Cisco GS7000 Installation And Operation Manual

Super high output intelligent node
Table of Contents
Cisco GS7000 Super High Output Intelligent Node Installation and
Operation Guide
First Published: 2018-03-23
Americas Headquarters
Cisco Systems, Inc.
170 West Tasman Drive
San Jose, CA 95134-1706
USA
http://www.cisco.com
Tel: 408 526-4000
800 553-NETS (6387)
Fax: 408 527-0883
Table of Contents
loading

Summary of Contents for Cisco GS7000

  • Page 1 Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide First Published: 2018-03-23 Americas Headquarters Cisco Systems, Inc. 170 West Tasman Drive San Jose, CA 95134-1706 http://www.cisco.com Tel: 408 526-4000 800 553-NETS (6387) Fax: 408 527-0883...
  • Page 2 © 2018 Cisco Systems, Inc. All rights reserved.
  • Page 3: Table Of Contents

    Connection to Network Power Sources AC Power Shunts Equipotential Bonding General Servicing Precautions xiii Electrostatic Discharge Batteries Safety Disposal Modifications Accessories Electromagnetic Compatibility Regulatory Requirements EMC Compliance Statements Laser Safety Warning: Radiation Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 4 C H A P T E R 3 Tools and Test Equipment Node Fastener Torque Specifications Node Housing Ports Strand Mounting the Node Pedestal or Wall Mounting the Node Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 5 Diplexers and Trim modules RF Amplifier Assembly Replacement Procedure Care and Cleaning of Optical Connectors Recommended Equipment Tips for Optimal Fiber-Optic Connector Performance To Clean Optical Connectors Connectors and Bulkheads Cleaning Connectors Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 6 Contents Cleaning Bulkheads Verifying Equipment Operation Troubleshooting C H A P T E R 6 Troubleshooting the node Glossary A P P E N D I X A Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 7: Preface

    You may find this symbol affixed to the product. This symbol indicates a chassis terminal (normally used for equipotential bonding). You may find this symbol affixed to the product. This symbol warns of a potentially hot surface. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 8: Important

    • Ground(ing) and Earth(ing) - The terms ground(ing) and earth(ing) are synonymous. This document uses ground(ing) for clarity, but it can be interpreted as having the same meaning as earth(ing). Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide viii...
  • Page 9: Electric Shock Hazard

    • Storage temperature range of the EDR must be maintained between -40°C to +85°C (-40°F to 185°F). • Humidity range must be maintained between 5% to 95% non-condensing before installation of the EDR Digital Return module(s). • Max. altitude: <2000 m. • Protection Grade: IP68. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 10: Strand (Aerial) Installation

    (reinforced or double called out in the applicable standard) between mains and secondary circuit. Use suitably rated CERTIFIED/APPROVED CATV Cable suitable for outdoor use rated VW-1 or FT-1 or better. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 11: Ac Power Shunts

    The power shunts (where provided) must be removed before installing modules into a powered housing. Important With the shunts removed, power surge to the components and RF-connectors is reduced. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 12: Equipotential Bonding

    är kopplad till kabel-TV nät kan i vissa fall medfőra risk főr brand. Főr att undvika detta skall vid anslutning av utrustningen till kabel-TV nät galvanisk isolator finnas mellan utrustningen och kabel-TV nätet. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 13: General Servicing Precautions

    Connection to a cable distribution system has therefore to be provided through a device providing electrical isolation below a certain frequency range (galvanic isolator, see EN 60728-11). Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide xiii...
  • Page 14: Electrostatic Discharge

    • Replace batteries with the same or equivalent type recommended by manufacturer. • Do not expose batteries to temperatures above 100°C (212°F). Disposal • The batteries may contain substances that could be harmful to the environment. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 15: Modifications

    This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when this equipment is operated in a commercial environment. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 16: Laser Safety

    • Do not view an activated fiber with optical instruments (e.g., eye loupes, magnifiers, microscopes). • Use safety-approved optical fiber cable to maintain compliance with applicable laser safety requirements. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 17: Warning: Fiber Optic Cables

