BATTERIES AND STORAGE SITE PLANNING AND POSITIONING 1.5.1 PLANNING BEFORE THE INSTALLATION 1.5.2 POSITIONING OF UPS AND BATTERY CABINET ELECTRICAL INSTALLATION 1.6.1 PREPARATION FOR THE INPUT CABLING 1.6.2 INSTALLATION CHECKLIST 04-3008_CoverABB_OPMCPDPA-S2_GB_121202 Page 3/8 ABB Printed in Switzerland – Modifications reserved...
Page 4
LOAD TRANSFER: FROM MAINTENANCE BYPASS TO INVERTER OPERATIONS REPLACEMENT OF UPS-MODULE 5.2.1 REPLACEMENT OF UPS-MODULE IN SINGLE-MODULE SYSTEMS 5.2.2 REPLACEMENT OF UPS-MODULE IN REDUNDANT MULTI-MODULE SYSTEM 5.2.3 REPLACEMENT OF A MODULE IN CAPACITY MULTI-MODULE SYSTEM 04-3008_CoverABB_OPMCPDPA-S2_GB_121202 Page 4/8 ABB Printed in Switzerland – Modifications reserved...
Page 5
8.1.3 FAULT IDENTIFICATION AND RECTIFICATION SECTION-9: OPTIONS 9.1.1 INTRODUCTION 9.1.2 REMOTE SHUTDOWN 9.1.3 GENERATOR ON FACILITIES 9.1.4 WAVEMON SHUTDOWN AND MANAGEMENT SOFTWARE 9.1.5 SNMP CARD/ADAPTER FOR NETWORK MANAGEMENT /REMOTE MONITORING 04-3008_CoverABB_OPMCPDPA-S2_GB_121202 Page 5/8 ABB Printed in Switzerland – Modifications reserved...
Page 6
10.11.1 HEAT DISSIPATION PER MODULE WITH NON-LINEAR LOAD 10.12 WIRING AND BLOCK DIAGRAMS FOR ALL FRAMES AND MODULE 10.12.1 TERMINAL CONNECTIONS OVERVIEW 10.12.2 SINGLE FEED INPUT 10.12.3 DUAL FEED INPUT 04-3008_CoverABB_OPMCPDPA-S2_GB_121202 Page 6/8 ABB Printed in Switzerland – Modifications reserved...
Page 7
UPS. The reader is expected to know the fundamentals of electricity, wiring, electrical components and electrical schematic symbols CAREFULLY READ THE USER MANUAL BEFORE OPERATING OR WORKING ON THE UPS. 04-3008_CoverABB_OPMCPDPA-S2_GB_121202 Page 7/8 ABB Printed in Switzerland – Modifications reserved...
Page 8
(depending on Module power and type of load) Very low input current distortion THDi Gen-set power and installation cost saving THDi = < 3 - 4% for loads of 100 – 25 % 04-3008_CoverABB_OPMCPDPA-S2_GB_121202 Page 8/8 ABB Printed in Switzerland – Modifications reserved...
WARNING! READ THE INFORMATION, IN ORDER TO AVOID EQUIPMENT DAMAGES NOTE! THE WEIGHT OF A UPS MODULE CAN REACH 50KG, THEREFORE IT CAN BE LIFTED ONLY BY 2 PERSON HEAVY! 04-3008_S1_ABB_OPMCPDPA-S2_GB_121202 Page 3/22 ABB Printed in Switzerland – Modifications reserved...
Refer to the Operator’s Manual for more information DANGER: RISK OF ELECTRIC SHOCK There is a risk of electric shock present, and you should observe associated warnings. The UPS contains high voltages. 04-3008_S1_ABB_OPMCPDPA-S2_GB_121202 Page 4/22 ABB Printed in Switzerland – Modifications reserved...
