installing the ONS 15454 M6 Shelf NTP-G329 Remove the Deep-Front Panel of the ONS 15454 M6 Shelf Figure 62: Removing the end of the ground strap cable Step 2 Loosen the deep-front panel screws and slide them outwards using the plastic tabs to open the deep-front panel as shown in the following figure.
  • Page 71 Installing the ONS 15454 M6 Shelf NTP-G329 Remove the Deep-Front Panel of the ONS 15454 M6 Shelf Figure 64: Moving the deep-front panel away Step 4 Remove the ground strap cable from the shelf (see the following figure). Figure 65: Removing the ground strap cable a) Loosen the ground nut on the shelf.
  • Page 72 Stop. You have completed this procedure. External Connection Units The external connection unit (ECU) is a replaceable module placed on top of the ONS 15454 M6 shelf. The ECU module discovers and manages the inventory of the external shelf units. It also handles the multishelf management connections and timing synchronizations.
  • Page 73 ECU2 The ECU2 is an advanced version of the ECU. The ECU2 is hardware-ready to support IEEE1588v2 PTP, time-of-day (ToD), and pulse-per-second (PPS) inputs. The external connections of ONS 15454 M6 present on the ECU2 are: • 12 remote inventory standard USB connections •...
  • Page 74 Figure 69: Connectors on ECU-60V Faceplate ECU-S ECU-S is a new type of ECU introduced in Release 10.5.2 for ONS 15454 M6. The ECU-S module also discovers and manages the inventory of the external shelf units. It also handles the multishelf management connections and timing synchronizations.
  • Page 75 • 1 SCSI with 26 poles for digital I/O signals (on the right-side connector) ECU60-S ECU60-S is a new type of ECU-S introduced for the ONS 15454 M6 when the shelf is powered at –60 VDC nominal input voltage. The ECU60-S module available for the ONS 15454 M6 shelf is 15454 M6-ECU60-S=.
  • Page 76 MSM ports Craft terminal connection The ONS 15454 M6 ECU60-S supports IEEE1588v2 PTP, time-of-day (ToD), and pulse-per-second (PPS) inputs. The IMPROPRMVL alarm is raised in CTC when the ECU60-S is removed from the ONS 15454 M6 shelf. Note When ONS 15454 M6 is pre-provisioned, or plugged in without the ECU60-S unit, by default, CTC uses the ECU module with the 12 USB 2.0 ports.
  • Page 77: Alarm Connectors

    Alarm Cut Off (ACO) signal and Digital Input/Output (D-I/O) signals. The right alarm connector is used for Digital Input/Output (D-I/O) signals. To export alarms from the ONS 15454 M6 shelf to a third party device, use the output pins of either the right alarm connector or the left alarm connector.
  • Page 78: Timing Connections

    USBP_A_1 and Port 1 on the right side of the NCS 2006 ECU-S module is represented as USBP_B_ 1. The left side of the ONS 15454 M6 2006 ECU-S module is Side A and the right side of the ONS 15454 M6 2006 ECU-S module is Side B.
  • Page 79 NTP-G252 Install the ONS 15454 M6 Shelf , on page • NTP-G259 Open and Remove the Standard Door of the ONS 15454 M6 Shelf , on page • Connect the chassis to the office ground. For detailed instructions on how...
  • Page 80 Electrostatic Discharge and Grounding Guide for Cisco CPT and Cisco ONS Platforms. Note If the USB device connected to the ECU module is not detected when the ONS 15454 M6 shelf assembly is powered on, plug out (remove) the ECU module and insert it again. Procedure Step 1 Insert the ECU module in the central slot of the chassis (see the following figure).
  • Page 81 NTP-G253 Install the ECU or ECU-S Module Figure 72: Installing the ECU module The following figure shows the ECU module installed in the ONS 15454 M6 shelf. Figure 73: ONS 15454 M6 Shelf with ECU module Installed Stop. You have completed this procedure.
  • Page 82: Ac Power Module

    Do not replace the 15454-M6-DC20, or 15454-M6-DC40 power modules with the 15454-M6-DC V03 power module if the ONS 15454 M6 shelf is consuming more than 960 W of power. Refer to table A-4 to ascertain the power consumption of the shelf.
  • Page 83: Dc Power Module

    However, during regular operation of the node, the ONS 15454 M6 shelf must have either the 15454-M6-AC or 15454-M6-AC2 power module, but not both. See...