    • Install this software in equipment that is located in a restricted access area. Laser Warning Labels One or more of the labels shown below are located on this product. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide xvii...
  • Page 18 Preface Laser Warning Labels Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide xviii...
  • Page 19: Location Of Labels On Equipment

    Preface Location of Labels on Equipment Location of Labels on Equipment The following illustrations display the location of warning labels on this equipment. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 20 Preface Location of Labels on Equipment Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 21: General Information

    Physical Description This node is the latest generation 1.2 GHz optical node in the GS7000 Node platform. It is based on the same housing developed for the original GS7000 Node Platform. The node is designed to eliminate the need for installing and maintaining the typical amplifier plug-in accessories such as pads, equalizers, trims and signal directors.
  • Page 22 Physical Description • Intelligent Remote PHY Device The following illustration shows the external housing of the node. Figure 1: The following illustration shows the node internal modules and components. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 23: Functional Description

    The lower edge of the passband is primarily determined by the frequency split of the diplex filters and the reverse amplifier assembly. The Cisco GS7000 Intelligent Node will contain a Cisco Remote PHY Device (RPD) in lieu of the optical receivers and transmitters which have been used in previous versions of the GS7000 nodes.
  • Page 24: Node Inputs/Outputs Diagram

    • two SFP+ 10G interfaces • one CONSOLE interface • 50-pin B2B connector interface between iRPD and OIB • 1 DS X 2 US Physical RF ports between iRPD and GS7000 Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 25: Amplifier Output Linear Tilt Chart

    OIB for the setup of the Remote PHY device. Amplifier Output Linear Tilt Chart The following chart can be used to determine the operating level at a particular frequency considering the operating linear tilt. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 26: Ordering Information

    Please refer to the iNode Data Sheet for a full listing of the configured node, components, and accessories that are available. Please consult with your Account Representative, Customer Service Representative, or System Engineer Note to determine the best configuration PID for your particular application. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 27: Theory Of Operation

    Power Distribution, page 10 • RF Amplifier Module, page 10 • Optical Interface Board, page 11 • Intelligent Remote PHY Device, page 12 • Power Supply Module, page 12 Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 28: System Diagrams

    Forward path refers to signals received by the node from the hub or headend. These signals are amplified in the node and routed to subscribers through the cable distribution network. Forward Path Signal Routing Node forward path signal routing functions are described below. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 29: Reverse Path

    The RF signals travel across the OIB to the Remote PHY Device. The Remote PHY Device converts the RF signals to optical signals which are transmitted through the fiber portion of the network back to the hub or headend. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 30: Spectrum Capture

    To save power, the user can independently turn off any of the forward path gain blocks. The node can also automatically adjust power consumption based on the channel plan. Note that this feature is disabled by default and the user needs to use LCS to enable it. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 31: Agc

    If Heartbeat LED and Communication LED blink on power up and then stay off, problem is with boot. Can be a device failure or software is not loaded. Try cycling power. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 32: Intelligent Remote Phy Device

    The DC output voltages generated by the power supply, at given load currents, are shown below: Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 33: Node Power Limitations

    This creates common DC powering circuits when multiple supplies are present in the node. Node Power Limitations The node must be configured in a manner that prevents potential thermal overloads. Heat generated by the node can reduce the life of the equipment. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 34: Cisco Gs7000 Super High Output Intelligent Node Installation And Operation Guide

    Component DC Power Consumption (Typical) +24.5 +8.5 VDC +5.5 VDC -6 VDC Launch amplifier with reverse amplifier Amps 3.77 0.27 Amps 0.23 iRPD Module Amps 1.83 0.02 Power supply DC current rating Amps Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 35: Installation

    • True-RMS digital voltmeter (DVM) • EXFO FOT 22AX optical power meter with adapters • Optical connector cleaning supplies • Optical connector microscope with appropriate adapters for your optical connectors Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 36: Node Fastener Torque Specifications