CIRCUIT BREAKERS. THE SERVICE PERSONNEL HAS TO BE INFORMED ABOUT DANGEROUS VOLTAGES. THE WARNING PANELS MUST CONTAIN WARNING! THE FOLLOWING TEXT: “ BEFORE STARTING WITH THE MAINTENANCE WORK ON THE CIRCUIT BREAKERS MAKE SURE THE UPS IS ISOLATED 04-3008_S1_ABB_OPMCPDPA-S2_GB_121202 Page 5/22 ABB Printed in Switzerland – Modifications reserved...
Please note the type code and the serial number of the equipment and contact your nearest agent authorized by the manufacturer. The Code and the serial no. are shown on the nameplate see 1.4.4 Nameplate and identification 04-3008_S1_ABB_OPMCPDPA-S2_GB_121202 Page 6/22 ABB Printed in Switzerland – Modifications reserved...
No over sizing of generators No false circuit breaker tripping and malfunction No erratic operation of computers, telecommunication, monitors, electronic test equipment etc. No Resonance with power factor correction capacitors 04-3008_S1_ABB_OPMCPDPA-S2_GB_121202 Page 7/22 ABB Printed in Switzerland – Modifications reserved...
It provides automatic load sharing and module level redundancy with nothing other than the power connecting to the Conceptpower DPA S2 version of UPS modules. 04-3008_S1_ABB_OPMCPDPA-S2_GB_121202 Page 8/22 ABB Printed in Switzerland – Modifications reserved...
It is possible to parallel Conceptpower DPA S2 CLASSIC DPA-50, TRIPLE DPA-150, UPGRADE DPA-250 Cabinets into a Multi-Cabinet Configuration (including total up to 30 Modules) in order to increase the number of paralleled Modules. 04-3008_S1_ABB_OPMCPDPA-S2_GB_121202 Page 10/22 ABB Printed in Switzerland – Modifications reserved...
OTHER CLAIM FOR SHIPPING DAMAGE MUST BE FILED IMMEDIATELY TOO NOTE! AND THE CARRIER MUST BE INFORMED WITHIN 7 DAYS OF RECEIPT OF THE EQUIPMENT. THE PACKING MATERIALS SHOULD BE STORED FOR FURTHER INVESTIGATION. 04-3008_S1_ABB_OPMCPDPA-S2_GB_121202 Page 11/22 ABB Printed in Switzerland – Modifications reserved...
1) Examine the UPS for any sign of damage. Notify your carrier or supplier immediately if damage is apparent; 2) Remove the plastic cover from the UPS; 3) Remove pallet from the UPS; HEAVY ! 1) 1) 04-3008_S1_ABB_OPMCPDPA-S2_GB_121202 Page 12/22 ABB Printed in Switzerland – Modifications reserved...
If the UPS is delivered without batteries, the manufacturer is not responsible for any damage or malfunctioning caused to the UPS by incorrect wiring. HEAVY ! 04-3008_S1_ABB_OPMCPDPA-S2_GB_121202 Page 13/22 ABB Printed in Switzerland – Modifications reserved...
UPS must not exceed +40 °C. Avoid high ambient temperature, moisture and humidity. The floor material should be non-flammable and strong enough to support the heavy load. 04-3008_S1_ABB_OPMCPDPA-S2_GB_121202 Page 14/22 ABB Printed in Switzerland – Modifications reserved...
If you have to use for other reason a 4-pole switch, you have to be aware that NOTE! the neutral against the ground is floating. For the UPS itself this is not a problem. 230V 04-3008_S1_ABB_OPMCPDPA-S2_GB_121202 Page 17/22 ABB Printed in Switzerland – Modifications reserved...
NOTE: The UPS is provided with facilities for both single feed (one common input cable for rectifier and bypass) and dual feed (separate input cable for rectifier and bypass). 04-3008_S1_ABB_OPMCPDPA-S2_GB_121202 Page 18/22 ABB Printed in Switzerland – Modifications reserved...