  • Page 84 Changing the DC Power Module It is possible to change the power modules without powering down the ONS 15454 M6 system. While changing the power modules, ensure that only one power module is replaced at a time and the other power module continues to supply power to the shelf.
  • Page 85 Procedure Step 1 Complete the necessary task as applicable: • DLP-G569 Install the AC Power Module in the ONS 15454 M6 Shelf, on page 85 • DLP-G757 Replacing 15454-M6-AC With 15454-M6-AC2 Power module, on page 88 • DLP-G758 Replacing 15454-M6-AC2 With 15454-M6-AC Power module, on page 89 •...
  • Page 86 Caution The node can temporarily work with both 15454-M6-AC and 15454-M6-AC2 power module units installed on the ONS 15454 M6 shelf. However, during regular operation, the shelf must have either the 15454-M6-AC or 15454-M6-AC2 power module, but not both. Insert the AC power module in Slot A or Slot B, or both (see the following figure).
  • Page 87 For redundant power supplies, two AC power modul5es can be installed in Slot A and Slot B. Note However, only one power module can sustain the functioning of the entire ONS 15454 M6 system. In that case, insert a power filler module in the empty slot (for example, see...
  • Page 88 Caution Always use the supplied ESD wristband when working with a powered ONS 15454 M6. For detailed instructions on how to wear the ESD wristband, see the Electrostatic Discharge and Grounding Guide for Cisco CPT and Cisco ONS Platforms.
  • Page 89 100. Note While replacing power modules, when the ONS 15454 M6 chassis is in the mixed power mode (with both 15454-M6-AC and 15454-M6-AC2 power modules installed), do not provision or install any line cards. Card provisioning and installation must be done only after both the slots have the same type of power modules.
  • Page 90 DLP-G570 Install the DC Power Module in the ONS 15454 M6 Shelf Caution Always use the supplied ESD wristband when working with a powered ONS 15454 M6. For detailed instructions on how to wear the ESD wristband, see the Electrostatic Discharge and Grounding Guide for Cisco CPT and Cisco ONS Platforms.
  • Page 91 Installing the ONS 15454 M6 Shelf DLP-G570 Install the DC Power Module in the ONS 15454 M6 Shelf Caution While changing the power modules from 15454-M6-DC20 to 15454-M6-DC and vice-versa, the ONS 15454 M6 shelf can temporarily work with both 15454-M6-DC and 15454-M6-DC20 power modules installed.
  • Page 92 For redundant power supplies, two DC power modules can be installed in Slot A and Slot B. However, Note only one power module can sustain the functioning of the entire ONS 15454 M6 system. In that case, insert a power filler module in the empty slot (see the following figure).
  • Page 93 Figure 78: Installing a Power Filler Module Step 4 Return to your originating procedure (NTP). When the ONS 15454 M6 shelf is powered at –60 VDC (nominal), only the TNC, OPT-AMP-C, Note OPT-AMP-17-C, OPT-EDFA-17, and OPT-EDFA-24 cards, and the 15454-M6-ECU-60 can be installed.
  • Page 94 The 15454-M6-DC40 power module uses 15454-M6-DCCBL2-L= and 15454-M6-DCCBL2-R= cables. Note Do not replace the 15454-M6-DC with the 15454-M6-DC20 power module if the ONS 15454 M6 shelf is consuming more than 960 W of power. Refer to Power Calculation to ascertain the power consumption of the shelf.
  • Page 95 Caution Always use the supplied ESD wristband when working with a powered ONS 15454 M6. For detailed instructions on how to wear the ESD wristband, see the Electrostatic Discharge and Grounding Guide for Cisco CPT and...
  • Page 96 There are three alarm LEDs (CRIT, MAJ, and MIN) on the LCD unit that indicate whether a critical, major, or minor alarm is present anywhere on the ONS 15454 M6 shelf. The shelf controller card controls the conditions that result in triggering the LEDs. The LEDs can be overwritten by the shelf controller card (TNC, TNCE, TSC, or TSCE) in all the three states (OFF/red/green).
  • Page 97 Installing the ONS 15454 M6 Shelf NTP-G255 Install the LCD Module in the ONS 15454 M6 Shelf Required/As Needed Required Onsite/Remote Onsite Security Level None Note If the LCD unit is removed from the shelf, wait for at least 5 seconds before plugging it back into the shelf.
