Pressure Control Solenoid Valves Inspection - Suzuki SX4 Service Manual

Hide thumbs Also See for SX4:
Table of Contents
5A-98 Automatic Transmission/Transaxle:
10) Remove valve body assembly referring to
"Automatic Transaxle Unit Disassembly".
11) Remove pressure control solenoid valve and TCC
pressure control solenoid valve referring to "Valve
Body Assembly Disassembly and Reassembly".
Installation
Reverse removal procedure to install pressure control
solenoid valve and valve body assembly noting the
following points.
• For detail of pressure control solenoid valve and TCC
pressure control solenoid valve installation, refer to
"Valve Body Assembly Disassembly and
Reassembly".
• For detail of valve body assembly installation, refer to
"Automatic Transaxle Unit Assembly".
• For detail of installing wire harness for solenoid valves
and sensor, refer to "Automatic Transaxle Unit
Assembly". Use new O-rings.
• For detail of A/T oil pan and oil strainer assembly
installation, refer to "Automatic Transaxle Unit
Assembly". Use new oil pan gasket.
• Pour A/T fluid and check fluid level according to
procedure described in "A/T Fluid Change".
• Check for fluid leakage after warming up A/T.

Pressure Control Solenoid Valves Inspection

CAUTION
!
• Be very careful as dust etc. does enter
when pressure control solenoid valves are
inspected.
Resistance Check
Measure resistance between pressure control solenoid
valves (Pressure control solenoid and TCC pressure
control solenoid) (1) terminals.
Pressure control solenoid valve and TCC pressure
control solenoid valve resistance
Standard: 5.0 – 5.6 Ω at 20 °C (68 °F)
S7RW0A5106025
1
I2RH01510071-01
Operation Check
Check pressure control solenoid valves (Pressure
control solenoid and TCC pressure control solenoid)
operation in the either manner of the following.
Using regulated DC power supply
1) Connect pressure control solenoid valve (1) with
regulated DC power supply (2) as shown in figure.
2) Turn regulated DC power supply switch ON and
increase voltage of power supply keeping current
within 1.0 A.
3) Check for gradual movement of valve (3) in the
direction of arrow "A" as voltage is increased.
4) Check movement of valve (3) in the direction of
arrow "B" as voltage is decreased.
5) Turn power supply switch OFF.
CAUTION
!
Do not pass current 1.0 A or more, or
pressure control solenoid is burned out.
I2RH0B510064-01
Table of Contents
loading

Table of Contents