The size of the circuit breakers depends on the load rating of the load sockets. The circuit breakers must comply with the prescribed IEC Standards. It is recommended to provide a separate output distribution board for the load. 04-3008_S1_ABB_OPMCPDPA-S2_GB_121202 Page 19/22 ABB Printed in Switzerland – Modifications reserved...
Connect the output power cable coming from the LV-Distribution Board to the terminals of the UPS as shown in drawing in Section 2 / Chapter 2.2 (Front view of the Conceptpower DPA™ S2) 04-3008_S1_ABB_OPMCPDPA-S2_GB_121202 Page 20/22 ABB Printed in Switzerland – Modifications reserved...
Any optional accessories are mounted in their installed location and properly wired. Summary alarms and/or building alarms are wired appropriately. (OPTIONAL) Startup and operational checks performed by authorized service personnel. All network connections are completed. 04-3008_S1_ABB_OPMCPDPA-S2_GB_121202 Page 21/22 ABB Printed in Switzerland – Modifications reserved...
Page 30
Section-1 This page left intentionally blank 04-3008_S1_ABB_OPMCPDPA-S2_GB_121202 Page 22/22 ABB Printed in Switzerland – Modifications reserved...
Page 31
Connection of External Battery Cabinet for Conceptpower DPA™ S2 ......15 2.3.2.3 Connection of External Separate Battery for Conceptpower DPA S2 ....... 16 2.3.2.4 Connection of External Common Battery for Conceptpower DPA S2 ....... 16 04-3008_S2_ABB_OPMCPDPA-S2_GB_121202 Page 1/16 ABB Printed in Switzerland – Modifications reserved...
5x120 or 5x(2x50) 5x120 or 5x(2x50) 218 A 3x300A*1 3x150 3x (3x25) DPA-150 UPGRADE 3x400A 5x(2x95) 5x(2x95) 362 A 3x500A*1 3x(2x150) 5x (3x25) DPA-250 *1 only valid for common battery use 04-3008_S2_ABB_OPMCPDPA-S2_GB_121202 Page 3/16 ABB Printed in Switzerland – Modifications reserved...
5x120 or 5x(2x50) 3x250A 218 A 3x300A*1 3x150 4x(2x50) 5x(2x50) (3x25) UPGRADE 3x400A 5x(2x95) 3x400A 4x(2x95) 5x(2x95) 362 A 3x500A*1 3x(2x150) DPA-250 (3x25) *1 only valid for common battery use 04-3008_S2_ABB_OPMCPDPA-S2_GB_121202 Page 4/16 ABB Printed in Switzerland – Modifications reserved...
NOTE: For UPS-Systems DPA 30kVA and DPA 50kVA it is allowed to use 40-50 (only even numbers) of 12V- battery blocks. NOTE: Set-up the correct number of battery blocks on Control Panel (Menu: Service-Set-Up). CONCEPTPOWER CLASSIC DPA-50 UPS 1 UPS 1...
NOTE: Set-up the correct number of battery blocks on Control Panel (Menu: Service-Set-Up). CONCEPTPOWER TRIPLE DPA-150 DPA TRIPLE 150 frame 3x(2x40)x7Ah Other combination possible : refer to Section 10 04-3008_S2_ABB_OPMCPDPA-S2_GB_121202 Page 12/16 ABB Printed in Switzerland – Modifications reserved...
Fuse Type (Very Fast acting) 730x1975x800 1200x1975x800 Dimensions (WxHxD) Weight with trays and w/o batteries For detailed information and layout of the battery cabinets please refer to section 10 / Options 04-3008_S2_ABB_OPMCPDPA-S2_GB_121202 Page 13/16 ABB Printed in Switzerland – Modifications reserved...
Page 44
40x28Ah. Depending on the request the batteries may be connected separately for each Module or it is possible to parallel them together into one common battery for five UPS-modules. 04-3008_S2_ABB_OPMCPDPA-S2_GB_121202 Page 14/16 ABB Printed in Switzerland – Modifications reserved...