  • Page 98: Power And Ground Description

    For redundant AC power feeds, install both the AC power modules and use the two power cables (right and left cables) shipped with the ONS 15454 M6 and one ground cable. For an AC power supply, the fuse rating must not exceed 10A, 15A, or 20A. For North America, the branch circuit protection must be rated 20A. The overcurrent/short circuit protection must be in accordance with local and national electrical codes.
  • Page 99 DC power module. For redundant DC power feeds, install both the DC power modules and use the two power cables shipped with the ONS 15454 M6 and one ground cable. For a DC power supply, the fuse rating must not exceed 40A.
  • Page 100 • Two-hole grounding lug, shipped with the ONS 15454 M6 Prerequisite Procedures • NTP-G524 Install the Power Modules in the ONS 15454 M6 Shelf , on page • Connect the chassis to the office ground. For detailed instructions on how to ground the chassis, see the...
  • Page 101 Installing the ONS 15454 M6 Shelf NTP-G256 Install Power and Ground to the ONS 15454 M6 Shelf Warning Blank faceplates (filler panels) serve three important functions: they prevent exposure to hazardous voltages and currents inside the chassis; they contain electromagnetic interference (EMI) that might disrupt other equipment;...
  • Page 102 Statement 1028 Caution Always use the supplied ESD wristband when working with a powered ONS 15454 M6. For detailed instructions on how to wear the ESD wristband, see the Electrostatic Discharge and Grounding Guide for Cisco CPT and Cisco ONS Platforms.
  • Page 103 DLP-G571 Connect Office Power (AC) to the ONS 15454 M6 Shelf Step 3 Connect the office ground to the ONS 15454 M6 shelf. For detailed instructions on grounding, see the Electrostatic Discharge and Grounding Guide for Cisco CPT and Cisco ONS Platforms.
  • Page 104 Procedure Step 1 Verify that the AC power module is installed in Slot A or Slot B (or both) of the ONS 15454 M6. Step 2 Attach the AC power cable to the cable connector in the AC power module (see the following figure).
  • Page 105 Installing the ONS 15454 M6 Shelf DLP-G571 Connect Office Power (AC) to the ONS 15454 M6 Shelf Figure 81: Connecting Office Power AC Power Modules Step 3 Close the cable clip to secure the power cable (see the following figure).
  • Page 106 Installing the ONS 15454 M6 Shelf DLP-G571 Connect Office Power (AC) to the ONS 15454 M6 Shelf Figure 83: Power Cable Exit Step 4 Connect the power cable to the fuse panel or power source. The voltage rating value for AC power ranges between 100 VAC to 240 VAC depending on the Note standards in various countries.
  • Page 107 Installing the ONS 15454 M6 Shelf DLP-G572 Connect Office Power (DC) to the ONS 15454 M6 Shelf (ANSI Only) Cable AC power cable - ARG left exit 15454-M-CBL-LARG= AC power cable - ARG right exit 15454-M-CBL-RARG= AC power cable - AUS left exit...
  • Page 108 Statement 1075 Caution The ONS 15454 M6 relies on the protective devices in the building installation to protect against short circuit, overcurrent, and ground faults. Ensure that the protective devices are properly rated and comply with national and local codes.
  • Page 109 Crimp the lugs onto the ends of all the power leads. Step 7 Verify that the DC power module is installed in Slot A or Slot B (or both) of the ONS 15454 M6 shelf. Step 8 Remove the terminal block protective covers from the DC power modules (see the following figure).
  • Page 110 Installing the ONS 15454 M6 Shelf DLP-G572 Connect Office Power (DC) to the ONS 15454 M6 Shelf (ANSI Only) Figure 85: Connecting Office Power DC Power Modules (ANSI Only) Step 10 Insert the lugs as shown in the above figure. The top cable is for RET and the bottom cable is for –48 V/–60 Step 11 Insert the lock washers and nuts to the terminal block.
  • Page 111 Installing the ONS 15454 M6 Shelf DLP-G573 Connect Office Power (DC) to the ONS 15454 M6 Shelf (ETSI Only) Figure 86: Connecting Office Power DC Power Modules (ANSI Only) Caution Before you make any crimp connections, coat all bare conductors (battery, battery return, and frame ground) with an appropriate antioxidant compound.