    20 to 25 ft-lbs (27.1 to 33.9 Nm) Node Housing Ports The following illustration shows the location of available RF ports, fiber ports, and test points on the node housing. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 37: Strand Mounting The Node

    2 Attach the strand clamp brackets to the housing in the position shown in the following illustration. Use a torque wrench tightens the strand clamp bracket bolts from 5 ft-lb to 8 ft-lbs (6.8 to 10.8 Nm). Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 38: Cisco Gs7000 Super High Output Intelligent Node Installation And Operation Guide

    Then lift the housing into proper position on the strand. 4 Slip the clamps over the strand and finger-tighten the clamp bolts. This allows additional side-to-side movement of the housing as needed. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 39: Cisco Gs7000 Super High Output Intelligent Node Installation And Operation Guide

    A slight tilt of the face of the housing is normal. Cable tension will cause the housing to hang more closely Note to vertical. 7 Connect the coaxial cable to the pin connector according to the pin connector manufacturer’s specifications. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 40: Pedestal Or Wall Mounting The Node

    Line up the bolt holes on the bottom of the housing with the mounting holes on the pedestal bracket provided by the pedestal manufacturer. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 41: Fiber Optic Cable Installation

    This procedure assumes a specific type of connector as an example. Your connector may be different from the one shown in these illustrations. Be sure to install the connector according to the connector manufacturer’s instructions. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 42: Color Code

    The fiber routing track provides a channel for routing fiber pigtails to their appropriate optical modules as well as a location to snap in unused fiber connectors for storage. The following illustration shows the design of the fiber tray. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 43: Install Fiber Optic Cable

    The following illustrations show the location and layout of the fiber tray and track in the housing lid. Install Fiber Optic Cable Install fiber optic cable as described below. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 44: Cisco Gs7000 Super High Output Intelligent Node Installation And Operation Guide

    3 Push in the two release tabs at the top of the fiber tray and swivel the top of the fiber tray up and back to allow a clear view of the fiber routing channel below. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 45: Cisco Gs7000 Super High Output Intelligent Node Installation And Operation Guide

    Do not bend or kink fibers. Though not necessary, you can also remove the power supplies and open the fiber routing channel cover for additional access. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 46: Cisco Gs7000 Super High Output Intelligent Node Installation And Operation Guide

    Be sure to leave enough fiber so that each connector can reach its intended module. Note that different diameter spool paths are provided to properly adjust the fiber length. 12 Route each fiber to its intended module through the fiber track as shown. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 47: Rf Cable Installation

    Trimming Using the Integrated Cradle To trim long pins using the integrated cradle, follow these steps. 1 Place the connector on the cradle as shown in the following illustration. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 48: Trimming Using The Strip Line Mark

    2 If the center conductor extends past the STRIP line on the housing, trim the pin flush with the STRIP line. 3 Remove any burrs or sharp edges from the trimmed end of the pin. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 49: Connecting The Rf Cables To The Node Housing

    AC shunts for the ports through which you want to pass AC power. An AC segmentable shunt is provided to configure power direction between the two sides of the node. The following schematic diagram illustrates node powering. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 50: Node Powering Procedure

    Ports 1, 2, and 3 are powered from one source and ensure that the AC segmentable shunt is removed. Ports 4, 5 and 6 are powered from another source 5 Continue to Voltage Check Procedure, on page Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 51: Voltage Check Procedure

    3 Verify that the LED on the OIB is on. 4 Carefully close the housing lid. See Opening and Closing the Housing, on page Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 52: Cisco Gs7000 Super High Output Intelligent Node Installation And Operation Guide

    Installation Voltage Check Procedure Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 53: Setup And Operation

    How To Install the Cisco Remote-PHY Solution. Refer to your network design diagrams during setup. The design diagrams should specify the exact input and output signal levels required for your network. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 54: Cisco Gs7000 Super High Output Intelligent Node Installation And Operation Guide

    Setup and Operation Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 55: Maintenance

    Closing the Housing Close the housing as follows. 1 Ensure any worn gaskets are replaced, and the gaskets are clean and in the correct position. 2 Carefully close the lid. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 56: Preventative Maintenance