3) Make sure the battery fuses in the external battery cabinet and on the UPS are open. 4) Connect Earth (PE) between the UPS and external battery cabinet. 5) Connect the corresponding + , N, - terminals between UPS and external battery cabinet according to drawing 04-3008_S2_ABB_OPMCPDPA-S2_GB_121202 Page 15/16 ABB Printed in Switzerland – Modifications reserved...
RS232 / Sub D9/ female, PC interface JD12 RS232/ Sub D9 / male for Multidrop ONLY PC Interface SNMP Slot for optional SNMP card ONLY Fig. 3. Example : Distribution Interfaces 04-3008_S3_ABB_OPMCPDPA-S2_GB_121202 Page 4/4 ABB Printed in Switzerland – Modifications reserved...
UPS. The menu driven LCD enables the access to the: EVENT REGISTER; Monitor the input and output U, I, f, P, Battery runtime; To perform commands like start-up and shut-down of UPS and 04-3008_S4_ABB_OPMCPDPA-S2_GB_121202 Page 2/10 ABB Printed in Switzerland – Modifications reserved...
IN THE CASE THAT THE PARALLEL UPS SYSTEM HAS TO BE TURNED OFF, THEN BOTH ON/OFF BUTTONS ON ALL UPS MODULES HAVE TO BE PUSHED. IN THIS CASE THE POWER SUPPLY TO THE LOAD WILL NOTE! BE INTERRUPTED 04-3008_S4_ABB_OPMCPDPA-S2_GB_121202 Page 3/10 ABB Printed in Switzerland – Modifications reserved...
So the positions of the DIP Switch SW1-9 must be set as shown below: SW1-9 Single First Middle Last Cabinet Cabinet Cabinet Cabinet ON OFF ON OFF ON OFF ON OFF ON OFF ON OFF ON OFF ON OFF ON OFF 04-3008_S4_ABB_OPMCPDPA-S2_GB_121202 Page 4/10 ABB Printed in Switzerland – Modifications reserved...
Various settings can be performed by the user: Date/Time, automatic battery test, etc. SET-UP SERVICE SET-UP SERVICE Various adjustments can be performed by the service staff NO MORE MENU 04-3008_S4_ABB_OPMCPDPA-S2_GB_121202 Page 5/10 ABB Printed in Switzerland – Modifications reserved...
LCD-DISPLAY LOAD TO INVERTER Transfer Load to inverter LOAD TO BYPASS LOAD TO BYPASS Transfer Load to bypass. PERFORM BATT.TEST PERFORM BATT.TEST Battery Test NO MORE COMMANDS 04-3008_S4_ABB_OPMCPDPA-S2_GB_121202 Page 6/10 ABB Printed in Switzerland – Modifications reserved...
SET-UP SERVICE This Menu is reserved for authorized service PASSWORD engineers. It is not to be used by End-Users PASSWORD. Type in password Password is necessary to enter: Service Manual 04-3008_S4_ABB_OPMCPDPA-S2_GB_121202 Page 7/10 ABB Printed in Switzerland – Modifications reserved...
The "Bypass-Mode”, is recommended only if the loads can tolerate interruptions of 3-5 ms (transfer time from Bypass Mode to ON-LINE Mode). TO HAVE TO MOST ESSENTIAL SECURITY LEVEL, WE RECOMMEND TO RUN THE UPS ON NORMAL OPERATION MODE, MEANS UPS MODE. NOTE! 04-3008_S4_ABB_OPMCPDPA-S2_GB_121202 Page 8/10 ABB Printed in Switzerland – Modifications reserved...
In redundant parallel configurations it is used to isolate a unit from the parallel system without the need of transferring the load to bypass. POSITION EFFECT Normal Operation (Load supplied by UPS) UPS-Module isolated from Parallel Bus for maintenance or module replacement (UPS-Module not supplying load) 04-3008_S4_ABB_OPMCPDPA-S2_GB_121202 Page 9/10 ABB Printed in Switzerland – Modifications reserved...