  • Page 112 Network Time Protocol/Simple Network Time Protocol (NTP/SNTP) server, you must reset the ONS 15454 M6 clock. After powering down, the date defaults to January 1, 1970, 00:04:15. To reset the clock, see the “NTP-G24 Setting Up Node Identification Information” procedure in the Cisco ONS 15454 DWDM Control Card and Node Configuration Guide.
  • Page 113 DLP-G573 Connect Office Power (DC) to the ONS 15454 M6 Shelf (ETSI Only) Step 2 Verify that the DC power module is installed in Slot A or Slot B (or both slots) of the ONS 15454 M6. Step 3 Unscrew the screws to a torque value of 4 in-lb (0.45 N-m) to remove the protective covers from the DSUB power connector of the DC power modules (see the following figure).
  • Page 114 Installing the ONS 15454 M6 Shelf DLP-G573 Connect Office Power (DC) to the ONS 15454 M6 Shelf (ETSI Only) Figure 88: Connecting Office Power DC Power Modules (ETSI Only) Note For slot A power module, use the left power cable—15454-M6-DCCBL-LE, and for slot B use the right power cable—15454-M6-DCCBL-RE.
  • Page 115 To power up the node, insert the fuse into the fuse position according to site practice. The fuse rating must not exceed 20A. Step 2 If the ONS 15454 M6 does not power up, check the voltage at the power source using a voltmeter. The voltage should be 100 to 240 VAC +/-10 percent. Step 3 Return to your originating procedure (NTP).
  • Page 116 Installing the ONS 15454 M6 Shelf DLP-G575 Turn On and Verify DC Office Power on the ONS 15454 M6 Shelf DLP-G575 Turn On and Verify DC Office Power on the ONS 15454 M6 Shelf Purpose This task turns on the power and verifies correct power and returns on the ONS 15454 M6 shelf.
  • Page 117: Fan-Tray Assembly

    LED is OFF. When the power line is connected and if there is no TNC, TNCE, TSC, or TSCE card installed in the ONS 15454 M6 shelf, then the LED is OFF. A red LED indicates an alarm in the fan-tray assembly. A green LED indicates that the fan-tray assembly is functioning, the power line is connected, and the power module is functioning properly.
  • Page 118: Fan Speed

    Security Level None Note The 15454-M2-FTA2 is compatible with R9.2.0 and later releases. Caution Do not operate an ONS 15454 M6 without an air filter. For information on the air filter, see NTP-G114 Inspect and Replace the Air Filter. Caution Do not force a fan-tray assembly into place.
  • Page 119 To install the fan-tray assembly, it is not necessary to move any of the fiber-routing facilities. Procedure Step 1 Insert the fan-tray assembly inside the left slot (fan tray slot) of the ONS 15454 M6 chassis (see the following figure). Figure 89: Installing the Fan-Tray Assembly Step 2 Push the fan-tray assembly such that the backplane connector is engaged completely.
  • Page 120: Cable Routing And Management

    Default Module The ONS 15454 M6 chassis is shipped with the fiber module installed. If you need to use CAT5 cables instead of optical fibers, you can replace the fiber module with the cable module.
  • Page 121 Cable and Fiber Routing Cable and fiber routing accommodates all the high-density cards for line card connections in ONS 15454 M6. The exit of the fibers and cables is split into two channels. The line card from slot 1 to 4 exits from the lower right side, and the line card from 5 to 8 exit from the upper right side.
  • Page 122 None Procedure Step 1 Loosen the screws on the fiber module present on the right side of the ONS 15454 M6 assembly. (See the following figure.) Step 2 Loosen the screw present on the air filter locking feature of the ONS 15454 M6 shelf.
  • Page 123 DLP-G654 Install the Cable Module Figure 92: Removing the Fiber module DLP-G654 Install the Cable Module Purpose This procedure installs the cable module in the ONS 15454 M6 system. Tools/Equipment Phillips cross-head PH screwdriver #1 Prerequisite Procedures DLP-G653 Remove the Fiber Module, on page 122...
  • Page 124 Installing the ONS 15454 M6 Shelf DLP-G655 Route and Lock Cables Figure 93: Installing the Cable Module DLP-G655 Route and Lock Cables Purpose This procedure routes and locks the cables on the ONS 15454 M6 system. Tools/Equipment None None Prerequisite Procedures...
