Connecting the refrigerant piping ........... 4 This installation manual concerns UM heat recovery of the Selection of piping material ............4 Panasonic “CU-∗∗ME1XPK” series. These units are designed for Example of connection ..............5 outdoor installation and used for cooling and heatpump Leak test and vacuum drying ............
2. Lift the unit preferably with a crane AIN COMPONENTS and 2 belts(1) of at least 8m long. For main components and function of the main components, refer 3. When lifting the unit with a crane, always use protectors(2) to to the Engineering Data Book.
Connecting the refrigerant piping 5. Protection against contamination when installing pipes - Take measures to prevent foreign materials like moisture and contamination from mixing into the system. 1. Installation of refrigerant piping is possible as front connection, side connection and bottom connection. Place Installation period Protection method...
- This outdoor unit is factory charged with refrigerant and Leak test and vacuum drying depending on pipe sizes and pipe lengths some systems require additional charging of refrigerant. The units were checked for leaks by the manufacturer. - Charge the refrigerant to the liquid pipe in its liquid state. Since Confirm that the valves are firmly closed before pressure test or R407-C is a mixed refrigerant, its composition changes if vacuuming.
Sequential start Examples Make the outdoor unit cable connections shown below. System example (refer to figure 5) The outdoor unit PC board (A1P) is factory set at “Sequential start available”. 1 field power supply 2 main switch 3 earth leak detector 4 fuse 5 HR box 6 indoor unit...
EFORE OPERATION Operation check - Temperature regulating operation check 1. Perform the cross wiring - cross piping check as described in Checks before initial start-up “ ” attached on the rear of the upper front CAUTIONS ON OPERATION panel. 2. Set the unit to “ ” mode using the cool/heat selector (heatpump units only) or the indoor remote controller.
How to operate stop valves (refer to figure 11) Maximum concentration level 1. To open The maximum charge of refrigerant and the calculation of the 1. Remove the cap (1) and turn the shaft (2) counterclockwise with maximum concentration of refrigerant is directly related to the hexagon socket screw keys (JIS B 4648 nominal size 6 mm and humanly occupied space in to which it could leak.
Page 12
4. Dealing with the situations where the result exceeds the maximum concentration level. Where the installation of a facility results in a concentration in excess of the maximum concentration level then it will be necessary to revise the system. Please consult your Panasonic supplier.