Page 60
Section-4 This page left intentionally blank 04-3008_S4_ABB_OPMCPDPA-S2_GB_121202 Page 10/10 ABB Printed in Switzerland – Modifications reserved...
Page 61
Replacement of a Module in Capacity Multi-Module System ..........13 5.2.3.1 How to Extract a Module in a Capacity Multi-Module System ........13 5.2.3.2 How to Fit Back a Module in a Capacity Multi-Module System ........14 04-3008_S5_ABB_OPMCPDPA-S2_GB_121202 Page 1/16 ABB Printed in Switzerland – Modifications reserved...
LED Indicator Colour LINE 1 Green LINE 2 Green BYPASS Green INVERTER BATTERY Flashing Green Check Command: LOAD TO INVERTER LED indicator will appear as shown below: 04-3008_S5_ABB_OPMCPDPA-S2_GB_121202 Page 2/16 ABB Printed in Switzerland – Modifications reserved...
Page 63
On LCD: “MANUAL BYP IS CLOSED” will appear and the LED-indicator will indicate as shown below: LED Indicator Colour LINE 1 Green LINE 2 Green BYPASS Green INVERTER BATTERY Green 04-3008_S5_ABB_OPMCPDPA-S2_GB_121202 Page 3/16 ABB Printed in Switzerland – Modifications reserved...
Page 64
UPS-modules. On all LCD’s: “LOAD PROTECTED” will appear followed by Check the output Voltages and Currents once again. THE LOAD IS NOW PROTECTED BY THE CONCEPTPOWER DPA 04-3008_S5_ABB_OPMCPDPA-S2_GB_121202 Page 4/16 ABB Printed in Switzerland – Modifications reserved...
Open the mains fuses/breaker in the building distribution panel. MAKE SURE THE INTERNAL DC-CAPACITORS (ELCO) HAVE BEEN DISCHARGED WAITING AT LEAST 5 MINUTES. NOTE! THE CONCEPTPOWER DPA S2 IS NOW VOLTAGE FREE. 04-3008_S5_ABB_OPMCPDPA-S2_GB_121202 Page 5/16 ABB Printed in Switzerland – Modifications reserved...
Open battery fuses/breakers on the internal (if any) and the external battery cabinets or racks. THE UPS SYSTEM IS STILL POWERED (DANGEROUS VOLTAGE). NOTE! THE LOAD IS NOW SUPPLIED BY MAINS AND IS THEREFORE NOT PROTECTED THROUGH THE UPS. NOTE! 04-3008_S5_ABB_OPMCPDPA-S2_GB_121202 Page 6/16 ABB Printed in Switzerland – Modifications reserved...
LOAD to Inverter on the complete system (all units). On LCD panel “LOAD PROTECTED” will appear. THE LOAD IS NOW SUPPLIED BY INVERTER POWER AND IS PROTECTED 04-3008_S5_ABB_OPMCPDPA-S2_GB_121202 Page 7/16 ABB Printed in Switzerland – Modifications reserved...
On LCD: “MANUAL BYP IS CLOSED” will appear and the LED-indicator will indicate as shown below: LED Indicator Colour LINE 1 Green LINE 2 Green BYPASS Green INVERTER BATTERY Green The load is now directly supplied by mains and is not protected 04-3008_S5_ABB_OPMCPDPA-S2_GB_121202 Page 8/16 ABB Printed in Switzerland – Modifications reserved...
Two persons are needed to pull out the module from the UPS-Frame. The weight of a DPA 50 S2, 40 kW module is 46.8kg (the weight of DPA 30 S2 , 24kW module is 43.1kg) Tighten the four screws on the front of module. 04-3008_S5_ABB_OPMCPDPA-S2_GB_121202 Page 9/16 ABB Printed in Switzerland – Modifications reserved...