  • Page 125 Installing the ONS 15454 M6 Shelf DLP-G655 Route and Lock Cables Figure 94: ECU module Cable Routing Figure 95: Cable Management Step 2 Fix the cables using the tie-wrap provided in the accessories kit. Step 3 To route the optical patch cords or copper cables, do the following as necessary: a) Route the optical patch cords from the line cards through the fiber or cable module as shown in the following figure.
  • Page 126 Installing the ONS 15454 M6 Shelf DLP-G655 Route and Lock Cables Figure 96: Cable Routing b) Remove the front door and connect the copper cables to the SFP or RJ-45 ports of the cards.Do not route the copper cables from the SFPs or RJ-45 ports through the fiber or cable module.
  • Page 127 Installing the ONS 15454 M6 Shelf NTP-G312 Attach Wires to Alarm, Timing, LAN, and Craft Pin Connections in Cisco ONS 15454 M6 Figure 97: Sequence to Remove the Power Module Step 5 Return to your originating procedure (NTP). NTP-G312 Attach Wires to Alarm, Timing, LAN, and Craft Pin...
  • Page 128 Security Level None Caution Always use the supplied ESD wristband when working with a powered ONS 15454 M6. For detailed instructions on how to wear the ESD wristband, see the Electrostatic Discharge and Grounding Guide for Cisco CPT and Cisco ONS Platforms.
  • Page 129 Installing the ONS 15454 M6 Shelf DLP-G295 Install Alarm Wires in ONS 15454 M6 Tools/Equipment Alarm SCSI 26-pin cable Wire-wrap tool for ANSI BITS Screw for the alarm cable Prerequisite Procedures NTP-G253 Install the ECU or ECU-S Module, on page...
  • Page 130 Installing the ONS 15454 M6 Shelf DLP-G295 Install Alarm Wires in ONS 15454 M6 Figure 98: Installing the ECU Alarm Cable Left Exit Option Figure 99: Installing the ECU Alarm Cable Right Exit Option Table 5: SCSI Alarm Cable (15454-M-ALMCBL) and SCSI Alarm Patch Cable (15454-M-AEXPCBL) Connector Details...
  • Page 131 Installing the ONS 15454 M6 Shelf DLP-G295 Install Alarm Wires in ONS 15454 M6 Pin Number Color Code Input Alarms - Right Alarm Connector Input-Output Alarms - Left Connector Black/Orange Input Pair #3 + Critical Audible Alarm + Black/Yellow Input Pair #4 +...
  • Page 132 Installing the ONS 15454 M6 Shelf DLP-G295 Install Alarm Wires in ONS 15454 M6 Pin Number Color Code Input Alarms - Right Alarm Connector Input-Output Alarms - Left Connector Black/Red Input Pair #2 + Major Audible Alarm + — —...
  • Page 133 DLP-G296 Install Timing Wires on ONS 15454 M6 - ANSI DLP-G296 Install Timing Wires on ONS 15454 M6 - ANSI Purpose This task installs the timing cables on the ONS 15454 M6 ECU module for ANSI. Tools/Equipment Wire-wrap tool and 100-ohm wire-wrap cable.
  • Page 134 Step 4 Return to your originating procedure (NTP). DLP-297 Install Timing Wires in ONS 15454 M6 - ETSI This task installs the timing cables on the ONS 15454 M6 ECU module for ETSI. Purpose Tools/Equipment 75-ohm coaxial cable with a DIN-1.0/2.3 miniature coaxial connector. The PID...
  • Page 135 Installing the ONS 15454 M6 Shelf DLP-297 Install Timing Wires in ONS 15454 M6 - ETSI module ETSI BITS connectors. Figure 103: ECU module ETSI BITS Connectors Cabling, on page 135 shows cable routing of ECU module ETSI BITS connectors. The following table lists the pin assignments on the ECU module.
  • Page 136 Slide the coupling sleeve forward to lock the cable connector to the ECU module connector. See diagram3 Figure 2: Cisco ONS 15454 M6 Shelf Dimensions for an ETSI Rack Configuration, on page To unlock the cable connector from the ECU module connector, hold the connector and slide Note the coupling sleeve backward.
  • Page 137 Installing the ONS 15454 M6 Shelf NTP-G308 Connect the ONS 15454 M6 Multishelf Node and the ONS 15454 M6 Subtending Shelves Tools/Equipment Standard CAT-5 Ethernet cable (straight-through for data terminating equipment [DTE] or cross-over for data circuit-terminating equipment [DCE]) or RJ-45 connector Crimping tool for RJ-45 connector 0.51 mm²...