    Preventive maintenance procedures are regularly scheduled actions that help prevent failures and maintain the appearance of the equipment. Schedule Perform the preventive maintenance procedures at these intervals. Procedure Interval Visual Inspection: External Surfaces Semiannually Connectors Semiannually Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 57: Visual Inspection

    Wiring and cables Inspect for: • cuts, nicks, burns, or abrasions • exposed bare conductors • sharp bends • pinched or damaged wires • broken or loose lacing or clamps Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 58: Cleaning

    4 Clean electrical contacts with spray-type contact cleaner. 5 Clean internal connectors and circuit boards with hand-controlled, dry-air jet. Do not use pressure exceeding 15 lb/in2 (1.05 kg/cm2, or 103.43 kPa). Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 59: Removing And Replacing Modules

    5 Position the new module in the same location and carefully slide the module into its slot until connected to the optical interface board. 6 Tighten the screws securing the module. Torque screws to 25 to 30 in-lbs (2.8 to 3.4 Nm). Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 60: Diplexers And Trim Modules

    8 Close the housing. See Opening and Closing the Housing, on page 9 Refer to Cisco GS7000 Super High Output Intelligent Node Software Installation and Configuration Guide to verify node performance. Diplexers and Trim modules The diplexer modules and High Pass Filter/Trim modules plug into the RF amplifier assembly through cut-outs in its cover.
  • Page 61: Cisco Gs7000 Super High Output Intelligent Node Installation And Operation Guide

    Be careful not to damage the housing with the screwdriver. Important 6 Grasp the two metal handles on the RF amplifier assembly and carefully lift the RF assembly out of the housing. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 62: Care And Cleaning Of Optical Connectors

    10 Reinstall the AC power shunts in their proper locations on the RF amp assembly. 11 Close the housing. See Opening and Closing the Housing, on page 12 Refer to Cisco GS7000 Super High Output Intelligent Node Software Installation and Configuration Guide to verify node performance. Care and Cleaning of Optical Connectors Caution Proper operation of this equipment requires clean optical fibers.
  • Page 63: Recommended Equipment

    • Avoid personal injury! Viewing the laser output with optical instruments (such as eye loupes, magnifiers, or microscopes) may pose an eye hazard. • Connect or disconnect fiber only when equipment is OFF or in Service mode. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 64: Connectors And Bulkheads

    2 If the connector is dirty but otherwise undamaged, clean the connector as follows: a Make several swipes across the face of the connector with the appropriate ferrule cleaner. This will remove dust and some films. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 65: Cleaning Bulkheads

    Check with a fiber connector scope again to confirm that there is no dirt or alcohol residue on the optical surface. e If any alcohol residue remains, clean it off with a new dry bulkhead swab. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 66: Verifying Equipment Operation

    Verifying Equipment Operation Perform circuit turn-up. If the equipment does not come up, i.e., fails verification or indicates a reflection problem, clean the connectors and bulkheads again. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 67: Troubleshooting

    Try cycling power. Error #3 Not blink Steady blink This condition should not be possible unless Heartbeat LED is damaged. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 68: Troubleshooting The Node

    • Verify if there is RF port cabling and the RF input levels are as expected. • Verify the reverse RF cable between OIB and launch amplifier is connected properly. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 69 Look at the reverse path to determine which port(s) are noisy. Using max hold makes it easier to see bursty noise signals. Poor frequency response • Ensure RF cables are connected properly. • Ensure that the diplexers match the installed splitter. Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 70: Troubleshooting The Node

    Troubleshooting Troubleshooting the node Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 71: Appendix A Glossary

    • LCS: Local Control Software • MCU: Microprocessor Control Unit • MIB: Management Interface Base • OIB: Optical Interface Board • RPHY: Remote PHY • USB: Universal Serial Bus Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...
  • Page 72 Glossary Cisco GS7000 Super High Output Intelligent Node Installation and Operation Guide...

Table of Contents