Page 70
Open Maintenance Bypass (IA1) by turning it to position “OFF”. The load is now supplied by the static bypass. Transfer load to Inverter-Mode by means of COMMAND “LOAD TO INVERTER”. On LCD: “LOAD PROTECTED” will appear. THE LOAD IS NOW PROTECTED BY THE CONCEPTPOWER DPA™ S2 04-3008_S5_ABB_OPMCPDPA-S2_GB_121202 Page 10/16 ABB Printed in Switzerland – Modifications reserved...
How to insert a module in a Redundant Multi Module System THE WEIGHT OF A UPS MODULE CAN REACH 50KG, THEREFORE IT CAN BE LIFTED ONLY BY 2 PERSONS. THE MODULE MUST NEVER BE CARRIED BY ONE PERSON ONLY WARNING 04-3008_S5_ABB_OPMCPDPA-S2_GB_121202 Page 11/16 ABB Printed in Switzerland – Modifications reserved...
Page 72
Module will restart automatically connecting load to inverter and run in parallel with other ON LINE modules. LCD panel must show LOAD PROTECTED indication. THE LOAD IS NOW PROTECTED BY THE CONCEPTPOWER DPA 04-3008_S5_ABB_OPMCPDPA-S2_GB_121202 Page 12/16 ABB Printed in Switzerland – Modifications reserved...
Open the Parallel Isolator Switch IA2 (switch to position “OFF”) of UPS-module to be replaced. The UPS-module is now disconnected from the output; Press both ON/OFF Buttons on UPS-Module simultaneously; Open corresponding battery fuses; 04-3008_S5_ABB_OPMCPDPA-S2_GB_121202 Page 13/16 ABB Printed in Switzerland – Modifications reserved...
Close internal and/or external battery fuses/breaker of the new Module Press both “ON/OFF” Buttons simultaneously to start-up UPS. LCD panel must display: “LOAD DISCONNECTED PARALLEL SWITCH OPEN” and the LED- indicator will appear as shown below: 04-3008_S5_ABB_OPMCPDPA-S2_GB_121202 Page 14/16 ABB Printed in Switzerland – Modifications reserved...
Page 75
On LCD: “LOAD PROTECTED” will appear and the LED-indicator will indicate as shown below: LED Indicator Colour LINE 1 Green LINE 2 Green BYPASS INVERTER Green BATTERY Green THE LOAD IS NOW PROTECTED BY THE CONCEPTPOWER DPA 04-3008_S5_ABB_OPMCPDPA-S2_GB_121202 Page 15/16 ABB Printed in Switzerland – Modifications reserved...
Page 76
Section-5 This page left intentionally blank 04-3008_S5_ABB_OPMCPDPA-S2_GB_121202 Page 16/16 ABB Printed in Switzerland – Modifications reserved...
Page 77
Commissioning of Multi-Cabinet Configuration ..............6 6.1.3.1 Start-up of a Multi-Cabinet Configuration ............... 6 6.1.3.2 Shutdown of Multi-Cabinet Configuration ............... 6 6.1.3.3 Replacement of a Faulty UPS-Module in a Multi-Cabinet Configuration ......6 04-3008_S6_ABB_OPMCPDPA-S2_GB_121202 Page 1/6 ABB Printed in Switzerland – Modifications reserved...
S2. If in a parallel UPS system the load is transferred to the BYPASS (load on mains) and if the mains fails, the UPS’s will all be automatically transferred to inverter within 5msec. 04-3008_S6_ABB_OPMCPDPA-S2_GB_121202 Page 2/6 ABB Printed in Switzerland – Modifications reserved...
Master-Slave Master-Slave Master-Slave Master-Slave Master-Slave SW2-2 Master-Slave Master-Slave Output Input Output Input Output Input Output Input Figure 1.2.Connection of the Bus Lines when paralleling UPS-Cabinets by means of Parallel Adapters. 04-3008_S6_ABB_OPMCPDPA-S2_GB_121202 Page 3/6 ABB Printed in Switzerland – Modifications reserved...