  • Page 138 Plug the other connector to any one of the MSM ports of the ONS 15454 M6 SSCs in the next layer. c) Repeat a and b to connect the remaining MSM ports of the ONS 15454 M6 in the first layer to the next layer.
  • Page 139 Step 1 Complete the necessary task as applicable: • To connect the ONS 15454 M6 as the node controller and ONS 15454 or ONS 15454 M6 as subtending shelves with Catalyst 3560, complete the DLP-G682 Connect the ONS 15454 M6 as the Node Controller in a Mixed Multishelf Configuration Using the Catalyst 3560, on page 140.
  • Page 140 ECU module and MSM ports, see the External Connection Units, on page Note Use the craft terminal port or the EMS port present on the ECU module to connect the ONS 15454 M6 node controller to the LAN. Procedure Step 1...
  • Page 141 Installing the ONS 15454 M6 Shelf DLP-G682 Connect the ONS 15454 M6 as the Node Controller in a Mixed Multishelf Configuration Using the Catalyst 3560 a) Plug one connector into Port 1 of the working Catalyst 3560. b) Plug the other connector into any one of the MSM ports that correspond to the TNC/TNCE/TSC/TSCE card in Slot 1 of the node controller.
  • Page 142 Installing the ONS 15454 M6 Shelf DLP-G682 Connect the ONS 15454 M6 as the Node Controller in a Mixed Multishelf Configuration Using the Catalyst 3560 Figure 105: Mixed Multishelf Configuration with the ONS 15454 M6 as the Node Controller Installing the ONS 15454 M6 Shelf...
  • Page 143 ECU module and MSM ports, see the External Connection Units, on page Note Use the craft terminal port or the EMS port present on the ECU module to connect the ONS 15454 M6 node controller to the LAN. Procedure Step 1...
  • Page 144 TNC/TNCE/TSC/TSCE card in Slot 1. c) Repeat Step 1a and Step 1b to connect the remaining MSM ports on the node controller ONS 15454 M6 shelf to the MSM ports on the subtending ONS 15454 M6 shelf.
  • Page 145 Installing the ONS 15454 M6 Shelf DLP-G683 Connect the ONS 15454 as the Node Controller in a Mixed Multishelf Configuration Figure 106: Mixed Multishelf Configuration without a Catalyst Switch Using ONS 15454 M6 as the Node Controller Step 4 Return to your originating procedure (NTP).
  • Page 146 Plug one connector into Port 23 of the active Catalyst 3560. b) Plug the other connector into Port 23 of the standby Catalyst 3560. Use TCC3 cards in the ONS 15454 node controller while connecting it to the ONS 15454 M6 Note subtending shelves and when there are more than 12 subtending shelves.
  • Page 147 DLP-G683 Connect the ONS 15454 as the Node Controller in a Mixed Multishelf Configuration • • Plug one connector into the MSM port of the subtending ONS 15454 M6 shelf that corresponds to the TNC/TNCE/TSC/TSCE card in Slot 8. • Plug the other connector into Port 2 of the standby Catalyst 3560.
  • Page 148 Installing the ONS 15454 M6 Shelf DLP-G683 Connect the ONS 15454 as the Node Controller in a Mixed Multishelf Configuration Figure 107: Mixed Multishelf Configuration with the ONS 15454 as the Node Controller Step 7 Return to your originating procedure (NTP).
  • Page 149 Procedure Step 1 Complete the necessary task as applicable: • To upgrade the existing ONS 15454 multishelf configuration that has the Cisco Catalyst 2950 switches, complete the DLP-G687 Upgrade the ONS 15454 Multishelf with the Catalyst 2950 Switch Configuration, on page 150.
  • Page 150 Onsite Security Level None Note Use TCC3 cards in ONS 15454 node controller while connecting it to the ONS 15454 M6 subtending shelves and when there are more than 12 subtending shelves. Procedure Step 1 Disconnect the subtending shelf at Port 21 of the active and standby Catalyst 2950: a) Remove the cross-over (CAT 5) LAN cable from Port 21 of the active Catalyst 2950.
