For Nexus LX; unplug the data cable connection. When the fitting is reconnected to the supply, it will need time to
recharge its battery for 24 hours before it will be capable of a full length discharge again.
Testing precautions
Once the fitting is permanently connected to the mains supply, a commissioning discharge test as required in
AS/NZS2293.2 must be carried out. You will need to allow 24 hours for the battery to fully charge prior to conducting
this test, presently (at the time of writing), the standard requires that fittings operate in emergency mode for a period not
less than 2 hours for their commissioning test and for not less than 90 minutes thereafter (it is required that 6 monthly
discharge tests be carried out). You will need to keep the records for the commissioning test and enter them into the
building emergency services logbook or via other recording methods as allowed by AS/NZ2293.2.
Construction sites
Continuously switching of the mains power supply that is connected to emergency light fittings during the construction
phase of an installation will cause these fittings to discharge and charge their batteries many times over a short period;
this can shorten the life of the battery and will also result in shortened emergency lamp life. ABB does not recommend
such practices and may not honour the warranty on batteries when they are subjected to such harsh operating
conditions. Emergency light fittings are designed to be discharge tested once every 6 months as per AS/NZS2293.2,
subjecting the product to repeated discharge or charge cycles is regarded as an abuse of the fittings.
Trouble shooting guide
If you have installed and connected the unit as per the instructions listed earlier and it does not function correctly, use the
following table as a guide to fixing the problem. Look up the type of fault in the left column and check the possible causes
from the right column.
No.
Fitting type
Fault
1
Standard
Lamp does not light up when connected to mains
Nexus LX
Nexus RF
2
Nexus LX
LED is flashing green but AC lamp does not come on
when connected to mains
3
Nexus LX
LED is flashing green but lamp does not come on when
test switch is pressed
4
Nexus LX
LED does not light up red after the commissioning
5
Standard
Lamp is lit momentarily when test switch is pressed or
Nexus LX
when mains fail
Nexus RF
6
Nexus LX
LED is constant green
7
Nexus LX
Unit LED is not flashing yellow/orange under wink node
Nexus RF
command
If the unit still does not work after checking these possible causes, contact ABB service in Australia on 1300 666 595,
Monday to Friday, 7.00am to 5.00pm (AEST) and ask for help. Our trained service personnel will usually be able to
take your call immediately and assist you in resolving your difficulty. ABB is committed to providing valuable through-life
support for its products.
ABB Australia Pty Limited
Phone: 1300 666 595
Fax: 1300 666 594
www.stanilite.com.au
Possible causes
AC supply not connected or turned off; or
Switch active turned off; or
Lamp damaged or not inserted properly
Switch active turned off; or
Lamp damaged or not inserted properly; or
Missing loop from unswitched to switched active
Switch active turned off; or
Lamp damaged or not inserted properly; or
Battery pack not connected or faulty; or
Test switch damaged
Battery pack not connected; or
LED wire not properly inserted into the terminal
Battery not fully charged (allow up to 24 hours); or
Battery pack damaged
Unit self checks fail - return to manufacturer
Unit is not receiving communication signal
Check data cable wiring path and cable or RF
connections
Refer to Nexus user and technical guide
Copyright © 2016 ABB
All rights reserved
Installation manual
Batten weatherproof emergency
Standard, Nexus LX, Nexus RF
Doc no. 29-99570
Congratulations
Congratulations on choosing to use this ABB product covered by our unique through-life support system. This document
is designed to assist you during the installation of this product; for the safety of yourself and others ABB recommends
that you read this document thoroughly before commencing installation. The fittings are designed for easy
installation. They are advanced pieces of electronic equipment which, when treated with care and maintained through
regular and appropriate servicing, will perform reliably for many years to come.
Safety warning
In Australia and New Zealand, only licensed electricians are permitted by law to work with 240 volt electrical installations.
Do not attempt to install or connect this product unless you are a licensed electrician.
Turn off and isolate the electrical supply before connecting this fitting to the building wires.
Do not touch the terminals of the terminal block when the light fitting is energised.
The only user-serviceable parts are fluorescent or halogen lamp/s. LED light sources are not user-servicable.
Do not tamper with the fitting or the warranty will be void.
As the installer, it is your responsibility to ensure compliance with all relevant building and safety codes, (ie: AS3000,
AS/NZS2293). Refer to the applicable standards for data and mains cabling installation procedures and requirements.
Important note: This product is designed for indoor and outdoor use.
Nexus LX (data cable system)
The Nexus
range of emergency light fitting are designed to be connected together into a special communication network
®
over a Level 4 (or higher) high speed, single twisted pair data cable. The Nexus user and technical guide describes all
you need to know to successfully install a Nexus project. Ask for it from your supervisor, from your employer or from your
nearest ABB product supplier. The network cabling of the building must be installed as per the procedure detailed in the
Nexus user and technical guide. No mains or mains carrying cables are to be connected to the data terminals or cables.
Nexus RF (wireless system)
The Nexus RF range of light fittings are designed to communicate via a proprietary RF network, however the electrical
installation of the fittings is identical to that of a standard non-monitored fitting.
This document covers
What's inside the box
Safety warning
Batten weatherproof
Installation instructions
Installation manual
Removal instructions
Warranty information
Testing precautions
Trouble shooting guide
loading

Summary of Contents for ABB Standard

  • Page 1 AS/NZS2293.2 must be carried out. You will need to allow 24 hours for the battery to fully charge prior to conducting this test, presently (at the time of writing), the standard requires that fittings operate in emergency mode for a period not less than 2 hours for their commissioning test and for not less than 90 minutes thereafter (it is required that 6 monthly discharge tests be carried out).
  • Page 2 1. Remove the unit from the packing box and inspect it for damage or imperfections. If any damage is found, do not (after few minutes charging) install the unit, but replace it carefully into the packing box and notify the ABB product support hotline in Australia on Non-maintained...

This manual is also suitable for:

Nexus lxNexus rf