ON OFF ON OFF ON OFF ON OFF ON OFF ON OFF After having set the SW1-9 on all the CONCEPTPOWER DPA S2 - Cabinets correctly the UPS’s may be commissioned 04-3008_S6_ABB_OPMCPDPA-S2_GB_121202 Page 4/6 ABB Printed in Switzerland – Modifications reserved...
UPS’s will automatically transfer the load back to the inverters with 5msec. In order to provide the load with maximum protection the manufacturer always recommends that the load be supplied by the inverter (ON-LINE-Mode). 04-3008_S6_ABB_OPMCPDPA-S2_GB_121202 Page 5/6 ABB Printed in Switzerland – Modifications reserved...
Replacement of a Faulty UPS-Module in a Multi-Cabinet Configuration If in a Multi-Cabinet Configuration a UPS-Module fails proceed in replacing the UPS-Module in analogy with the replacement procedures described in section 5 of this User Manual 04-3008_S6_ABB_OPMCPDPA-S2_GB_121202 Page 6/6 ABB Printed in Switzerland – Modifications reserved...
Page 83
Introduction ..........................2 7.1.2 User Responsibilities ......................2 7.1.3 Routine Maintenance ......................2 7.1.4 Battery Test ........................... 2 7.1.5 Battery Maintenance ......................3 7.1.6 Battery Disposal and recycling ....................3 04-3008_S7_ABB_OPMCPDPA-S2_GB_121202 Page 1/4 ABB Printed in Switzerland – Modifications reserved...
Page 84
The battery testing can be carried out independently of the operation mode (OFF-LINE or ON-LINE) and whether or not the load is connected. The battery test procedure can be performed from the UPS front panel. See “Operation” section 4 / 4.1.3.5. 04-3008_S7_ABB_OPMCPDPA-S2_GB_121202 Page 2/4 ABB Printed in Switzerland – Modifications reserved...
Page 85
Battery Disposal and recycling Batteries contain dangerous substances that will harm the environment if thrown away. If you change the batteries yourself, call qualified organizations for battery disposal and recycling. 04-3008_S7_ABB_OPMCPDPA-S2_GB_121202 Page 3/4 ABB Printed in Switzerland – Modifications reserved...
Page 86
Section-7 This page left intentionally blank 04-3008_S7_ABB_OPMCPDPA-S2_GB_121202 Page 4/4 ABB Printed in Switzerland – Modifications reserved...
This alarm is only displayed if the UPS is on supplied by mains. Maintenance Bypass. CLOSED In case of alarms not included in the list above, please contact the nearest authorised service centre for assistance. 04-3008_S8_ABB_OPMCPDPA-S2_GB_121202 Page 2/2 ABB Printed in Switzerland – Modifications reserved...
Page 89
Wavemon Shutdown and ManagementSoftware ..............3 9.1.4.1 Why is UPS Management important? ................3 9.1.4.2 WAVEMON Shutdown and Monitoring Software ............3 9.1.5 SNMP CARD/ADAPTER For Network Management /Remote Monitoring ......5 04-3008_S9_ABB_OPMCPDPA-S2_GB_121202 Page 1/6 ABB Printed in Switzerland – Modifications reserved...
Connect the cable as shown in Fig. 1. REMOTE SHUT DOWN SWITCH (N.C. = Normally Closed) Remote shut down (X1) X1/1 X1/2 Terminal Block Fig 1. Drawing of the wiring for the REMOTE SHUT DOWN SWITCH. 04-3008_S9_ABB_OPMCPDPA-S2_GB_121202 Page 2/6 ABB Printed in Switzerland – Modifications reserved...