  • Page 151 • Plug the other connector into Port 3 of the standby Catalyst 3560. c) Repeat Step 4a and Step 4b to connect additional ONS 15454 M6 subtending shelves in the multishelf configuration using Port 4 to Port 20 on the Catalyst 3560 switches.
  • Page 152 Installing the ONS 15454 M6 Shelf DLP-G687 Upgrade the ONS 15454 Multishelf with the Catalyst 2950 Switch Configuration Figure 108: Upgrading the ONS 15454 Multishelf Configuration Connected to the Catalyst 2950 Step 6 To configure the Catalyst 3560 (extended) using IOS commands, complete the...
  • Page 153 Use TCC3 cards in ONS 15454 node controller while connecting it to the ONS 15454 M6 subtending shelves and when there are more than 12 subtending shelves. Note The CTC in ONS 15454 M6 shelf view displays the three ports of the MS-ISC card, and EMS and circuit ports present on the ECU. Procedure...
  • Page 154 Using a cross-over (CAT-5) LAN cable: • • Plug one connector into the MSM port of the subtending ONS 15454 M6 shelf that corresponds to the TNC/TNCE/TSC/TSCE card in Slot 1. • Plug the other connector into Port 3 of the active Catalyst 3560.
  • Page 155 Installing the ONS 15454 M6 Shelf NTP-G264 Perform the ONS 15454 M6 Shelf Installation Acceptance Test Figure 109: Upgrading the ONS 15454 Multishelf Configuration Using the MS-ISC Card Step 6 To configure the Catalyst 3560 (extended) using IOS commands, complete the...
  • Page 156 Onsite/Remote Onsite Security Level None Procedure Step 1 If you installed an ONS 15454 M6, complete the following table by verifying that each applicable procedure was completed. Table 9: ONS 15454 M6 Shelf ETSI Rack Installation Task Summary Description Completed...
  • Page 157 If a wire or cable is loose, return to the appropriate procedure in this chapter to correct it. Step 2 Return to your originating procedure (NTP). DLP-G579 Measure DC Voltage on the ONS 15454 M6 Shelf Use this task to measure DC voltage on the ONS 15454 M6 shelf. Purpose Voltmeter Tools/Equipment...
  • Page 158 Installing the ONS 15454 M6 Shelf NTP-G317 Connect the ONS 15454 M6 Multishelf Node and the ONS 15454 M6 Subtending Shelves with Simplex Controllers Caution Do not apply power to the shelf until you complete all installation steps. Warning To ensure safety of personnel and equipment, do not connect any power cables into the power module until the module is completely installed into the chassis.
  • Page 159 Use corresponding MSM ports according to the controller card slots. Step 2 Repeat Step 1 to connect the remaining two MSM ports of the ONS 15454 M6 shelf, used as the node controller, to the subsequent subtending ONS 15454 M6 shelf assemblies. Note You can connect up to a maximum of 3 SSCs in the multishelf configuration.
  • Page 160 Using a cross-over (CAT-5) LAN cable: a) Plug one connector to any one of the remaining MSM ports of the ONS 15454 M6 SSCs in the first layer. b) Plug the other connector to any one of the MSM ports of the ONS 15454 M6 SSCs in the next layer.
  • Page 161 Stop. You have completed this procedure. Air Deflector An air deflector is a sheet-metal part that is mounted on the ONS 15454 M6 shelf to orient the air flow in a specific direction. Air deflectors can be mounted in different positions to control the air flow: •...
  • Page 162: Air Filter

    Air Filter The ONS 15454 M6 contains a preinstalled reusable air filter (15454 M6-FTF) on the right side of the shelf. The reusable filter is made up of a gray, open-cell, polyurethane foam that is specially coated to provide fire and fungi resistance.
  • Page 163 Provisioning > General > Voltage/Temperature pane. Cooling Profile The cooling profile feature allows you to control the speed of the fans in the ONS 15454 M6 shelf depending on the I/O cards used. CTC allows you to choose a cooling profile for ONS 15454 M6 shelf. You can change the cooling profile in Shelf view >...
  • Page 164 Installing the ONS 15454 M6 Shelf Cooling Profile Table 10: Cooling Profile Values for ONS 15454 M6 Cards Cards with Low Cooling Profile Cards with Medium Cooling Profile Cards with High Cooling Profile • 32-WSS • 10GE-XP • 100G-LC-C • 32-WSS-L •...

Table of Contents