The dry port X2…X4 with voltage-free contacts may also be used for automatic shutdown in connection with WAVEMON Software. It is necessary to provide a cable of 0.5 mm2 to connect Terminals X2..X4 of the UPS and the serial port of the server. 04-3008_S9_ABB_OPMCPDPA-S2_GB_121202 Page 3/6 ABB Printed in Switzerland – Modifications reserved...
Page 92
The main principle is: let introduce a shutdown of a Server only when strictly necessary. A correct Parallel Handling has therefore to manage a parallel system as a whole and always considering redundancy. Following statements apply: 04-3008_S9_ABB_OPMCPDPA-S2_GB_121202 Page 4/6 ABB Printed in Switzerland – Modifications reserved...
(downtime) or by a countdown timer which is started at the beginning of the alarm. A shut down is therefore possible without extra input from the operator, and is fully software controlled. 04-3008_S9_ABB_OPMCPDPA-S2_GB_121202 Page 5/6 ABB Printed in Switzerland – Modifications reserved...
Page 94
The new release RCCMD2 is an application available for all Operating Systems, analogous to PMC-Software. Our SNMP Interfaces are compatible to RCCMD. 04-3008_S9_ABB_OPMCPDPA-S2_GB_121202 Page 6/6 ABB Printed in Switzerland – Modifications reserved...
(depending on Module power and type of load) Very low input current distortion THDi Gen-set power and installation cost saving THDi = < 3 - 4% for loads of 100 – 25 % 04-3008_S10_ABB_TDSCPDPA-S2_GB_121202 Page 3/19 ABB Printed in Switzerland – Modifications reserved...
60 sec. Inverter : up to 3 x In during 40 ms Output short capability (RMS) Bypass : 10 x In during 10 ms Crest - Factor 3 : 1 04-3008_S10_ABB_TDSCPDPA-S2_GB_121202 Page 7/19 ABB Printed in Switzerland – Modifications reserved...
DIAGNOSIS (SERVICE MODE) for adjustments and testing (for more details see the USER MANUAL of Conceptpower DPA S2). Power Management Display (PMD) of Conceptpower DPM 04-3008_S10_ABB_TDSCPDPA-S2_GB_121202 Page 11/19 ABB Printed in Switzerland – Modifications reserved...
SNMP-Card. Both can manage a parallel system (N modules) and return either global values - which are consistent for the whole parallel system - or specific values from the single modules. External SNMP-Adapter Ethernet Internal SNMP-Card 04-3008_S10_ABB_TDSCPDPA-S2_GB_121202 Page 13/19 ABB Printed in Switzerland – Modifications reserved...
2553 Load per Module (EN 62040-1-1:2003) Heat Dissipation with 100% Non-linear 5227 6969 8712 Load per Module (EN 62040-1-1:2003) Airflow (25° - 30°C) with Non-linear Load per Module (EN 62040-1-1:2003) 04-3008_S10_ABB_TDSCPDPA-S2_GB_121202 Page 16/19 ABB Printed in Switzerland – Modifications reserved...
3x120* 3x250A 5x120 or 5x(2x50) 5x120 or 5x(2x50) 232 A 3x350A* 3x(2x70)* 3x315A 5x185 or 5x(2x70) 5x185 or 5x(2x70) 290 A 3x450A* 3x(2x95)* *1 only valid for common battery use 04-3008_S10_ABB_TDSCPDPA-S2_GB_121202 Page 18/19 ABB Printed in Switzerland – Modifications reserved...
5x120 or 5x(2x50) 3x250A 232 A 3x350A* 3x(2x70)* 4x(2x50) 5x(2x50) 4x185 or 5x185 or 3x315A 5x185 or 5x(2x70) 3x315A 290 A 3x450A* 3x(2x95)* 4x(2x70) 5x(2x70) *1 only valid for common battery use 04-3008_S10_ABB_TDSCPDPA-S2_GB_121202 Page 19/19 ABB Printed in Switzerland – Modifications reserved...